메뉴 건너뛰기




Volumn 49, Issue 8, 2011, Pages 2265-2283

An integrated production and maintenance planning model with time windows and shortage cost

Author keywords

bullwhip effect; logistics; manufacturing control systems; manufacturing management; manufacturing processes; manufacturing strategy; materials management; production control; production management; supply chain management

Indexed keywords

BULLWHIP EFFECTS; MANUFACTURING CONTROL SYSTEMS; MANUFACTURING MANAGEMENT; MANUFACTURING PROCESSES; MANUFACTURING STRATEGY; MATERIALS MANAGEMENT; PRODUCTION MANAGEMENT;

EID: 79551629459     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207541003620386     Document Type: Article
Times cited : (87)

References (44)
  • 1
    • 34848866290 scopus 로고    scopus 로고
    • The multi capacitated lot sizing problem with set up time and shortage costs
    • Absi, N. and Kedad-Sidhoum, S., 2008. The multi capacitated lot sizing problem with set up time and shortage costs. European Journal of Operational Research, 185 (3), 1351-1374.
    • (2008) European Journal of Operational Research , vol.185 , Issue.3 , pp. 1351-1374
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 2
    • 64549109311 scopus 로고    scopus 로고
    • The multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages
    • Absi, N. and Kedad-Sidhoum, S., 2009. The multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages. European Journal of Operational Research, 36 (11), 2926-2936.
    • (2009) European Journal of Operational Research , vol.36 , Issue.11 , pp. 2926-2936
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 4
    • 45849131693 scopus 로고    scopus 로고
    • Integrated production and preventive maintenance in production systems subject to random failures
    • Aghezzaf, E.H. and Najid, M.N., 2008. Integrated production and preventive maintenance in production systems subject to random failures. Information Science, 178 (17), 3382-3392.
    • (2008) Information Science , vol.178 , Issue.17 , pp. 3382-3392
    • Aghezzaf, E.H.1    Najid, M.N.2
  • 6
    • 0021850598 scopus 로고
    • The determination of maintenance strategies for plants subject to breakdown
    • Bäackert, W. and Rippin, D., 1985. The determination of maintenance strategies for plants subject to breakdown. Computers and Chemical Engineering, 9 (2), 113-126.
    • (1985) Computers and Chemical Engineering , vol.9 , Issue.2 , pp. 113-126
    • Bäackert, W.1    Rippin, D.2
  • 7
    • 0021513251 scopus 로고
    • Strong formulations for multi-item capacitated lot sizing
    • Barany, I., Van Roy, T.J., and Wolsey, L.A., 1984. Strong formulations for multi-item capacitated lot sizing. Management Science, 30 (10), 1255-1261.
    • (1984) Management Science , vol.30 , Issue.10 , pp. 1255-1261
    • Barany, I.1    Van Roy, T.J.2    Wolsey, L.A.3
  • 10
    • 34047180652 scopus 로고    scopus 로고
    • Optimal production, maintenance and lockout control policies in manufacturing systems
    • Charlot, E., Kenné, J.P., and Nadeau, S., 2007. Optimal production, maintenance and lockout control policies in manufacturing systems. International Journal of Production Economics, 107 (2), 435-450.
    • (2007) International Journal of Production Economics , vol.107 , Issue.2 , pp. 435-450
    • Charlot, E.1    Kenné, J.P.2    Nadeau, S.3
  • 11
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with random failing production unit submitted to regular preventive maintenance
    • Chelbi, A. and Ait-Kadi, D., 2004. Analysis of a production/inventory system with random failing production unit submitted to regular preventive maintenance. European Journal of Operational Research, 156 (3), 712-718.
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 712-718
    • Chelbi, A.1    Ait-Kadi, D.2
  • 12
    • 0037954442 scopus 로고    scopus 로고
    • Approximations to production lot sizing with machine breakdowns
    • Chung, K., 2003. Approximations to production lot sizing with machine breakdowns. Computers & Operations Research, 30 (10), 1499-1507.
    • (2003) Computers & Operations Research , vol.30 , Issue.10 , pp. 1499-1507
    • Chung, K.1
  • 13
    • 79551636822 scopus 로고    scopus 로고
    • Prompt a decision support system for opportunity based preventive maintenance
    • Dekker, R. and Van Rijn, C., 1996. Prompt a decision support system for opportunity based preventive maintenance. Reliability and Maintenance of Complex Systems, 154, 530-549.
    • (1996) Reliability and Maintenance of Complex Systems , vol.154 , pp. 530-549
    • Dekker, R.1    Van Rijn, C.2
  • 14
    • 65249085687 scopus 로고    scopus 로고
    • Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times
    • Dhouib, K., Gharbi, A., and Ayed, S., 2008. Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times. International Journal of Production Research, 46 (2), 5651-5677.
    • (2008) International Journal of Production Research , vol.46 , Issue.2 , pp. 5651-5677
    • Dhouib, K.1    Gharbi, A.2    Ayed, S.3
  • 15
    • 0026872617 scopus 로고
    • Capacitated lot-sizing and scheduling by Lagrangean relaxation
    • Diaby, M., et al., 1992. Capacitated lot-sizing and scheduling by Lagrangean relaxation. European Journal of Operational Research, 59 (3), 444-458.
    • (1992) European Journal of Operational Research , vol.59 , Issue.3 , pp. 444-458
    • Diaby, M.1
  • 16
    • 21844488838 scopus 로고
    • Planning the size and organization of KLM's aircraft maintenance personnel
    • Dijkstra, M., et al., 1994. Planning the size and organization of KLM's aircraft maintenance personnel. Interfaces, 24 (6), 47-58.
    • (1994) Interfaces , vol.24 , Issue.6 , pp. 47-58
    • Dijkstra, M.1
  • 17
    • 0023456043 scopus 로고
    • Solving multi-item capacitated lot sizing problems using variable redefinition
    • Eppen, G.D. and Martin, R.K., 1987. Solving multi-item capacitated lot sizing problems using variable redefinition. Operations Research, 35 (6), 832-848.
    • (1987) Operations Research , vol.35 , Issue.6 , pp. 832-848
    • Eppen, G.D.1    Martin, R.K.2
  • 19
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiplemachine manufacturing systems
    • Gharbi, A. and Kenné, J.P., 2005. Maintenance scheduling and production control of multiplemachine manufacturing systems. Computers & Industrial Engineering, 48 (4), 693-707.
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.4 , pp. 693-707
    • Gharbi, A.1    Kenné, J.P.2
  • 20
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • Groenevelt, H., Pintelon, L., and Seidmann, A., 1992. Production batching with machine breakdowns and safety stocks. Operations Research, 40 (5), 959-971. (Pubitemid 23581842)
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 959-971
    • Groenevelt Harry1    Pintelon Liliane2    Seidmann Abraham3
  • 21
    • 0036568125 scopus 로고    scopus 로고
    • Integrated maintenance and production control of a deteriorating production system
    • Iravani, S. and Duenyas, I., 2002. Integrated maintenance and production control of a deteriorating production system. IIE Transactions, 34 (5), 423-435.
    • (2002) IIE Transactions , vol.34 , Issue.5 , pp. 423-435
    • Iravani, S.1    Duenyas, I.2
  • 22
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • Karimi, B., Fatemi Ghomi, S.M.T., and Wilson, J.M., 2003. The capacitated lot sizing problem: a review of models and algorithms. Omega, 31 (5), 365-378.
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 23
    • 0020305108 scopus 로고
    • A heuristic algorithm for the multi-item lot sizing problem with cacapacity constraints
    • Karni, R. and Roll, Y., 1982. A heuristic algorithm for the multi-item lot sizing problem with cacapacity constraints. AIIE Transactions, 14 (4), 249-259.
    • (1982) AIIE Transactions , vol.14 , Issue.4 , pp. 249-259
    • Karni, R.1    Roll, Y.2
  • 24
    • 0037278646 scopus 로고    scopus 로고
    • Hierarchical control of production and maintenance rates in manufacturing systems
    • Kenné, J.P. and Boukas, E., 2003. Hierarchical control of production and maintenance rates in manufacturing systems. Journal of Quality in Maintenance Engineering, 9 (1), 66-82.
    • (2003) Journal of Quality in Maintenance Engineering , vol.9 , Issue.1 , pp. 66-82
    • Kenné, J.P.1    Boukas, E.2
  • 25
    • 3242661796 scopus 로고    scopus 로고
    • Stochastic optimal production control problem with corrective maintenance
    • Kenné, J.P. and Gharbi, A., 2004. Stochastic optimal production control problem with corrective maintenance. Computers & Industrial Engineering, 46 (4), 865-875.
    • (2004) Computers & Industrial Engineering , vol.46 , Issue.4 , pp. 865-875
    • Kenné, J.P.1    Gharbi, A.2
  • 26
    • 0028769365 scopus 로고
    • A new heuristic approach for the multi-item dynamic lot sizing problem
    • Kirca, O. and Kokten, M., 1994. A new heuristic approach for the multi-item dynamic lot sizing problem. European Journal of Operational Research, 75 (2), 332-341.
    • (1994) European Journal of Operational Research , vol.75 , Issue.2 , pp. 332-341
    • Kirca, O.1    Kokten, M.2
  • 27
    • 16244374307 scopus 로고    scopus 로고
    • Optimal preventive maintenance of production system with an intermediate buffer
    • Kyriakidis, E.G. and Dimitrakos, T.D., 2006. Optimal preventive maintenance of production system with an intermediate buffer. European Journal of Operational Research, 168 (1), 86-99.
    • (2006) European Journal of Operational Research , vol.168 , Issue.1 , pp. 86-99
    • Kyriakidis, E.G.1    Dimitrakos, T.D.2
  • 28
    • 84974870384 scopus 로고
    • Multi-item single-level capacitated dynamic lot-sizing heuristics: A general review
    • Maes, J. and Van Wassenhove, L.N., 1988. Multi-item single-level capacitated dynamic lot-sizing heuristics: a general review. Journal of the Operational Research Society, 39 (11), 991-1004.
    • (1988) Journal of the Operational Research Society , vol.39 , Issue.11 , pp. 991-1004
    • Maes, J.1    Van Wassenhove, L.N.2
  • 29
    • 3543075815 scopus 로고
    • Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system
    • Makis, V. and Fung, J., 1995. Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system. Journal of Quality in Maintenance Engineering, 1 (4), 41-55.
    • (1995) Journal of Quality in Maintenance Engineering , vol.1 , Issue.4 , pp. 41-55
    • Makis, V.1    Fung, J.2
  • 30
    • 0242301611 scopus 로고    scopus 로고
    • Maintenance policies for a production system with constrained production rate and buffer capacity
    • Marquez, A.C., Gupta, J.N.D., and Heguedas, A.S., 2003. Maintenance policies for a production system with constrained production rate and buffer capacity. International Journal of Production Research, 41 (9), 1909-1926.
    • (2003) International Journal of Production Research , vol.41 , Issue.9 , pp. 1909-1926
    • Marquez, A.C.1    Gupta, J.N.D.2    Heguedas, A.S.3
  • 31
    • 56749150314 scopus 로고    scopus 로고
    • Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems
    • Radhoui, M., Rezg, N., and Chelbi, A., 2009. Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems. International Journal of Production Research, 47 (2), 389-402.
    • (2009) International Journal of Production Research , vol.47 , Issue.2 , pp. 389-402
    • Radhoui, M.1    Rezg, N.2    Chelbi, A.3
  • 32
    • 0031648198 scopus 로고    scopus 로고
    • A generalized economic model for joint determination of production run, inspection schedule and control chart design
    • Rahim, M. and Ben-Daya, M., 1998. A generalized economic model for joint determination of production run, inspection schedule and control chart design. International Journal of Production Research, 36 (1), 277-289.
    • (1998) International Journal of Production Research , vol.36 , Issue.1 , pp. 277-289
    • Rahim, M.1    Ben-Daya, M.2
  • 33
    • 27944431675 scopus 로고    scopus 로고
    • Modeling and optimizing a joint inventory control and preventive maintenance strategy for a randomly failing production unit: Analytical and simulation approaches
    • Rezg, N., Chelbi, A., and Xie, X., 2005. Modeling and optimizing a joint inventory control and preventive maintenance strategy for a randomly failing production unit: analytical and simulation approaches. International Journal of Computer Integrated Manufacturing, 18 (2), 225-235.
    • (2005) International Journal of Computer Integrated Manufacturing , vol.18 , Issue.2 , pp. 225-235
    • Rezg, N.1    Chelbi, A.2    Xie, X.3
  • 34
    • 85016307418 scopus 로고    scopus 로고
    • Incorporating maintenance activities into production planning; Integration at the master schedule versus material requirements level
    • Rosheil, T.D. and Christy, D.P., 1996. Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level. International Journal of Production Research, 34 (2), 421-446.
    • (1996) International Journal of Production Research , vol.34 , Issue.2 , pp. 421-446
    • Rosheil, T.D.1    Christy, D.P.2
  • 35
    • 0025432875 scopus 로고
    • A forward algorithm for the capacitated lot size model with stockouts
    • Sandbothe, R.A. and Thompson, G.L., 1990. A forward algorithm for the capacitated lot size model with stockouts. Operations Research, 38 (3), 474-486.
    • (1990) Operations Research , vol.38 , Issue.3 , pp. 474-486
    • Sandbothe, R.A.1    Thompson, G.L.2
  • 36
    • 0027627281 scopus 로고
    • MRSRP-a tool for manpower resources and spares requirements planning
    • Shenoy, D. and Bhadury, B., 1993. MRSRP-a tool for manpower resources and spares requirements planning. Computers and Industrial Engineering, 24 (3), 421-439.
    • (1993) Computers and Industrial Engineering , vol.24 , Issue.3 , pp. 421-439
    • Shenoy, D.1    Bhadury, B.2
  • 37
    • 0030291874 scopus 로고    scopus 로고
    • Production-inventory systems with preventive maintenance
    • Srinivasan, M. and Lee, H., 1996. Production-inventory systems with preventive maintenance. IIE Transactions, 28 (11), 879-890.
    • (1996) IIE Transactions , vol.28 , Issue.11 , pp. 879-890
    • Srinivasan, M.1    Lee, H.2
  • 38
    • 0022230531 scopus 로고
    • Lagrangean relaxation for the multi-item capacitated lot-sizing problem: A heuristic implementation
    • Thizy, J.M. and Van Wassenhove, L.N., 1985. Lagrangean relaxation for the multi-item capacitated lot-sizing problem: a heuristic implementation. IIE Transactions, 17 (4), 308-313.
    • (1985) IIE Transactions , vol.17 , Issue.4 , pp. 308-313
    • Thizy, J.M.1    Van Wassenhove, L.N.2
  • 39
    • 84985846009 scopus 로고
    • A simple heuristic for lot-sizing with setup times
    • Trigeiro, W.W., 1989. A simple heuristic for lot-sizing with setup times. Decision Science, 20 (2), 294-303.
    • (1989) Decision Science , vol.20 , Issue.2 , pp. 294-303
    • Trigeiro, W.W.1
  • 40
    • 0029287678 scopus 로고
    • Maintenance optimization of a production system with buffer capacity
    • Van der Duyn Schouten, F. and Vanneste, S., 1995. Maintenance optimization of a production system with buffer capacity. European Journal of Operational Research, 82 (2), 323-338.
    • (1995) European Journal of Operational Research , vol.82 , Issue.2 , pp. 323-338
    • Van Der Duyn, S.F.1    Vanneste, S.2
  • 41
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • Wang, H., 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3), 469-489.
    • (2002) European Journal of Operational Research , vol.139 , Issue.3 , pp. 469-489
    • Wang, H.1
  • 42
    • 0033198250 scopus 로고    scopus 로고
    • Integrating maintenance and production decisions in a hierarchical production planning environment
    • Weinstein, L. and Chung, C., 1999. Integrating maintenance and production decisions in a hierarchical production planning environment. Computers & Operations Research, 26 (10), 1059-1074.
    • (1999) Computers & Operations Research , vol.26 , Issue.10 , pp. 1059-1074
    • Weinstein, L.1    Chung, C.2
  • 43
    • 23844545243 scopus 로고    scopus 로고
    • Airline short-term maintenance manpower supply planning
    • Yan, S., Yang, T., and Chen, H., 2004. Airline short-term maintenance manpower supply planning. Transportation Research, 38 (9-10), 615-642.
    • (2004) Transportation Research , vol.38 , Issue.9-10 , pp. 615-642
    • Yan, S.1    Yang, T.2    Chen, H.3
  • 44
    • 1342308593 scopus 로고    scopus 로고
    • Optimal buffer inventory and preventive maintenance for an imperfect production process
    • Zequeira, R.I., Prida, B., and Valdes, J.E., 2004. Optimal buffer inventory and preventive maintenance for an imperfect production process. International Journal of Production Research, 42 (5), 959-974.
    • (2004) International Journal of Production Research , vol.42 , Issue.5 , pp. 959-974
    • Zequeira, R.I.1    Prida, B.2    Valdes, J.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.