Volumn 51, Issue 5, 2013, Pages 1379-1391

Integrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint

Author keywords

Capacitated lot sizing problem; Reliability; Run based PM

Indexed keywords

CAPACITATED LOT SIZING PROBLEM; COMPUTATIONAL RESULTS; FEASIBLE SOLUTION; INTEGRATED MODELS; JOINT MODELS; LINEARISATION; MIXED INTEGER LINEAR PROGRAMMING; NUMERICAL EXPERIMENTS; OVERALL COSTS; PLANNING HORIZONS; PRODUCTION SYSTEM; RELIABILITY CONSTRAINTS; SYSTEM RELIABILITY;

EID: 84871245516     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.693637     Document Type: Article
Times cited : (35)

References (35)
  • 1
    • 0024944070 scopus 로고
    • Single machine flow-time scheduling with a single breakdown
    • Adiri, I., et al., 1989. Single machine flow-time scheduling with a single breakdown. Acta Informatica, 26 (7), 679-696.
    • (1989) Acta Informatica , vol.26 , Issue.7 , pp. 679-696
    • Adiri, I.1
  • 3
    • 45849131693 scopus 로고    scopus 로고
    • Integrated production and preventive maintenance in production systems subject to random failures
    • Aghezzaf, E.H. and Najid, M.N., 2008. Integrated production and preventive maintenance in production systems subject to random failures. Information Sciences, 178 (17), 3382-3392.
    • (2008) Information Sciences , vol.178 , Issue.17 , pp. 3382-3392
    • Aghezzaf, E.H.1    Najid, M.N.2
  • 5
    • 0029632622 scopus 로고
    • Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
    • Allahverdi, A. and Mittenthal, J., 1995. Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. European Journal of Operational Research, 81(2), 376-387.
    • (1995) European Journal of Operational Research , vol.81 , Issue.2 , pp. 376-387
    • Allahverdi, A.1    Mittenthal, J.2
  • 6
    • 33750299162 scopus 로고    scopus 로고
    • The role of maintenance in improving companies productivity and profitability
    • Alsyouf, I., 2007. The role of maintenance in improving companies productivity and profitability. International Journal of Production Economics, 105 (1), 70-78.
    • (2007) International Journal of Production Economics , vol.105 , Issue.1 , pp. 70-78
    • Alsyouf, I.1
  • 7
    • 69249221297 scopus 로고    scopus 로고
    • Maintenance practices in Swedish industries survey results
    • Alsyouf, I., 2009. Maintenance practices in Swedish industries survey results. International Journal of Production Economics, 121 (1), 212-223.
    • (2009) International Journal of Production Economics , vol.121 , Issue.1 , pp. 212-223
    • Alsyouf, I.1
  • 8
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • Ben-Daya, M., 2002. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics, 76 (3), 257-264.
    • (2002) International Journal of Production Economics , vol.76 , Issue.3 , pp. 257-264
    • Ben-Daya, M.1
  • 9
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran, G.R. and Yanasse, H.H., 1982. Computational complexity of the capacitated lot size problem. Management Science, 28 (10), 1174-1186.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 10
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • Cassady, R.C. and Kutanoglu, E., 2003. Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production Scheduling. IIE Transactions, 35(6), 503-513.
    • (2003) IIE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, R.C.1    Kutanoglu, E.2
  • 12
    • 0001226544 scopus 로고
    • A Lagrangean relaxation approach for very-large-scale capacitated lot-sizing
    • Diaby, M., et al., 1992. A Lagrangean relaxation approach for very-large-scale capacitated lot-sizing. Management Science, 38 (9), 1329-1340.
    • (1992) Management Science , vol.38 , Issue.9 , pp. 1329-1340
    • Diaby, M.1
  • 13
    • 35348992049 scopus 로고    scopus 로고
    • Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy
    • El-Ferik, S., 2008. Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy. European Journal of Operational Research, 186 (1), 150-163.
    • (2008) European Journal of Operational Research , vol.186 , Issue.1 , pp. 150-163
    • El-Ferik, S.1
  • 14
    • 84857454886 scopus 로고    scopus 로고
    • Integrating noncyclical preventive maintenance scheduling and production planning for a single machine
    • Fitouhi, M.C. and Nourelfath, M., 2012. Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. International Journal of Production Economics, 136 (2), 344-351.
    • (2012) International Journal of Production Economics , vol.136 , Issue.2 , pp. 344-351
    • Fitouhi, M.C.1    Nourelfath, M.2
  • 15
    • 34047188084 scopus 로고    scopus 로고
    • Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems
    • Gharbi, A., Kenne, J.P., and Beit, M., 2007. Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems. International Journal of Production Economics, 107 (2), 422-434.
    • (2007) International Journal of Production Economics , vol.107 , Issue.2 , pp. 422-434
    • Gharbi, A.1    Kenne, J.P.2    Beit, M.3
  • 16
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • Groenevenlt, H., Pintelon, L., and Seidmann, A., 1992. Production lot sizing with machine breakdowns. Management Science, 38 (1), 104-123.
    • (1992) Management Science , vol.38 , Issue.1 , pp. 104-123
    • Groenevenlt, H.1    Pintelon, L.2    Seidmann, A.3
  • 17
    • 33750728882 scopus 로고    scopus 로고
    • Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches
    • Jans, R. and Degraeve, Z., 2007. Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. European Journal of Operational Research, 177 (3), 1855-1875.
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1855-1875
    • Jans, R.1    Degraeve, Z.2
  • 19
    • 28044442238 scopus 로고    scopus 로고
    • Minimizing makespan on a single machine subject to random breakdowns
    • Kasap, N., Aytug, H., and Paul, A., 2006. Minimizing makespan on a single machine subject to random breakdowns. Operations Research Letters, 34 (1), 29-36.
    • (2006) Operations Research Letters , vol.34 , Issue.1 , pp. 29-36
    • Kasap, N.1    Aytug, H.2    Paul, A.3
  • 20
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • Lee, C.Y. and Liman, S.D., 1992. Single machine flow-time scheduling with scheduled maintenance. Acta Informatica, 29 (4), 375-382.
    • (1992) Acta Informatica , vol.29 , Issue.4 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2
  • 21
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • Liao, C.J. and Chen, W.J., 2003. Single-machine scheduling with periodic maintenance and nonresumable jobs. Computers & Operations Research, 30 (9), 1335-1347.
    • (2003) Computers & Operations Research , vol.30 , Issue.9 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 22
    • 78651284941 scopus 로고    scopus 로고
    • Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance
    • Liao, G.L. and Sheu, S.H., 2011. Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. International Journal of Production Economics, 130 (1), 118-124.
    • (2011) International Journal of Production Economics , vol.130 , Issue.1 , pp. 118-124
    • Liao, G.L.1    Sheu, S.H.2
  • 23
    • 70349764553 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problems with Fexible and periodic maintenance
    • Low, C., et al., 2010. Minimizing the makespan in a single machine scheduling problems with Fexible and periodic maintenance. Applied Mathematical Modelling, 34 (2), 334-342.
    • (2010) Applied Mathematical Modelling , vol.34 , Issue.2 , pp. 334-342
    • Low, C.1
  • 24
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimisation research on integrated Exed time interval preventive maintenance and production for scheduling Fexible job-shop problem
    • Moradi, E., Fatemi Ghomi, S.M.T., and Zandie, M., 2011. Bi-objective optimisation research on integrated Exed time interval preventive maintenance and production for scheduling Fexible job-shop problem. Expert Systems with Applications, 38 (6), 7169-7178.
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandie, M.3
  • 25
    • 79551629459 scopus 로고    scopus 로고
    • An integrated production and maintenance planning model with time windows and shortage cost
    • Najid, N.M., Alaoui-Selsouli, M., and Mohafid, A., 2011. An integrated production and maintenance planning model with time windows and shortage cost. International Journal of Production Research, 49 (8), 2265-2283.
    • (2011) International Journal of Production Research , vol.49 , Issue.8 , pp. 2265-2283
    • Najid, N.M.1    Alaoui-Selsouli, M.2    Mohafid, A.3
  • 27
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • Ruiz, R., García-Díaz, J.C., and Maroto, C., 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research, 34 (11), 3314-3330.
    • (2007) Computers & Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 28
    • 0035546214 scopus 로고    scopus 로고
    • Optimal just-in-time buffer inventory for regular preventive maintenance
    • Salameh, M.K. and Ghattas, R.E., 2001. Optimal just-in-time buffer inventory for regular preventive maintenance. International Journal of Production Economics, 74 (1-3), 157-161.
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 157-161
    • Salameh, M.K.1    Ghattas, R.E.2
  • 29
    • 0031069214 scopus 로고    scopus 로고
    • Optimal lot sizing with regular maintenance interruptions
    • Salameh, M.K. and Jaber, M.Y., 1997. Optimal lot sizing with regular maintenance interruptions. Applied Mathematical Modelling, 21 (2), 85-90.
    • (1997) Applied Mathematical Modelling , vol.21 , Issue.2 , pp. 85-90
    • Salameh, M.K.1    Jaber, M.Y.2
  • 30
    • 0022230531 scopus 로고
    • Lagrangean relaxation for the multi-item capacitated lot-sizing problem: A heuristic implementation
    • Thizy, J.M. and Van Wassenhove, L.N., 1985. Lagrangean relaxation for the multi-item capacitated lot-sizing problem: a heuristic implementation. IIE Transactions, 17 (4), 308-313.
    • (1985) IIE Transactions , vol.17 , Issue.4 , pp. 308-313
    • Thizy, J.M.1    Van Wassenhove, L.N.2
  • 32
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • Wang, H., 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3), 469-489.
    • (2002) European Journal of Operational Research , vol.139 , Issue.3 , pp. 469-489
    • Wang, H.1
  • 33
    • 0033198250 scopus 로고    scopus 로고
    • Integrating maintenance and production decisions in a hierarchical production planning environment
    • Weinstein, L. and Chung, C.H., 1999. Integrating maintenance and production decisions in a hierarchical production planning environment. Computers & Operations Research, 26 (10-11), 1059-1074.
    • (1999) Computers & Operations Research , vol.26 , Issue.10-11 , pp. 1059-1074
    • Weinstein, L.1    Chung, C.H.2
  • 34
    • 1342308593 scopus 로고    scopus 로고
    • Optimal buffer inventory and preventive maintenance for an imperfect production process
    • Zequeira, R.I., Prida, B., and Valdes, J.E., 2004. Optimal buffer inventory and preventive maintenance for an imperfect production process. International Journal of Production Research, 42 (5), 959-974.
    • (2004) International Journal of Production Research , vol.42 , Issue.5 , pp. 959-974
    • Zequeira, R.I.1    Prida, B.2    Valdes, J.E.3
  • 35
    • 37449014885 scopus 로고    scopus 로고
    • Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability
    • Zequeira, R.I., Valdes, J.E., and Berenguer, C., 2008. Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability. International Journal of Production Economics, 111 (2), 686-696.
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 686-696
    • Zequeira, R.I.1    Valdes, J.E.2    Berenguer, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.