-
1
-
-
0003469953
-
-
Marcel Dekker,New York, NY
-
Ascher, H.E. and Feingold, H. (1984), Repairable Systems Reliability: Modeling, Inference, Misconceptions, and Their Causes, Marcel Dekker, New York, NY.
-
(1984)
Repairable Systems Reliability: Modeling, Inference, Misconceptions, And Their Causes
-
-
Ascher, H.E.1
Feingold, H.2
-
2
-
-
33749641002
-
Optimizing preventive maintenance models
-
DOI 10.1007/s10589-006-6449-x
-
Bartholomew-Biggs, M., Christianson, B. and Zuo, M. (2006), "Optimizing preventive maintenance models", Computational Optimization and Applications, Vol. 35 No. 2, pp. 261-79. (Pubitemid 44546766)
-
(2006)
Computational Optimization and Applications
, vol.35
, Issue.2
, pp. 261-279
-
-
Bartholomew-Biggs, M.1
Christianson, B.2
Zuo, M.3
-
3
-
-
84888384545
-
Preventive maintenance scheduling via particle swarm optimization method
-
Che-Hua, L. (2007), "Preventive maintenance scheduling via particle swarm optimization method", International Multi Conference of Engineers and Computer Scientists, 21-23 March, Kowloon, China, Vol. 1, pp. 121-6.
-
(2007)
International Multi Conference of Engineers and Computer Scientists, 21-23 March, Kowloon, China
, vol.1
, pp. 121-126
-
-
Che-Hua, L.1
-
4
-
-
14544272583
-
The periodic preventive maintenance policy for deteriorating systems by using improvement factor model
-
Cheng, C.Y. and Chen, M.C. (2003), "The periodic preventive maintenance policy for deteriorating systems by using improvement factor model", International Journal Applied Science and Engineering, Vol. 1 No. 2, pp. 114-22.
-
(2003)
International Journal Applied Science and Engineering
, vol.1
, Issue.2
, pp. 114-122
-
-
Cheng, C.Y.1
Chen, M.C.2
-
5
-
-
40649106259
-
The optimal periodic preventive maintenance policy with degradation rate reduction under reliability limit
-
DOI 10.1109/IEEM.2007.4419270, 4419270, IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management
-
Cheng, C.Y., Chen, M. and Guo, R. (2007), "The optimal periodic preventive maintenance policy with degradation rate reduction under reliability limit", 2007 IEEE International Conference on Industrial Engineering and Engineering Management, 2-4 December, Singapore, pp. 649-53. (Pubitemid 351371078)
-
(2007)
IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management
, pp. 649-653
-
-
Cheng, C.Y.1
Chen, M.2
Guo, R.3
-
6
-
-
0032121108
-
An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures
-
PII S0360835297002817
-
Dedopoulos, I.T. and Smeers, Y. (1998), "Age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures", Computers and Industrial Engineering, Vol. 34 No. 3, pp. 643-54. (Pubitemid 128674732)
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.3
, pp. 643-654
-
-
Dedopoulos, I.T.1
Smeers, Y.2
-
7
-
-
33644620483
-
Age-based hybrid model for imperfect preventive maintenance
-
El-Ferik, S. and Ben-Daya, M. (2006), "Age-based hybrid model for imperfect preventive maintenance", IIE Transactions, Vol. 38 No. 4, pp. 365-75.
-
(2006)
IIE Transactions
, vol.38
, Issue.4
, pp. 365-375
-
-
El-Ferik, S.1
Ben-Daya, M.2
-
8
-
-
33845270417
-
Optimal preventive maintenance of leased equipment with corrective minimal repairs
-
DOI 10.1016/j.ejor.2005.01.049, PII S0377221705002006
-
Jaturonnatee, J., Murthy, D.N.P. and Boondiskulchok, R. (2006), "Optimal preventive maintenance of leased equipment with corrective minimal repairs", European Journal of 8 Operational Research, Vol. 174 No. 1, pp. 201-15. (Pubitemid 44866832)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 201-215
-
-
Jaturonnatee, J.1
Murthy, D.N.P.2
Boondiskulchok, R.3
-
9
-
-
0026837810
-
Cost optimization of maintenance scheduling for a system with assured reliability
-
Jayabalan, V. and Chaudhuri, D. (1992), "Cost optimization of maintenance scheduling for a system with assured reliability", IEEE Transactions on Reliability, Vol. 41 No. 1, pp. 21-5.
-
(1992)
IEEE Transactions on Reliability
, vol.41
, Issue.1
, pp. 21-25
-
-
Jayabalan, V.1
Chaudhuri, D.2
-
10
-
-
33947110348
-
Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances
-
DOI 10.1142/S0217595907001139
-
Lim, J.H. and Park, D.H. (2007), "Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances", Asia-Pacific Journal of Operational Research, Vol. 24 No. 1, pp. 111-24. (Pubitemid 46411094)
-
(2007)
Asia-Pacific Journal of Operational Research
, vol.24
, Issue.1
, pp. 111-124
-
-
Lim, J.-H.1
Park, D.H.2
-
11
-
-
0035281197
-
Sequential imperfect preventive maintenance models with two categories of failure modes
-
DOI 10.1002/1520-6750(200103)48:2<172::AID-NAV5>3.0.CO;2-5
-
Lin, D., Zuo, M.J. and Yam, R.C.M. (2001), "Sequential imperfect preventive maintenance models with two categories of failure modes", Naval Research Logistics, Vol. 48 No. 2, pp. 172-83. (Pubitemid 32252186)
-
(2001)
Naval Research Logistics
, vol.48
, Issue.2
, pp. 172-183
-
-
Lin, D.1
Zuo, M.J.2
Yam, R.C.M.3
-
12
-
-
0018517702
-
Reliable preventive maintenance scheduling
-
Malik, M.A.K. (1979), "Reliable preventive maintenance scheduling", AIIE Transactions, Vol. 11 No. 3, pp. 221-8.
-
(1979)
AIIE Transactions
, vol.11
, Issue.3
, pp. 221-8
-
-
Malik, M.A.K.1
-
13
-
-
0033117187
-
Age-dependent reliability model considering effects of maintenance and working conditions
-
Martorell, S., Sanchez, A. and Serradell, V. (1999), "Age-dependent reliability model considering effects of maintenance and working conditions", Reliability Engineering and System Safety, Vol. 64 No. 1, pp. 19-31.
-
(1999)
Reliability Engineering and System Safety
, vol.64
, Issue.1
, pp. 19-31
-
-
Martorell, S.1
Sanchez, A.2
Serradell, V.3
-
14
-
-
0024054513
-
Sequential imperfect preventive maintenance policies
-
Nakagawa, T. (1988), "Sequential imperfect preventive maintenance policies", IEEE Transactions on Reliability, Vol. 37 No. 3, pp. 295-8.
-
(1988)
IEEE Transactions on Reliability
, vol.37
, Issue.3
, pp. 295-198
-
-
Nakagawa, T.1
-
15
-
-
0032280892
-
Cost-optimal preventive maintenance and replacement scheduling
-
Usher, J.S., Kamal, A.H. and Hashmi, S.W. (1998), "Cost-optimal preventive maintenance and replacement scheduling", IIE Transactions, Vol. 30 No. 12, pp. 1121-8.
-
(1998)
IIE Transactions
, vol.30
, Issue.12
, pp. 1121-8
-
-
Usher, J.S.1
Kamal, A.H.2
Hashmi, S.W.3
-
16
-
-
28744459208
-
Research on sequential preventive maintenance policy in finite time horizon
-
Xi, L.F., Zhou, X.J. and Lee, J. (2005), "Research on sequential preventive maintenance policy in finite time horizon", Computer Integrated Manufacturing Systems, Vol. 11 No. 10, pp. 1465-8. (Pubitemid 41753478)
-
(2005)
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
, vol.11
, Issue.10
, pp. 1465-1468
-
-
Xi, L.-F.1
Zhou, X.-J.2
Lee, J.3
|