-
2
-
-
0002362385
-
Optimum preventive maintenance policies
-
Barlow R., and Hunter L.C. Optimum preventive maintenance policies. Operations Research 8 1 (1960) 90-100
-
(1960)
Operations Research
, vol.8
, Issue.1
, pp. 90-100
-
-
Barlow, R.1
Hunter, L.C.2
-
3
-
-
33947223419
-
-
Barlow, R., Proschan, F. 1996. Mathematical theory of reliability, Society for Industrial and Applied Mathematics SIAM.
-
-
-
-
4
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran G.R., and Yanasse H.H. Computational complexity of the capacitated lot size problem. Management Science 28 (1982) 1174-1186
-
(1982)
Management Science
, vol.28
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
5
-
-
0002144134
-
Deterministic production planning with concave costs and capacity constraints
-
Florian M., and Klein M. Deterministic production planning with concave costs and capacity constraints. Management Science 18 (1971) 12-20
-
(1971)
Management Science
, vol.18
, pp. 12-20
-
-
Florian, M.1
Klein, M.2
-
6
-
-
0032671338
-
Scheduling maintenance and semiresumable jobs on single machine
-
Graves G.H., and Lee C.Y. Scheduling maintenance and semiresumable jobs on single machine. Naval Research Logistics 46 (1999) 845-862
-
(1999)
Naval Research Logistics
, vol.46
, pp. 845-862
-
-
Graves, G.H.1
Lee, C.Y.2
-
7
-
-
0036466573
-
Two-machine flow shops with limited machine availability
-
Kubiak W., Blazewicz J., Formanowicz P., Breit J., and Schmidt G. Two-machine flow shops with limited machine availability. European Journal of Operational Research 136 (2002) 528-540
-
(2002)
European Journal of Operational Research
, vol.136
, pp. 528-540
-
-
Kubiak, W.1
Blazewicz, J.2
Formanowicz, P.3
Breit, J.4
Schmidt, G.5
-
8
-
-
0000541519
-
Machine scheduling with an availability constraint
-
Lee C.Y. Machine scheduling with an availability constraint. Journal of Global Optimization 9 (1996) 395-416
-
(1996)
Journal of Global Optimization
, vol.9
, pp. 395-416
-
-
Lee, C.Y.1
-
9
-
-
0000049036
-
Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint
-
Lee C.Y. Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint. Operations Research Letters 20 (1997) 129-139
-
(1997)
Operations Research Letters
, vol.20
, pp. 129-139
-
-
Lee, C.Y.1
-
11
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
Lee C.Y., and Chen Z.L. Scheduling jobs and maintenance activities on parallel machines. Naval Research Logistics 47 (2000) 145-165
-
(2000)
Naval Research Logistics
, vol.47
, pp. 145-165
-
-
Lee, C.Y.1
Chen, Z.L.2
-
13
-
-
0033198250
-
Integrated maintenance and production decisions in a hierarchical production planning environment
-
Wienstein L., and Chung C.H. Integrated maintenance and production decisions in a hierarchical production planning environment. Computer and Operations Research 26 (1999) 1059-1074
-
(1999)
Computer and Operations Research
, vol.26
, pp. 1059-1074
-
-
Wienstein, L.1
Chung, C.H.2
|