메뉴 건너뛰기




Volumn 65, Issue 10, 2014, Pages 1475-1489

A hybrid and integrated approach to evaluate and prevent disasters

Author keywords

analytic hierarchy process; Bhopal gas disaster; crisis tree analysis; mathematical programming; risk management

Indexed keywords

ANALYTIC HIERARCHY PROCESS; DISASTERS; FORESTRY; MATHEMATICAL PROGRAMMING; RISK ASSESSMENT; RISK MANAGEMENT; TREES (MATHEMATICS);

EID: 84906851718     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2013.59     Document Type: Article
Times cited : (41)

References (88)
  • 1
    • 78649319951 scopus 로고    scopus 로고
    • Design of safetycritical systems using the complementarities of success and failure domains with a case study
    • Ahmed R, Koo J, Jeong Y and Heo G (2011). Design of safetycritical systems using the complementarities of success and failure domains with a case study. Reliability Engineering and System Safety 96(1): 201-209.
    • (2011) Reliability Engineering and System Safety , vol.96 , Issue.1 , pp. 201-209
    • Ahmed, R.1    Koo, J.2    Jeong, Y.3    Heo, G.4
  • 2
    • 40249088521 scopus 로고    scopus 로고
    • ERP system selection using a simulation-based AHP approach: A case of Korean homeshopping company
    • DOI 10.1057/palgrave.jors.2602365, PII 2602365
    • Ahn B and Choi S (2007). ERP system selection using a simulationbased AHP approach: A case of Korean homeshopping company. Journal of the Operational Research Society 59(3): 322-330. (Pubitemid 351334695)
    • (2008) Journal of the Operational Research Society , vol.59 , Issue.3 , pp. 322-330
    • Ahn, B.S.1    Choi, S.H.2
  • 4
    • 18644364822 scopus 로고    scopus 로고
    • A screening methodology for the identification and ranking of infrastructure vulnerabilities due to terrorism
    • Apostolakis G and Lemon D (2005). A screening methodology for the identification and ranking of infrastructure vulnerabilities due to terrorism. Risk Analysis 25(2): 361-376. (Pubitemid 40664364)
    • (2005) Risk Analysis , vol.25 , Issue.2 , pp. 361-376
    • Apostolakis, G.E.1    Lemon, D.M.2
  • 6
    • 33845540886 scopus 로고    scopus 로고
    • Application of stochastic analytic hierarchy process within a domestic appliance manufacturer
    • Banuelas R and Antony J (2006). Application of stochastic analytic hierarchy process within a domestic appliance manufacturer. Journal of the Operational Research Society 58(1): 29-38.
    • (2006) Journal of the Operational Research Society , vol.58 , Issue.1 , pp. 29-38
    • Banuelas, R.1    Antony, J.2
  • 7
    • 33645230448 scopus 로고    scopus 로고
    • A combined goal programming-AHP approach to maintenance selection problem
    • Bertolini M and Bevilacqua M (2006). A combined goal programming-AHP approach to maintenance selection problem. Reliability Engineering and System Safety 91(7): 839-848.
    • (2006) Reliability Engineering and System Safety , vol.91 , Issue.7 , pp. 839-848
    • Bertolini, M.1    Bevilacqua, M.2
  • 9
    • 0033874764 scopus 로고    scopus 로고
    • Using AHP in determining the prior distributions on gas pipeline failures in a robust Bayesian approach
    • DOI 10.1016/S0951-8320(99)00070-8
    • Cagno E, Caron F, Mancini M and Ruggeri F (2000). Using AHP in determining the prior distributions on gas pipeline failures in a robust Bayesian approach. Reliability Engineering and System Safety 67(3): 275-284. (Pubitemid 30555827)
    • (2000) Reliability Engineering and System Safety , vol.67 , Issue.3 , pp. 275-284
    • Cagno, E.1    Caron, F.2    Mancini, M.3    Ruggeri, F.4
  • 10
    • 33646106578 scopus 로고    scopus 로고
    • An evaluation system of the setting up of predictive maintenance programmes
    • Carnero C (2006). An evaluation system of the setting up of predictive maintenance programmes. Reliability Engineering and System Safety 91(8): 945-963.
    • (2006) Reliability Engineering and System Safety , vol.91 , Issue.8 , pp. 945-963
    • Carnero, C.1
  • 12
    • 0038337008 scopus 로고    scopus 로고
    • Using vector projection method to evaluate maintainability of mechanical system in design review
    • Chen L and Cai J (2003). Using vector projection method to evaluate maintainability of mechanical system in design review. Reliability Engineering and System Safety 81(2): 147-154.
    • (2003) Reliability Engineering and System Safety , vol.81 , Issue.2 , pp. 147-154
    • Chen, L.1    Cai, J.2
  • 13
    • 25444443447 scopus 로고    scopus 로고
    • The unfolding of Bhopal disaster
    • DOI 10.1016/j.jlp.2005.07.025, PII S0950423005001312, Selected Papers Presented at the International Conference on Bhopal Gas Tragedy and its Effects on Process Safety
    • Chouhan T (2005). The unfolding of Bhopal disaster. Journal of Loss Prevention in the Process Industries 18(4-6): 205-208. (Pubitemid 41360433)
    • (2005) Journal of Loss Prevention in the Process Industries , vol.18 , Issue.4-6 , pp. 205-208
    • Chouhan, T.R.1
  • 16
    • 77950922825 scopus 로고    scopus 로고
    • Selecting numerical scales for pairwise comparisons
    • Elliott M (2010). Selecting numerical scales for pairwise comparisons. Reliability Engineering and System Safety 95(7): 750-763.
    • (2010) Reliability Engineering and System Safety , vol.95 , Issue.7 , pp. 750-763
    • Elliott, M.1
  • 19
    • 78650543064 scopus 로고    scopus 로고
    • Fault and event tree analyses for process systems risk analysis: Uncertainty handling formulations
    • Ferdous R, Khan F, Sadiq R, Amyotte P and Veitch B (2011). Fault and event tree analyses for process systems risk analysis: Uncertainty handling formulations. Risk Analysis 31(1): 86-107.
    • (2011) Risk Analysis , vol.31 , Issue.1 , pp. 86-107
    • Ferdous, R.1    Khan, F.2    Sadiq, R.3    Amyotte, P.4    Veitch, B.5
  • 21
    • 84867097890 scopus 로고    scopus 로고
    • Analyzing system safety and risks under uncertainty using a bow-tie diagram: An innovative approach
    • Ferdous R, Khan F, Sadiq R, Amyotte P and Veitch B (2013). Analyzing system safety and risks under uncertainty using a bow-tie diagram: An innovative approach. Process Safety and Environmental Protection 91(1-2): 1-18.
    • (2013) Process Safety and Environmental Protection , vol.91 , Issue.1-2 , pp. 1-18
    • Ferdous, R.1    Khan, F.2    Sadiq, R.3    Amyotte, P.4    Veitch, B.5
  • 22
    • 0036724246 scopus 로고    scopus 로고
    • Evaluating public school district performance via DEA gain functions
    • DOI 10.1057/palgrave.jors.2601417
    • Fukuyama H and Weber W (2002). Evaluating public school district performance via DEA gain functions. Journal of the Operational Research Society 53(9): 992-1003. (Pubitemid 34964225)
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.9 , pp. 992-1003
    • Fukuyama, H.1    Weber, W.L.2
  • 23
    • 84865304220 scopus 로고    scopus 로고
    • What-me worry? Why so serious?: A personal view on the Fukushima nuclear reactor accidents
    • Gallucci R (2012). 'What-me worry? Why so serious?': A personal view on the Fukushima nuclear reactor accidents. Risk Analysis 32(9): 1444-1450.
    • (2012) Risk Analysis , vol.32 , Issue.9 , pp. 1444-1450
    • Gallucci, R.1
  • 24
    • 0032156562 scopus 로고    scopus 로고
    • A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming
    • PII S0925527397000091
    • Ghodsypour S and O'Brien C (1998). A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming. International Journal of Production Economics 56-57: 199-212. (Pubitemid 128400944)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 199-212
    • Ghodsypour, S.H.1    O'Brien, C.2
  • 25
    • 0035995252 scopus 로고    scopus 로고
    • The Bhopal gas tragedy: Could it have happened in a developed country?
    • DOI 10.1016/S0950-4230(01)00025-0, PII S0950423001000250
    • Gupta J (2002). The Bhopal gas tragedy: Could it have happened in a developed country? Journal of Loss Prevention in the Process Industries 15(1): 1-4. (Pubitemid 34060675)
    • (2002) Journal of Loss Prevention in the Process Industries , vol.15 , Issue.1 , pp. 1-4
    • Gupta, J.P.1
  • 26
    • 0242691805 scopus 로고    scopus 로고
    • A method for risk-informed safety significance categorization using the analytic hierarchy process and Bayesian belief networks
    • Ha J and Seong P (2004). A method for risk-informed safety significance categorization using the analytic hierarchy process and Bayesian belief networks. Reliability Engineering and System Safety 83(1): 1-15.
    • (2004) Reliability Engineering and System Safety , vol.83 , Issue.1 , pp. 1-15
    • Ha, J.1    Seong, P.2
  • 27
    • 65549106432 scopus 로고    scopus 로고
    • A human-machine interface evaluation method: A difficulty evaluation method in information searching (DEMIS)
    • Ha J and Seong P (2009). A human-machine interface evaluation method: A difficulty evaluation method in information searching (DEMIS). Reliability Engineering and System Safety 94(10): 1557-1567.
    • (2009) Reliability Engineering and System Safety , vol.94 , Issue.10 , pp. 1557-1567
    • Ha, J.1    Seong, P.2
  • 28
    • 58349110913 scopus 로고    scopus 로고
    • Multi-criteria logistics distribution network design using SAS/OR
    • Ho W and Emrouznejad A (2009). Multi-criteria logistics distribution network design using SAS/OR. Expert Systems with Applications 36(3, Part 2): 7288-7298.
    • (2009) Expert Systems with Applications , vol.36 , Issue.3 PART 2 , pp. 7288-7298
    • Ho, W.1    Emrouznejad, A.2
  • 29
    • 84898464120 scopus 로고    scopus 로고
    • Multiple criteria optimization of contemporary logistics distribution network problems
    • Ho W, Lee C and Ho G (2010). Multiple criteria optimization of contemporary logistics distribution network problems. OR Insight 23(1): 27-43.
    • (2010) OR Insight , vol.23 , Issue.1 , pp. 27-43
    • Ho, W.1    Lee, C.2    Ho, G.3
  • 30
    • 78650617430 scopus 로고    scopus 로고
    • Analytic hierarchy process and expert choice: Benefits and limitations
    • Ishizaka A and Labib A (2009). Analytic hierarchy process and expert choice: Benefits and limitations. OR Insight 22(4): 201-220.
    • (2009) OR Insight , vol.22 , Issue.4 , pp. 201-220
    • Ishizaka, A.1    Labib, A.2
  • 32
    • 0026652738 scopus 로고
    • A causal analysis of large vehicle accidents through fault-tree analysis
    • Joshua S and Garber N (1992). A causal analysis of large vehicle accidents through fault-tree analysis. Risk Analysis 12(2): 173-188.
    • (1992) Risk Analysis , vol.12 , Issue.2 , pp. 173-188
    • Joshua, S.1    Garber, N.2
  • 33
    • 24644521050 scopus 로고    scopus 로고
    • A method for the efficient prioritization of infrastructure renewal projects
    • DOI 10.1016/j.ress.2004.11.016, PII S0951832004002935
    • Karydas D and Gifun J (2006). A method for the efficient prioritization of infrastructure renewal projects. Reliability Engineering and System Safety 91(1): 84-99. (Pubitemid 41277082)
    • (2006) Reliability Engineering and System Safety , vol.91 , Issue.1 , pp. 84-99
    • Karydas, D.M.1    Gifun, J.F.2
  • 34
    • 79955735775 scopus 로고    scopus 로고
    • Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches
    • Khakzad N, Khan F and Amyotte P (2011). Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches. Reliability Engineering and System Safety 96(8): 925-932.
    • (2011) Reliability Engineering and System Safety , vol.96 , Issue.8 , pp. 925-932
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 36
    • 84871439873 scopus 로고    scopus 로고
    • Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network
    • Khakzad N, Khan F and Amyotte P (2013a). Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network. Process Safety and Environmental Protection 91(1-2): 46-53.
    • (2013) Process Safety and Environmental Protection , vol.91 , Issue.1-2 , pp. 46-53
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 37
    • 84866302150 scopus 로고    scopus 로고
    • Risk-based design of process systems using discrete-time Bayesian networks
    • Khakzad N, Khan F and Amyotte P (2013b). Risk-based design of process systems using discrete-time Bayesian networks. Reliability Engineering & System Safety 109(0): 5-17.
    • (2013) Reliability Engineering & System Safety , vol.109 , Issue.0 , pp. 5-17
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 38
    • 84906870857 scopus 로고    scopus 로고
    • Gulf Professional Publishing: Oxford
    • Kletz T (2001). Learing from Accidents. Gulf Professional Publishing: Oxford.
    • (2001) Learing from Accidents
    • Kletz, T.1
  • 39
    • 55549097154 scopus 로고    scopus 로고
    • Integrated analytical hierarch process and mathematical programming to supplier selection problem with quantity discount
    • Kokangul A and Susuz Z (2009). Integrated analytical hierarch process and mathematical programming to supplier selection problem with quantity discount. Applied Mathematical Modelling 33(3): 1417-1429.
    • (2009) Applied Mathematical Modelling , vol.33 , Issue.3 , pp. 1417-1429
    • Kokangul, A.1    Susuz, Z.2
  • 40
    • 0033284314 scopus 로고    scopus 로고
    • Information resource planning for a health-care system using an AHP-based goal programming method
    • Lee C and Kwak N (1999). Information resource planning for a health-care system using an AHP-based goal programming method. Journal of the Operational Research Society 50(12): 1191-1198. (Pubitemid 32082824)
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.12 , pp. 1191-1198
    • Lee, C.W.1    Kwak, N.K.2
  • 42
    • 33745791567 scopus 로고    scopus 로고
    • Implementing the balanced scorecard using the analytic hierarchy process & the analytic network process
    • Leung L, Lam K and Cao D (2005). Implementing the balanced scorecard using the analytic hierarchy process & the analytic network process. Journal of the Operation Research Society 57(6): 682-691.
    • (2005) Journal of the Operation Research Society , vol.57 , Issue.6 , pp. 682-691
    • Leung, L.1    Lam, K.2    Cao, D.3
  • 44
    • 60749134786 scopus 로고    scopus 로고
    • An integrated queuing and multi-objective bed allocation model with application to a hospital in China
    • Li X, Beullens P, Jones D and Tamiz M (2008). An integrated queuing and multi-objective bed allocation model with application to a hospital in China. Journal of the Operation Research Society 60(3): 330-338.
    • (2008) Journal of the Operation Research Society , vol.60 , Issue.3 , pp. 330-338
    • Li, X.1    Beullens, P.2    Jones, D.3    Tamiz, M.4
  • 45
    • 0025196513 scopus 로고
    • Effects of the chernobyl accident on public perceptions of nuclear plant accident risks
    • Lindell M and Perry R (1990). Effects of the Chernobyl accident on public perceptions of nuclear plant accident risks. Risk Analysis 10(3): 393-399. (Pubitemid 20317406)
    • (1990) Risk Analysis , vol.10 , Issue.3 , pp. 393-399
    • Lindell, M.K.1    Perry, R.W.2
  • 46
    • 33645103576 scopus 로고    scopus 로고
    • Multicriteria decision analysis: A comprehensive decision approach for management of contaminated sediments
    • Linkov I et al (2006). Multicriteria decision analysis: A comprehensive decision approach for management of contaminated sediments. Risk Analysis 26(1): 61-78.
    • (2006) Risk Analysis , vol.26 , Issue.1 , pp. 61-78
    • Linkov, I.1
  • 47
    • 78649799232 scopus 로고    scopus 로고
    • A quality risk management model approach for cell therapy manufacturing
    • Lopez F et al (2010). A quality risk management model approach for cell therapy manufacturing. Risk Analysis 30(12): 1857-1871.
    • (2010) Risk Analysis , vol.30 , Issue.12 , pp. 1857-1871
    • Lopez, F.1
  • 48
    • 48349095573 scopus 로고    scopus 로고
    • Expert judgment-based risk assessment using statistical scenario analysis: A case study-running the bulls in Pamplona (Spain)
    • Mallor F, García-Olaverri C, Gómez-Elvira S and Mateo-Collazas P (2008). Expert judgment-based risk assessment using statistical scenario analysis: A case study-Running the bulls in Pamplona (Spain). Risk Analysis 28(4): 1003-1019.
    • (2008) Risk Analysis , vol.28 , Issue.4 , pp. 1003-1019
    • Mallor, F.1    García-Olaverri, C.2    Gómez-Elvira, S.3    Mateo-Collazas, P.4
  • 49
    • 33947221943 scopus 로고    scopus 로고
    • Human reliability analysis by fuzzy "CREAM"
    • DOI 10.1111/j.1539-6924.2006.00865.x
    • Marseguerra M, Zio E and Librizzi M (2007). Human reliability analysis by fuzzy 'CREAM'. Risk Analysis 27(1): 137-154. (Pubitemid 46415542)
    • (2007) Risk Analysis , vol.27 , Issue.1 , pp. 137-154
    • Marseguerra, M.1    Zio, E.2    Librizzi, M.3
  • 50
    • 77950802750 scopus 로고    scopus 로고
    • Human error contribution in collision and grounding of oil tankers
    • Martins M and Maturana M (2010). Human error contribution in collision and grounding of oil tankers. Risk Analysis 30(4): 674-698.
    • (2010) Risk Analysis , vol.30 , Issue.4 , pp. 674-698
    • Martins, M.1    Maturana, M.2
  • 51
    • 0010002777 scopus 로고    scopus 로고
    • The Effectiveness of Alternative Preference Elicitation Methods in the Analytic Hierarchy Process
    • DOI 10.1002/(SICI)1099-1360(199701) 6:1<41::AID-MCDA122>3.0.CO;2-D
    • Millet I (1997). The effectiveness of alternative preference elicitation methods in the analytic hierarchy process. Journal of Multi-Criteria Decision Analysis 6(1): 41-51. (Pubitemid 127017245)
    • (1997) Journal of multi-criteria decision analysis , vol.6 , Issue.1 , pp. 41-51
    • Millet, I.1
  • 52
    • 58449090889 scopus 로고    scopus 로고
    • Using SSM to structure the identification of inputs and outputs in DEA
    • Mingers J, Liu W and Meng W (2007). Using SSM to structure the identification of inputs and outputs in DEA. Journal of the Operational Research Society 60(2): 168-179.
    • (2007) Journal of the Operational Research Society , vol.60 , Issue.2 , pp. 168-179
    • Mingers, J.1    Liu, W.2    Meng, W.3
  • 53
    • 35348980157 scopus 로고    scopus 로고
    • A two-phase possibilistic linear programming methodology for multi-objective supplier evaluation and order allocation problems
    • DOI 10.1016/j.ins.2007.08.002, PII S0020025507003799
    • Özgen D, Önüt S, Gülsün B, Tuzkaya R and Tuzkaya G (2008). A two-phase possibilistic linear programming methodology for multi-objective supplier evaluation and order allocation problems. Information Sciences 178(2): 485-500. (Pubitemid 47600206)
    • (2008) Information Sciences , vol.178 , Issue.2 , pp. 485-500
    • Ozgen, D.1    Onut, S.2    Gulsun, B.3    Tuzkaya, U.R.4    Tuzkaya, G.5
  • 54
    • 0001938206 scopus 로고    scopus 로고
    • The managemnet did not adhere to safety norms
    • Pareek K (1999). The managemnet did not adhere to safety norms. Interview. Down to Earth, 56.
    • (1999) Interview. Down to Earth , pp. 56
    • Pareek, K.1
  • 55
    • 37049021503 scopus 로고    scopus 로고
    • A new method for estimating human error probabilities: AHP-SLIM
    • DOI 10.1016/j.ress.2007.02.003, PII S0951832007000567
    • Park K and Lee J (2008). A new method for estimating human error probabilities: AHP-SLIM. Reliability Engineering and System Safety 93(4): 578-587. (Pubitemid 350245444)
    • (2008) Reliability Engineering and System Safety , vol.93 , Issue.4 , pp. 578-587
    • Park, K.S.1    Lee, J.I.2
  • 57
    • 0035545607 scopus 로고    scopus 로고
    • Probabilistic risk analysis for the NASA space shuttle: A brief history and current work
    • DOI 10.1016/S0951-8320(01)00081-3, PII S0951832001000813
    • Paté-Cornell E and Dillon R (2001). Probabilistic risk analysis for the NASA space shuttle: A brief history and current work. Reliability Engineering and System Safety 74(3): 345-352. (Pubitemid 33018675)
    • (2001) Reliability Engineering and System Safety , vol.74 , Issue.3 , pp. 345-352
    • Pate-Cornell, E.1    Dillon, R.2
  • 58
    • 0032143966 scopus 로고    scopus 로고
    • A methodology to select a wire insulation for use in habitable spacecraft
    • Paulos T and Apostolakis G (1998). A methodology to select a wire insulation for use in habitable spacecraft. Risk Analysis 18(4): 471-484.
    • (1998) Risk Analysis , vol.18 , Issue.4 , pp. 471-484
    • Paulos, T.1    Apostolakis, G.2
  • 59
    • 79956208978 scopus 로고    scopus 로고
    • SHIPP methodology: Predictive accident modeling approach. Part I: Methodology and model description
    • Rathnayaka S, Khan F and Amyotte P (2011a). SHIPP methodology: Predictive accident modeling approach. Part I: Methodology and model description. Process Safety and Environmental Protection 89(3): 151-164.
    • (2011) Process Safety and Environmental Protection , vol.89 , Issue.3 , pp. 151-164
    • Rathnayaka, S.1    Khan, F.2    Amyotte, P.3
  • 60
    • 79952574348 scopus 로고    scopus 로고
    • SHIPP methodology: Predictive accident modeling approach. Part II. Validation with case study
    • Rathnayaka S, Khan F and Amyotte P (2011b). SHIPP methodology: Predictive accident modeling approach. Part II. Validation with case study. Process Safety and Environmental Protection 89(2): 75-88.
    • (2011) Process Safety and Environmental Protection , vol.89 , Issue.2 , pp. 75-88
    • Rathnayaka, S.1    Khan, F.2    Amyotte, P.3
  • 62
    • 49449122896 scopus 로고
    • A scaling method for priorities in hierarchical structures
    • Saaty T (1977). A scaling method for priorities in hierarchical structures. Journal of Mathematical Psychology 15(3): 234-281.
    • (1977) Journal of Mathematical Psychology , vol.15 , Issue.3 , pp. 234-281
    • Saaty, T.1
  • 64
    • 0023360086 scopus 로고
    • Risk - Its priority and probability: The analytic hierarchy process
    • Saaty T (1987). Risk-Its priority and probability: The analytic hierarchy process. Risk Analysis 7(2): 159-172. (Pubitemid 17117127)
    • (1987) Risk Analysis , vol.7 , Issue.2 , pp. 159-172
    • Saaty, T.L.1
  • 65
    • 0037868886 scopus 로고    scopus 로고
    • The allocation of intangible resources: The analytic hierarchy process and linear programming
    • DOI 10.1016/S0038-0121(02)00039-3
    • Saaty T, Vargas L and Dellmann K (2003). The allocation of intangible resources: The analytic hierarchy process and linear programming. Socio-Economic Planning Sciences 37(3): 169-184. (Pubitemid 36685006)
    • (2003) Socio-Economic Planning Sciences , vol.37 , Issue.3 , pp. 169-184
    • Saaty, T.L.1    Vargas, L.G.2    Dellmann, K.3
  • 66
    • 34548124548 scopus 로고    scopus 로고
    • The analytic hierarchy process and human resource allocation: Half the story
    • DOI 10.1016/j.mcm.2007.03.010, PII S0895717707000842
    • Saaty T, Peniwati K and Shang J (2007). The analytic hierarchy process and human resource allocation: Half the story. Mathematical and Computer Modelling 46(7-8): 1041-1053. (Pubitemid 47302237)
    • (2007) Mathematical and Computer Modelling , vol.46 , Issue.7-8 , pp. 1041-1053
    • Saaty, T.L.1    Peniwati, K.2    Shang, J.S.3
  • 68
    • 30744456799 scopus 로고    scopus 로고
    • Supply chain network design: Partner selection and production// distribution planning using a systematic model
    • Sha D and Che Z (2005). Supply chain network design: Partner selection and production//distribution planning using a systematic model. Journal of the Operational Research Society 57(1): 52-62.
    • (2005) Journal of the Operational Research Society , vol.57 , Issue.1 , pp. 52-62
    • Sha, D.1    Che, Z.2
  • 70
    • 84855878176 scopus 로고    scopus 로고
    • Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study
    • Skogdalen J and Vinnem J (2012). Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study. Reliability Engineering and System Safety 100(0): 58-66.
    • (2012) Reliability Engineering and System Safety , vol.100 , Issue.0 , pp. 58-66
    • Skogdalen, J.1    Vinnem, J.2
  • 71
    • 0036566139 scopus 로고    scopus 로고
    • Safety culture: A survey of the state-of-The-art
    • DOI 10.1016/S0951-8320(02)00005-4, PII S0951832002000054
    • Sorensen J (2002). Safety culture: A survey of the state-of-the-art. Reliability Engineering and System Safety 76(2): 189-204. (Pubitemid 34524753)
    • (2002) Reliability Engineering and System Safety , vol.76 , Issue.2 , pp. 189-204
    • Sorensen, J.N.1
  • 72
    • 58149179018 scopus 로고    scopus 로고
    • Uses and misuses of multicriteria decision analysis (MCDA) in environmental decision making
    • Steele K, Carmel Y, Cross J and Wilcox C (2009). Uses and misuses of Multicriteria Decision Analysis (MCDA) in environmental decision making. Risk Analysis 29(1): 26-33.
    • (2009) Risk Analysis , vol.29 , Issue.1 , pp. 26-33
    • Steele, K.1    Carmel, Y.2    Cross, J.3    Wilcox, C.4
  • 73
    • 84883441420 scopus 로고
    • [online], accessed 8 May 2013
    • Stone D, Lynch S and Pandullo R (1995). Flares. [online], available: http://www.gasflare.org/pdf/Flare-Type.pdf, accessed 8 May 2013.
    • (1995) Flares
    • Stone, D.1    Lynch, S.2    Pandullo, R.3
  • 75
    • 33748640607 scopus 로고    scopus 로고
    • A priority assessment multi-criteria decision model for human spaceflight mission planning at NASA
    • Tavana M (2005). A priority assessment multi-criteria decision model for human spaceflight mission planning at NASA. Journal of the Operational Research Society 57(10): 1197-1215.
    • (2005) Journal of the Operational Research Society , vol.57 , Issue.10 , pp. 1197-1215
    • Tavana, M.1
  • 76
    • 84863551247 scopus 로고    scopus 로고
    • Decision analysis and risk models for land development affecting infrastructure systems
    • Thekdi S and Lambert J (2011). Decision analysis and risk models for land development affecting infrastructure systems. Risk Analysis 32(7): 1253-1269.
    • (2011) Risk Analysis , vol.32 , Issue.7 , pp. 1253-1269
    • Thekdi, S.1    Lambert, J.2
  • 77
    • 40849136119 scopus 로고    scopus 로고
    • An integrated approach for supplier selection and purchasing decisions
    • Ting S-C and Cho D (2008). An integrated approach for supplier selection and purchasing decisions. Supply Chain Management: An International Journal 13(2): 116.
    • (2008) Supply Chain Management: An International Journal , vol.13 , Issue.2 , pp. 116
    • Ting, S.-C.1    Cho, D.2
  • 78
    • 33645320858 scopus 로고    scopus 로고
    • Reliability analysis based on the losses from failures
    • Todinov M (2006). Reliability analysis based on the losses from failures. Risk Analysis 26(2): 311-335.
    • (2006) Risk Analysis , vol.26 , Issue.2 , pp. 311-335
    • Todinov, M.1
  • 81
    • 0036528189 scopus 로고    scopus 로고
    • Safety aspects of railway and road tunnel: Example of the Lötschberg railway tunnel and Mont-Blanc road tunnel
    • Vuilleumier F, Weatherill A and Crausaz B (2002). Safety aspects of railway and road tunnel: Example of the Lötschberg railway tunnel and Mont-Blanc road tunnel. Tunnelling and Underground Space Technology 17(2): 153-158.
    • (2002) Tunnelling and Underground Space Technology , vol.17 , Issue.2 , pp. 153-158
    • Vuilleumier, F.1    Weatherill, A.2    Crausaz, B.3
  • 82
    • 0003859530 scopus 로고
    • Earthscan publications Limited: London
    • Weir D (1987). The Bhopal Syndrome. Earthscan publications Limited: London.
    • (1987) The Bhopal Syndrome
    • Weir, D.1
  • 83
    • 33750464486 scopus 로고    scopus 로고
    • An analysis of combined arms teaming for the Australian defence force
    • Wheeler S (2005). An analysis of combined arms teaming for the Australian defence force. Journal of the Operational Research Society 57(11): 1279-1288.
    • (2005) Journal of the Operational Research Society , vol.57 , Issue.11 , pp. 1279-1288
    • Wheeler, S.1
  • 84
    • 0032162442 scopus 로고    scopus 로고
    • Multiobjective linear programming model on injection oilfield recovery system
    • PII S0898122198001552
    • Xiao W, Liu Z, Jiang M and Shi Y (1998). Multiobjective linear programming model on injection oilfield recovery system. Computers & Mathematics with Applications 36(5): 127-135. (Pubitemid 128387164)
    • (1998) Computers and Mathematics with Applications , vol.36 , Issue.5 , pp. 127-135
    • Xiao, W.1    Liu, Z.2    Jiang, M.3    Shi, Y.4
  • 85
    • 58149196641 scopus 로고    scopus 로고
    • Use of fuzzy evidential reasoning in maritime security assessment
    • Yang Z, Wang J, Bonsall S and Fang Q (2009). Use of fuzzy evidential reasoning in maritime security assessment. Risk Analysis 29(1): 95-120.
    • (2009) Risk Analysis , vol.29 , Issue.1 , pp. 95-120
    • Yang, Z.1    Wang, J.2    Bonsall, S.3    Fang, Q.4
  • 86
    • 77954832044 scopus 로고    scopus 로고
    • Weighting the competitiveness factors for container ports under conflicting interests
    • Yeo G, Song D, Dinwoodie J and Roe M (2009). Weighting the competitiveness factors for container ports under conflicting interests. Journal of the Operational Research Society 61(8): 1249-1257.
    • (2009) Journal of the Operational Research Society , vol.61 , Issue.8 , pp. 1249-1257
    • Yeo, G.1    Song, D.2    Dinwoodie, J.3    Roe, M.4
  • 87
    • 0032142724 scopus 로고    scopus 로고
    • Applying risk models to formulation of safety cases
    • Youngblood R (1998). Applying risk models to formulation of safety cases. Risk Analysis 18(4): 433-444.
    • (1998) Risk Analysis , vol.18 , Issue.4 , pp. 433-444
    • Youngblood, R.1
  • 88
    • 39849092973 scopus 로고    scopus 로고
    • A fuzzy decision tree for fault classification
    • DOI 10.1111/j.1539-6924.2008.01002.x
    • Zio E, Baraldi P and Popescu I (2008). A fuzzy decision tree for fault classification. Risk Analysis 28(1): 49-67. (Pubitemid 351315502)
    • (2008) Risk Analysis , vol.28 , Issue.1 , pp. 49-67
    • Zio, E.1    Baraldi, P.2    Popescu, I.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.