-
1
-
-
0024944070
-
Single machine flow-time scheduling with a single breakdown
-
Adiri, I., et al., 1989. Single machine flow-time scheduling with a single breakdown. Acta Informatica, 26 (7), 679-696.
-
(1989)
Acta Informatica
, vol.26
, Issue.7
, pp. 679-696
-
-
Adiri, I.1
-
2
-
-
33947276768
-
An integrated production and preventive maintenance planning model
-
Aghezzaf, E.H., Jamali, M.A., and Ait-Kadi, D., 2007. An integrated production and preventive maintenance planning model. European Journal of Operational Research, 181 (2), 676-685.
-
(2007)
European Journal of Operational Research
, vol.181
, Issue.2
, pp. 676-685
-
-
Aghezzaf, E.H.1
Jamali, M.A.2
Ait-Kadi, D.3
-
3
-
-
45849131693
-
Integrated production and preventive maintenance in production systems subject to random failures
-
Aghezzaf, E.H. and Najid, M.N., 2008. Integrated production and preventive maintenance in production systems subject to random failures. Information Sciences, 178 (17), 3382-3392.
-
(2008)
Information Sciences
, vol.178
, Issue.17
, pp. 3382-3392
-
-
Aghezzaf, E.H.1
Najid, M.N.2
-
5
-
-
0029632622
-
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
-
Allahverdi, A. and Mittenthal, J., 1995. Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. European Journal of Operational Research, 81(2), 376-387.
-
(1995)
European Journal of Operational Research
, vol.81
, Issue.2
, pp. 376-387
-
-
Allahverdi, A.1
Mittenthal, J.2
-
6
-
-
33750299162
-
The role of maintenance in improving companies productivity and profitability
-
Alsyouf, I., 2007. The role of maintenance in improving companies productivity and profitability. International Journal of Production Economics, 105 (1), 70-78.
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.1
, pp. 70-78
-
-
Alsyouf, I.1
-
7
-
-
69249221297
-
Maintenance practices in Swedish industries survey results
-
Alsyouf, I., 2009. Maintenance practices in Swedish industries survey results. International Journal of Production Economics, 121 (1), 212-223.
-
(2009)
International Journal of Production Economics
, vol.121
, Issue.1
, pp. 212-223
-
-
Alsyouf, I.1
-
8
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
Ben-Daya, M., 2002. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics, 76 (3), 257-264.
-
(2002)
International Journal of Production Economics
, vol.76
, Issue.3
, pp. 257-264
-
-
Ben-Daya, M.1
-
9
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran, G.R. and Yanasse, H.H., 1982. Computational complexity of the capacitated lot size problem. Management Science, 28 (10), 1174-1186.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
10
-
-
0038813446
-
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
-
Cassady, R.C. and Kutanoglu, E., 2003. Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production Scheduling. IIE Transactions, 35(6), 503-513.
-
(2003)
IIE Transactions
, vol.35
, Issue.6
, pp. 503-513
-
-
Cassady, R.C.1
Kutanoglu, E.2
-
11
-
-
34548812552
-
Production lot sizing with process deterioration and machine breakdown
-
Chakraborty, T., Giri, B.C., and Chaudhuri, K.S., 2008. Production lot sizing with process deterioration and machine breakdown. European Journal of Operational Research, 185 (2), 606-618.
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 606-618
-
-
Chakraborty, T.1
Giri, B.C.2
Chaudhuri, K.S.3
-
12
-
-
0001226544
-
A Lagrangean relaxation approach for very-large-scale capacitated lot-sizing
-
Diaby, M., et al., 1992. A Lagrangean relaxation approach for very-large-scale capacitated lot-sizing. Management Science, 38 (9), 1329-1340.
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1329-1340
-
-
Diaby, M.1
-
13
-
-
35348992049
-
Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy
-
El-Ferik, S., 2008. Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy. European Journal of Operational Research, 186 (1), 150-163.
-
(2008)
European Journal of Operational Research
, vol.186
, Issue.1
, pp. 150-163
-
-
El-Ferik, S.1
-
14
-
-
84857454886
-
Integrating noncyclical preventive maintenance scheduling and production planning for a single machine
-
Fitouhi, M.C. and Nourelfath, M., 2012. Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. International Journal of Production Economics, 136 (2), 344-351.
-
(2012)
International Journal of Production Economics
, vol.136
, Issue.2
, pp. 344-351
-
-
Fitouhi, M.C.1
Nourelfath, M.2
-
15
-
-
34047188084
-
Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems
-
Gharbi, A., Kenne, J.P., and Beit, M., 2007. Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems. International Journal of Production Economics, 107 (2), 422-434.
-
(2007)
International Journal of Production Economics
, vol.107
, Issue.2
, pp. 422-434
-
-
Gharbi, A.1
Kenne, J.P.2
Beit, M.3
-
16
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
Groenevenlt, H., Pintelon, L., and Seidmann, A., 1992. Production lot sizing with machine breakdowns. Management Science, 38 (1), 104-123.
-
(1992)
Management Science
, vol.38
, Issue.1
, pp. 104-123
-
-
Groenevenlt, H.1
Pintelon, L.2
Seidmann, A.3
-
17
-
-
33750728882
-
Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches
-
Jans, R. and Degraeve, Z., 2007. Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. European Journal of Operational Research, 177 (3), 1855-1875.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1855-1875
-
-
Jans, R.1
Degraeve, Z.2
-
18
-
-
0038617642
-
An effective heuristic for the CLSP with set-up times
-
Hindi, K.S., Fleszar, K., and Charalambous, C., 2003. An effective heuristic for the CLSP with set-up times. The Journal of the Operational Research Society, 54 (5), 490-498.
-
(2003)
The Journal of the Operational Research Society
, vol.54
, Issue.5
, pp. 490-498
-
-
Hindi, K.S.1
Fleszar, K.2
Charalambous, C.3
-
19
-
-
28044442238
-
Minimizing makespan on a single machine subject to random breakdowns
-
Kasap, N., Aytug, H., and Paul, A., 2006. Minimizing makespan on a single machine subject to random breakdowns. Operations Research Letters, 34 (1), 29-36.
-
(2006)
Operations Research Letters
, vol.34
, Issue.1
, pp. 29-36
-
-
Kasap, N.1
Aytug, H.2
Paul, A.3
-
20
-
-
0026897390
-
Single machine flow-time scheduling with scheduled maintenance
-
Lee, C.Y. and Liman, S.D., 1992. Single machine flow-time scheduling with scheduled maintenance. Acta Informatica, 29 (4), 375-382.
-
(1992)
Acta Informatica
, vol.29
, Issue.4
, pp. 375-382
-
-
Lee, C.Y.1
Liman, S.D.2
-
21
-
-
0037411886
-
Single-machine scheduling with periodic maintenance and nonresumable jobs
-
Liao, C.J. and Chen, W.J., 2003. Single-machine scheduling with periodic maintenance and nonresumable jobs. Computers & Operations Research, 30 (9), 1335-1347.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.9
, pp. 1335-1347
-
-
Liao, C.J.1
Chen, W.J.2
-
22
-
-
78651284941
-
Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance
-
Liao, G.L. and Sheu, S.H., 2011. Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. International Journal of Production Economics, 130 (1), 118-124.
-
(2011)
International Journal of Production Economics
, vol.130
, Issue.1
, pp. 118-124
-
-
Liao, G.L.1
Sheu, S.H.2
-
23
-
-
70349764553
-
Minimizing the makespan in a single machine scheduling problems with Fexible and periodic maintenance
-
Low, C., et al., 2010. Minimizing the makespan in a single machine scheduling problems with Fexible and periodic maintenance. Applied Mathematical Modelling, 34 (2), 334-342.
-
(2010)
Applied Mathematical Modelling
, vol.34
, Issue.2
, pp. 334-342
-
-
Low, C.1
-
24
-
-
79951579853
-
Bi-objective optimisation research on integrated Exed time interval preventive maintenance and production for scheduling Fexible job-shop problem
-
Moradi, E., Fatemi Ghomi, S.M.T., and Zandie, M., 2011. Bi-objective optimisation research on integrated Exed time interval preventive maintenance and production for scheduling Fexible job-shop problem. Expert Systems with Applications, 38 (6), 7169-7178.
-
(2011)
Expert Systems with Applications
, vol.38
, Issue.6
, pp. 7169-7178
-
-
Moradi, E.1
Fatemi Ghomi, S.M.T.2
Zandie, M.3
-
25
-
-
79551629459
-
An integrated production and maintenance planning model with time windows and shortage cost
-
Najid, N.M., Alaoui-Selsouli, M., and Mohafid, A., 2011. An integrated production and maintenance planning model with time windows and shortage cost. International Journal of Production Research, 49 (8), 2265-2283.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.8
, pp. 2265-2283
-
-
Najid, N.M.1
Alaoui-Selsouli, M.2
Mohafid, A.3
-
26
-
-
39449098494
-
Capacitated lot-sizing with extensions: A review
-
Quadt, D. and Kuhn, H., 2008. Capacitated lot-sizing with extensions: a review. 4OR: A Quarterly Journal of Operations Research, 6 (1), 61-83.
-
(2008)
4OR: A Quarterly Journal of Operations Research
, vol.6
, Issue.1
, pp. 61-83
-
-
Quadt, D.1
Kuhn, H.2
-
27
-
-
34047122539
-
Considering scheduling and preventive maintenance in the flowshop sequencing problem
-
Ruiz, R., García-Díaz, J.C., and Maroto, C., 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research, 34 (11), 3314-3330.
-
(2007)
Computers & Operations Research
, vol.34
, Issue.11
, pp. 3314-3330
-
-
Ruiz, R.1
García-Díaz, J.C.2
Maroto, C.3
-
28
-
-
0035546214
-
Optimal just-in-time buffer inventory for regular preventive maintenance
-
Salameh, M.K. and Ghattas, R.E., 2001. Optimal just-in-time buffer inventory for regular preventive maintenance. International Journal of Production Economics, 74 (1-3), 157-161.
-
(2001)
International Journal of Production Economics
, vol.74
, Issue.1-3
, pp. 157-161
-
-
Salameh, M.K.1
Ghattas, R.E.2
-
29
-
-
0031069214
-
Optimal lot sizing with regular maintenance interruptions
-
Salameh, M.K. and Jaber, M.Y., 1997. Optimal lot sizing with regular maintenance interruptions. Applied Mathematical Modelling, 21 (2), 85-90.
-
(1997)
Applied Mathematical Modelling
, vol.21
, Issue.2
, pp. 85-90
-
-
Salameh, M.K.1
Jaber, M.Y.2
-
30
-
-
0022230531
-
Lagrangean relaxation for the multi-item capacitated lot-sizing problem: A heuristic implementation
-
Thizy, J.M. and Van Wassenhove, L.N., 1985. Lagrangean relaxation for the multi-item capacitated lot-sizing problem: a heuristic implementation. IIE Transactions, 17 (4), 308-313.
-
(1985)
IIE Transactions
, vol.17
, Issue.4
, pp. 308-313
-
-
Thizy, J.M.1
Van Wassenhove, L.N.2
-
31
-
-
0000555407
-
Capacitated lot sizing with setup times
-
Trigeiro, W.W., Thomas, L.J., and McClain, J.O., 1989. Capacitated lot sizing with setup times. Management Science, 35 (3), 353-366.
-
(1989)
Management Science
, vol.35
, Issue.3
, pp. 353-366
-
-
Trigeiro, W.W.1
Thomas, L.J.2
McClain, J.O.3
-
32
-
-
0037118559
-
A survey of maintenance policies of deteriorating systems
-
Wang, H., 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3), 469-489.
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.3
, pp. 469-489
-
-
Wang, H.1
-
33
-
-
0033198250
-
Integrating maintenance and production decisions in a hierarchical production planning environment
-
Weinstein, L. and Chung, C.H., 1999. Integrating maintenance and production decisions in a hierarchical production planning environment. Computers & Operations Research, 26 (10-11), 1059-1074.
-
(1999)
Computers & Operations Research
, vol.26
, Issue.10-11
, pp. 1059-1074
-
-
Weinstein, L.1
Chung, C.H.2
-
34
-
-
1342308593
-
Optimal buffer inventory and preventive maintenance for an imperfect production process
-
Zequeira, R.I., Prida, B., and Valdes, J.E., 2004. Optimal buffer inventory and preventive maintenance for an imperfect production process. International Journal of Production Research, 42 (5), 959-974.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.5
, pp. 959-974
-
-
Zequeira, R.I.1
Prida, B.2
Valdes, J.E.3
-
35
-
-
37449014885
-
Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability
-
Zequeira, R.I., Valdes, J.E., and Berenguer, C., 2008. Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability. International Journal of Production Economics, 111 (2), 686-696.
-
(2008)
International Journal of Production Economics
, vol.111
, Issue.2
, pp. 686-696
-
-
Zequeira, R.I.1
Valdes, J.E.2
Berenguer, C.3
|