메뉴 건너뛰기




Volumn 50, Issue 1-4, 2010, Pages 365-375

Single-machine-based production scheduling model integrated preventive maintenance planning

Author keywords

Effective age; Preventive maintenance; Production scheduling; Tardiness; Weight

Indexed keywords

COMPUTATIONAL RESULTS; EFFECTIVE AGE; INTEGRATED MODELS; INTEGRATED SCHEDULING; ITS EFFICIENCIES; MAINTENANCE PLANNING; MAINTENANCE TIME; NUMERICAL EXAMPLE; PREVENTIVE MAINTENANCE PLANNING; PRODUCTION PLANT; PRODUCTION SCHEDULING; SINGLE MACHINES; TARDINESS; WEIGHT; WEIGHTED TARDINESS;

EID: 77958072496     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-009-2514-9     Document Type: Article
Times cited : (105)

References (37)
  • 1
    • 30344445140 scopus 로고    scopus 로고
    • Optimization models for the machine scheduling problem with a single flexible maintenance activity
    • Chen JS (2006) Optimization models for the machine scheduling problem with a single flexible maintenance activity. Eng Optim 38:53-71
    • (2006) Eng Optim , vol.38 , pp. 53-71
    • Chen, J.S.1
  • 3
    • 38249012451 scopus 로고
    • Optimal minimal-repair and replacement problem with age dependent cost structure
    • Segawa Y, Ohnishi M, Ibaraki T (1992) Optimal minimal-repair and replacement problem with age dependent cost structure. Comput Math Appl 24:91-101
    • (1992) Comput Math Appl , vol.24 , pp. 91-101
    • Segawa, Y.1    Ohnishi, M.2    Ibaraki, T.3
  • 4
    • 0031707966 scopus 로고    scopus 로고
    • Some aspects of measuring maintenance in the process industry
    • Art RHPM, Knapp GM, Lawrence MJ (1998) Some aspects of measuring maintenance in the process industry. J Qual Maint Eng 4:6-11
    • (1998) J Qual Maint Eng , vol.4 , pp. 6-11
    • Rhpm, A.1    Knapp, G.M.2    Lawrence, M.J.3
  • 5
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt G (2000) Scheduling with limited machine availability. Eur J Oper Res 121:1-15
    • (2000) Eur J Oper Res , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 6
    • 84989688255 scopus 로고    scopus 로고
    • Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
    • Adiri I, Frostig E, Rinnooy KAHG (2006) Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs. Nav Res Logist 38:261-271
    • (2006) Nav Res Logist , vol.38 , pp. 261-271
    • Adiri, I.1    Frostig, E.2    Rinnooy, K.A.H.G.3
  • 7
    • 38249005916 scopus 로고
    • Capacitated two-parallel machine scheduling to minimize sum of job completion time
    • Lee CY, Liman SD (1993) Capacitated two-parallel machine scheduling to minimize sum of job completion time. Discrete Appl Math 41:211-222
    • (1993) Discrete Appl Math , vol.41 , pp. 211-222
    • Lee, C.Y.1    Liman, S.D.2
  • 8
    • 0002574777 scopus 로고
    • Minimizing the sum of job completion times on capacitated parallel machines
    • Mosheiov G (1994) Minimizing the sum of job completion times on capacitated parallel machines. Math Comput Model 20:91-99
    • (1994) Math Comput Model , vol.20 , pp. 91-99
    • Mosheiov, G.1
  • 9
    • 0032599488 scopus 로고    scopus 로고
    • Minimizing the makespan in the two-machine no-wait flow-shop with limited machine availability
    • Espinouse ML, Formanowicz P, Penz B (1999) Minimizing the makespan in the two-machine no-wait flow-shop with limited machine availability. Comput Ind Eng 32:497-500
    • (1999) Comput Ind Eng , vol.32 , pp. 497-500
    • Espinouse, M.L.1    Formanowicz, P.2    Penz, B.3
  • 10
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on a single machine
    • Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071-1078
    • (1999) J Oper Res Soc , vol.50 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 11
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • Lee CY (1996) Machine scheduling with an availability constraint. J Glob Optim 9:395-416
    • (1996) J Glob Optim , vol.9 , pp. 395-416
    • Lee, C.Y.1
  • 12
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • Liao CJ, Chen WJ (2003) Single-machine scheduling with periodic maintenance and nonresumable jobs. Comput Oper Res 30:1335-1347
    • (2003) Comput Oper Res , vol.30 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 13
    • 5144229863 scopus 로고    scopus 로고
    • An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
    • Sadfi C, Penz B, Rapine C, Blazewicz J, Formanowicz P (2005) An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. Eur J Oper Res 161:3-10
    • (2005) Eur J Oper Res , vol.161 , pp. 3-10
    • Sadfi, C.1    Penz, B.2    Rapine, C.3    Blazewicz, J.4    Formanowicz, P.5
  • 14
    • 59249094242 scopus 로고    scopus 로고
    • A block approach to earliness-tardiness scheduling problems
    • Wodecki M (2009) A block approach to earliness-tardiness scheduling problems. Int J Adv Manuf Technol 40:797-807
    • (2009) Int J Adv Manuf Technol , vol.40 , pp. 797-807
    • Wodecki, M.1
  • 15
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • Allaoui H, Artiba A (2004) Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Comput Ind Eng 47:431-450
    • (2004) Comput Ind Eng , vol.47 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 16
    • 26444492122 scopus 로고    scopus 로고
    • Two stage hybrid flow shop scheduling with availability constraints
    • Allaoui H, Artiba A (2006) Two stage hybrid flow shop scheduling with availability constraints. Comput Oper Res 33:1399-1419
    • (2006) Comput Oper Res , vol.33 , pp. 1399-1419
    • Allaoui, H.1    Artiba, A.2
  • 17
    • 33750007920 scopus 로고    scopus 로고
    • A bicriterian flow shop scheduling using artificial neural network
    • Haq AN, Ramanan TR (2006) A bicriterian flow shop scheduling using artificial neural network. Int J Adv Manuf Technol 30:1132-1138
    • (2006) Int J Adv Manuf Technol , vol.30 , pp. 1132-1138
    • Haq, A.N.1    Ramanan, T.R.2
  • 18
    • 0019546385 scopus 로고
    • Optimal maintenance models for systems subject to failure-A review
    • Sherif YS, Smith ML (1981) Optimal maintenance models for systems subject to failure-a review. Nav Res Logist Q 28:47-74
    • (1981) Nav Res Logist Q , vol.28 , pp. 47-74
    • Sherif, Y.S.1    Smith, M.L.2
  • 19
    • 77957088268 scopus 로고
    • Mathematical programming models and methods for production planning and scheduling
    • Graves SC, Rinnooy KAHG, Zipkin PH (eds). North-Holland, Amsterdam
    • Shapiro JF (1993) Mathematical programming models and methods for production planning and scheduling. In: Graves SC, Rinnooy KAHG, Zipkin PH (eds) Handbook in Operations Research and Management Science 4: Logistics of Production and Inventory. North-Holland, Amsterdam, pp 371-443
    • (1993) Handbook in Operations Research and Management Science 4: Logistics of Production and Inventory , pp. 371-443
    • Shapiro, J.F.1
  • 20
    • 0030106093 scopus 로고    scopus 로고
    • Application of maintenance optimization models: A review and analysis
    • Dekker R (1996) Application of maintenance optimization models: a review and analysis. Reliab Eng Syst Saf 51:229-240
    • (1996) Reliab Eng Syst Saf , vol.51 , pp. 229-240
    • Dekker, R.1
  • 21
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • Cassady CR, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54:304-309
    • (2005) IEEE Trans Reliab , vol.54 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 22
    • 0000700371 scopus 로고
    • Maintenance policies for stochastically failing equipment: A survey
    • McCall JJ (1965) Maintenance policies for stochastically failing equipment: a survey. Manag Sci 11:493-524
    • (1965) Manag Sci , vol.11 , pp. 493-524
    • McCall, J.J.1
  • 23
    • 0016995779 scopus 로고
    • A survey of maintenance models: The control and surveillance of deteriorating systems
    • Pierskalla WP, Voelker JA (1976) A survey of maintenance models: the control and surveillance of deteriorating systems. Nav Res Logist Q 23:353-388
    • (1976) Nav Res Logist Q , vol.23 , pp. 353-388
    • Pierskalla, W.P.1    Voelker, J.A.2
  • 24
    • 0024718118 scopus 로고
    • Survey of preventive maintenance models for stochastically deteriorating single-unit systems
    • Valdez-Flores C, Feldman RM (1989) Survey of preventive maintenance models for stochastically deteriorating single-unit systems. Nav Res Logist Q 36:419-446
    • (1989) Nav Res Logist Q , vol.36 , pp. 419-446
    • Valdez-Flores, C.1    Feldman, R.M.2
  • 25
    • 0032689342 scopus 로고    scopus 로고
    • Preventive maintenance and the interval availability distribution of an unreliable production system
    • Van Dijkhuizen G, van der Heijden M (1999) Preventive maintenance and the interval availability distribution of an unreliable production system. Reliab Eng Syst Saf 66:13-27
    • (1999) Reliab Eng Syst Saf , vol.66 , pp. 13-27
    • Van Dijkhuizen, G.1    Van Der Heijden, M.2
  • 26
    • 0037365039 scopus 로고    scopus 로고
    • On preventive maintenance policy of a critical reliability level for system subject to degradation
    • Zhao YX (2003) On preventive maintenance policy of a critical reliability level for system subject to degradation. Reliab Eng Syst Saf 79:301-308
    • (2003) Reliab Eng Syst Saf , vol.79 , pp. 301-308
    • Zhao, Y.X.1
  • 27
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • Ruiz R, García-Díaz JC, Maroto C (2007) Considering scheduling and preventive maintenance in the flowshop sequencing problem. Comput Oper Res 34:3314-3330
    • (2007) Comput Oper Res , vol.34 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 28
    • 0019637027 scopus 로고
    • Optimal preventive maintenance policies for repairable systems
    • Nguyen DG, Murthy DNP (1981) Optimal preventive maintenance policies for repairable systems. Oper Res 29:1181-1194
    • (1981) Oper Res , vol.29 , pp. 1181-1194
    • Nguyen, D.G.1    Dnp, M.2
  • 29
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semiresumable jobs on a single machine
    • Graves GH, Lee CY (1999) Scheduling maintenance and semiresumable jobs on a single machine. Nav Res Logist 46:845-863
    • (1999) Nav Res Logist , vol.46 , pp. 845-863
    • Graves, G.H.1    Lee, C.Y.2
  • 30
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • Lee CY, Chen ZL (2000) Scheduling jobs and maintenance activities on parallel machines. Nav Res Logist 47:145-165
    • (2000) Nav Res Logist , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 31
    • 0001127702 scopus 로고
    • Variance minimization in single machine sequencing problems
    • Merten AG, Muller ME (1972) Variance minimization in single machine sequencing problems. Manag Sci 18:518-528
    • (1972) Manag Sci , vol.18 , pp. 518-528
    • Merten, A.G.1    Muller, M.E.2
  • 32
    • 0001459264 scopus 로고
    • Minimizing the time-in-system variance for a finite jobset
    • Schrage L (1975) Minimizing the time-in-system variance for a finite jobset. Manag Sci 21:540-543
    • (1975) Manag Sci , vol.21 , pp. 540-543
    • Schrage, L.1
  • 33
    • 0031120716 scopus 로고    scopus 로고
    • Optimal replacement policies with minimal repair and age-dependent costs
    • Chen M, Feldman RM (1997) Optimal replacement policies with minimal repair and age-dependent costs. Eur J Oper Res 98:75-84
    • (1997) Eur J Oper Res , vol.98 , pp. 75-84
    • Chen, M.1    Feldman, R.M.2
  • 36
    • 40649119257 scopus 로고    scopus 로고
    • Entoropy model with application to maintenance policy
    • Nakagawa T, Nakamura S (2007) Entoropy model with application to maintenance policy. IEEM 2007:654-656
    • (2007) IEEM , vol.2007 , pp. 654-656
    • Nakagawa, T.1    Nakamura, S.2
  • 37
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • Cassady CR, Kutanoglu E (2003) Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Transactions 35:503-513
    • (2003) IIE Transactions , vol.35 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.