-
1
-
-
84871245516
-
Integrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint
-
Lu Z, Zhang Y, Han X (2013) Integrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint. Int J Prod Res 51(5):1379–1391. doi:10.1080/00207543.2012.693637
-
(2013)
Int J Prod Res
, vol.51
, Issue.5
, pp. 1379-1391
-
-
Lu, Z.1
Zhang, Y.2
Han, X.3
-
2
-
-
33749503018
-
Planning machine maintenance in two-machine shop scheduling
-
Kubzin MA, Strusevich VA (2006) Planning machine maintenance in two-machine shop scheduling. Oper Res 54(4):789–800. doi:10.1287/opre.1060.0301
-
(2006)
Oper Res
, vol.54
, Issue.4
, pp. 789-800
-
-
Kubzin, M.A.1
Strusevich, V.A.2
-
3
-
-
0035900864
-
Single-machine scheduling with maintenance and repair rate-modifying activities
-
Lee CY, Lin CS (2001) Single-machine scheduling with maintenance and repair rate-modifying activities. Eur J Oper Res 135(3):493–513. doi:10.1016/S0377-2217(00)00322-2
-
(2001)
Eur J Oper Res
, vol.135
, Issue.3
, pp. 493-513
-
-
Lee, C.Y.1
Lin, C.S.2
-
4
-
-
80052345300
-
Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems
-
Dehayem Nodem F, Kenné J, Gharbi A (2011) Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems. Int J Prod Econ 134(1):271–282. doi:10.1016/j.ijpe.2011.07.011
-
(2011)
Int J Prod Econ
, vol.134
, Issue.1
, pp. 271-282
-
-
Dehayem Nodem, F.1
Kenné, J.2
Gharbi, A.3
-
5
-
-
67749116576
-
Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
-
Berrichi A, Amodeo L, Yalaoui F, Châtelet E, Mezghiche M (2009) Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J Intell Manuf 20(4):389–400. doi:10.1007/s10845-008-0113-5
-
(2009)
J Intell Manuf
, vol.20
, Issue.4
, pp. 389-400
-
-
Berrichi, A.1
Amodeo, L.2
Yalaoui, F.3
Châtelet, E.4
Mezghiche, M.5
-
6
-
-
79551629459
-
An integrated production and maintenance planning model with time windows and shortage cost
-
Najid NM, Alaoui-Selsouli M, Mohafid A (2011) An integrated production and maintenance planning model with time windows and shortage cost. Int J Prod Res 49(8):2265–2283. doi:10.1080/00207541003620386
-
(2011)
Int J Prod Res
, vol.49
, Issue.8
, pp. 2265-2283
-
-
Najid, N.M.1
Alaoui-Selsouli, M.2
Mohafid, A.3
-
7
-
-
34249101884
-
Machine reliability and preventive maintenance planning for cellular manufacturing systems
-
Das K, Lashkari R, Sengupta S (2007) Machine reliability and preventive maintenance planning for cellular manufacturing systems. Eur J Oper Res 183(1):162–180. doi:10.1016/j.ejor.2006.09.079
-
(2007)
Eur J Oper Res
, vol.183
, Issue.1
, pp. 162-180
-
-
Das, K.1
Lashkari, R.2
Sengupta, S.3
-
8
-
-
84887127624
-
A sustainability approach for selecting maintenance strategy
-
Nezami FG, Yildirim MB (2013) A sustainability approach for selecting maintenance strategy. Int J Sustain Eng (ahead-of-print):1–12. doi:10.1080/19397038.2013.765928
-
(2013)
Int J Sustain Eng (ahead-of-print)
, pp. 1-12
-
-
Nezami, F.G.1
Yildirim, M.B.2
-
9
-
-
23244458542
-
An environmental analysis of machining. In: ASME International Mechanical Engineering Congress and RD&D Exposition
-
California: USA
-
Dahmus J, Gutowski T (2004) An environmental analysis of machining. In: ASME International Mechanical Engineering Congress and RD&D Exposition, Anaheim, California, USA
-
(2004)
Anaheim
-
-
Dahmus, J.1
Gutowski, T.2
-
11
-
-
84911005353
-
-
EIA.GOV (2011). Accessed May 2013
-
EIA.GOV (2011) http://www.eia.gov/forecasts/ieo/pdf/0484%282011%29.pdf. Accessed May 2013
-
-
-
-
12
-
-
84911005513
-
-
DOE. Accessed May 2013
-
DOE http://www1.eere.energy.gov/manufacturing/tech_assistance/iacs.html. Accessed May 2013
-
-
-
-
13
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran GR, Yanasse HH (1982) Computational complexity of the capacitated lot size problem. Manag Sci 28(10):1174–1186. doi:10.1287/mnsc.28.10.1174
-
(1982)
Manag Sci
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
14
-
-
0038813446
-
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
-
Cassady CR, Kutanoglu E (2003) Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Trans 35(6):503–513. doi:10.1080/07408170304416
-
(2003)
IIE Trans
, vol.35
, Issue.6
, pp. 503-513
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
15
-
-
77958072496
-
Single-machine-based production scheduling model integrated preventive maintenance planning
-
Pan E, Liao W, Xi L (2010) Single-machine-based production scheduling model integrated preventive maintenance planning. Int J Adv Manuf Technol 50(1–4):365–375. doi:10.1007/s00170-009-2514-9
-
(2010)
Int J Adv Manuf Technol
, vol.50
, Issue.1-4
, pp. 365-375
-
-
Pan, E.1
Liao, W.2
Xi, L.3
-
16
-
-
22444439337
-
Integrating preventive maintenance planning and production scheduling for a single machine
-
Cassady CR, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. Reliab IEEE Trans 54(2):304–309. doi:10.1109/TR.2005.845967
-
(2005)
Reliab IEEE Trans
, vol.54
, Issue.2
, pp. 304-309
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
17
-
-
77957918240
-
Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities
-
Yang SJ, Yang DL (2010) Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities. Comput Math Appl 60(7):2161–2169. doi:10.1016/j.camwa.2010.08.003
-
(2010)
Comput Math Appl
, vol.60
, Issue.7
, pp. 2161-2169
-
-
Yang, S.J.1
Yang, D.L.2
-
18
-
-
33947276768
-
An integrated production and preventive maintenance planning model
-
Aghezzaf EH, Jamali M, Ait-Kadi D (2007) An integrated production and preventive maintenance planning model. Eur J Oper Res 181(2):679–685. doi:10.1016/j.ejor.2006.06.032
-
(2007)
Eur J Oper Res
, vol.181
, Issue.2
, pp. 679-685
-
-
Aghezzaf, E.H.1
Jamali, M.2
Ait-Kadi, D.3
-
19
-
-
0033198250
-
Integrating maintenance and production decisions in a hierarchical production planning environment
-
Weinstein L, Chung C-H (1999) Integrating maintenance and production decisions in a hierarchical production planning environment. Comput Oper Res 26(10):1059–1074. doi:10.1016/S0305-0548(99)00022-2
-
(1999)
Comput Oper Res
, vol.26
, Issue.10
, pp. 1059-1074
-
-
Weinstein, L.1
Chung, C.-H.2
-
20
-
-
0030413151
-
A production and maintenance planning model for the process industry
-
Ashayeri J, Teelen A, SELENJ W (1996) A production and maintenance planning model for the process industry. Int J Prod Res 34(12):3311–3326. doi:10.1080/00207549608905092
-
(1996)
Int J Prod Res
, vol.34
, Issue.12
, pp. 3311-3326
-
-
Ashayeri, J.1
Teelen, A.2
SELENJ, W.3
-
21
-
-
0035844948
-
Interactions of maintenance and production planning for multipurpose process plants—a system effectiveness approach
-
Pistikopoulos EN, Vassiliadis CG, Arvela J, Papageorgiou LG (2001) Interactions of maintenance and production planning for multipurpose process plants—a system effectiveness approach. Ind Eng Chem Res 40(14):3195–3207. doi:10.1021/ie000431q
-
(2001)
Ind Eng Chem Res
, vol.40
, Issue.14
, pp. 3195-3207
-
-
Pistikopoulos, E.N.1
Vassiliadis, C.G.2
Arvela, J.3
Papageorgiou, L.G.4
-
23
-
-
84868553213
-
Joint optimisation of maintenance and production policies considering random demand and variable production rate
-
Ayed S, Sofiene D, Nidhal R (2012) Joint optimisation of maintenance and production policies considering random demand and variable production rate. Int J Prod Res 50(23):6870–6885. doi:10.1080/00207543.2011.631601
-
(2012)
Int J Prod Res
, vol.50
, Issue.23
, pp. 6870-6885
-
-
Ayed, S.1
Sofiene, D.2
Nidhal, R.3
-
24
-
-
33845902056
-
Preventive maintenance optimization under cost and profit criteria for manufacturing equipment
-
Sánchez A, Goti A (2006) Preventive maintenance optimization under cost and profit criteria for manufacturing equipment. Proc ESREL 2006:607–612
-
(2006)
Proc ESREL
, vol.2006
, pp. 607-612
-
-
Sánchez, A.1
Goti, A.2
-
25
-
-
78751690651
-
Energy consumption modeling for machine tools after preventive maintenance
-
Yan J, Hua D (2010) Energy consumption modeling for machine tools after preventive maintenance. IEEE International Conference on IEEM, pp 2201–2205
-
(2010)
IEEE International Conference on IEEM
, pp. 2201-2205
-
-
Yan, J.1
Hua, D.2
-
28
-
-
79952466311
-
Optimal preventive maintenance and replacement schedules with variable improvement factor
-
Moghaddam KS, Usher JS (2010) Optimal preventive maintenance and replacement schedules with variable improvement factor. J Qual Maint Eng 16(3):271–287. doi:10.1080/00207543.2012.693637
-
(2010)
J Qual Maint Eng
, vol.16
, Issue.3
, pp. 271-287
-
-
Moghaddam, K.S.1
Usher, J.S.2
-
29
-
-
84883609266
-
A partial adjustment model of US electricity demand by region, season, and sector
-
Washington: DC
-
Paul A, Myers E, Palmer K (2009) A partial adjustment model of US electricity demand by region, season, and sector. Resource for the Future Discussion Paper 08–50, Washington, DC
-
(2009)
Resource for the Future Discussion Paper 08–50
-
-
Paul, A.1
Myers, E.2
Palmer, K.3
-
30
-
-
84880571777
-
Joint decision making for maintenance and production scheduling of production systems
-
Lee S, Ni J (2013) Joint decision making for maintenance and production scheduling of production systems. Int J Adv Manuf Technol 66:1135–1146. doi:10.1007/s00170-012-4395-6
-
(2013)
Int J Adv Manuf Technol
, vol.66
, pp. 1135-1146
-
-
Lee, S.1
Ni, J.2
-
31
-
-
84911005181
-
-
Springer, Berlin:
-
Helu M, Rul J, Dornfeld D et al (2011) Evaluating trade-offs between sustainability, performance, and cost of green machining technologies, glocalized solutions for sustainability in manufacturing. Springer, Berlin, pp 195–200
-
(2011)
Evaluating trade-offs between sustainability, performance, and cost of green machining technologies, glocalized solutions for sustainability in manufacturing
, pp. 195-200
-
-
Helu, M.1
Rul, J.2
Dornfeld, D.3
-
32
-
-
4544365515
-
A cutting power model for tool wear monitoring in milling
-
Shao H, Wang H, Zhao X (2004) A cutting power model for tool wear monitoring in milling. Int J Mach Tools Manuf 44(14):1503–1509. doi:10.1016/j.ijmachtools.2004.05.003
-
(2004)
Int J Mach Tools Manuf
, vol.44
, Issue.14
, pp. 1503-1509
-
-
Shao, H.1
Wang, H.2
Zhao, X.3
|