-
1
-
-
0035482888
-
Algorithm for determining controlling path considering resource continuity
-
10.1061/(ASCE)0887-3801(2001)15:4(292), JCCEE5 0887-3801
-
Ammar, M. A., and, Elbeltagi, E. (2001). " Algorithm for determining controlling path considering resource continuity." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2001)15:4(292), 292-298. JCCEE5 0887-3801
-
(2001)
J. Comput. Civ. Eng.
, pp. 292-298
-
-
Ammar, M.A.1
Elbeltagi, E.2
-
3
-
-
0033338820
-
Constraint satisfaction problem: Algorithms and applications
-
", EJORDT 0377-2217 10.1016/S0377-2217(98)00364-6
-
Brailsford, S. C., Potts, C. N., and, Smith, B. M. (1999). " Constraint satisfaction problem: Algorithms and applications." Eur. J. Oper. Res., 119 (3), 557-581. EJORDT 0377-2217 10.1016/S0377-2217(98)00364-6
-
(1999)
Eur. J. Oper. Res.
, vol.119
, Issue.3
, pp. 557-581
-
-
Brailsford, S.C.1
Potts, C.N.2
Smith, B.M.3
-
4
-
-
13944279904
-
Constraint programming approach to precast production scheduling
-
10.1016/S0921-5093(01)01502-7, JSENDH 0733-9445
-
Chan, W. T., and, Hu, H. (2002). " Constraint programming approach to precast production scheduling." J. Struct. Eng., 10.1016/S0921-5093(01) 01502-7, 513-521. JSENDH 0733-9445
-
(2002)
J. Struct. Eng.
, pp. 513-521
-
-
Chan, W.T.1
Hu, H.2
-
5
-
-
84902465670
-
-
Proc. Int. Conf. on Computing in Civil Engineering, ASCE, Reston, VA.
-
Christodoulou, S. (2005). " Ant colony optimization in construction scheduling." Proc., Int. Conf. on Computing in Civil Engineering, ASCE, Reston, VA, 11-17.
-
(2005)
Ant Colony Optimization in Construction Scheduling
, pp. 11-17
-
-
Christodoulou, S.1
-
6
-
-
33745292984
-
Survey of the construction industry relative to the use of CPM scheduling for construction projects
-
10.1061/(ASCE)0733-9364(2006)132:7(697), JSENDH 0733-9445
-
Galloway, P. D. (2006). " Survey of the construction industry relative to the use of CPM scheduling for construction projects." J. Struct. Eng., 10.1061/(ASCE)0733-9364(2006)132:7(697), 697-711. JSENDH 0733-9445
-
(2006)
J. Struct. Eng.
, pp. 697-711
-
-
Galloway, P.D.1
-
7
-
-
40649101669
-
Evolutionary resource scheduler for linear projects
-
AUCOES 0926-5805 10.1016/j.autcon.2007.10.005
-
Georgy, M. E. (2008). " Evolutionary resource scheduler for linear projects." Automat. Constr., 17 (5), 573-583. AUCOES 0926-5805 10.1016/j.autcon.2007.10.005
-
(2008)
Automat. Constr.
, vol.17
, Issue.5
, pp. 573-583
-
-
Georgy, M.E.1
-
8
-
-
0004172988
-
-
2nd Ed. Wiley, Hoboken, NJ.
-
Halpin, D. W., and, Woodhead, R. W. (1998). Construction management, 2nd Ed., Wiley, Hoboken, NJ.
-
(1998)
Construction Management
-
-
Halpin, D.W.1
Woodhead, R.W.2
-
10
-
-
0035391905
-
Linear scheduling model: Float characteristics
-
10.1061/(ASCE)0733-9364(2001)127:4(255), JSENDH 0733-9445
-
Harmelink, D. J. (2001). " Linear scheduling model: Float characteristics." J. Struct. Eng., 10.1061/(ASCE)0733-9364(2001)127:4(255), 255-260. JSENDH 0733-9445
-
(2001)
J. Struct. Eng.
, pp. 255-260
-
-
Harmelink, D.J.1
-
11
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
10.1061/(ASCE)0733-9364(1998)124:4(263), JSENDH 0733-9445
-
Harmelink, D. J., and, Rowings, J. E. (1998). " Linear scheduling model: Development of controlling activity path." J. Struct. Eng., 10.1061/(ASCE)0733-9364(1998)124:4(263), 263-268. JSENDH 0733-9445
-
(1998)
J. Struct. Eng.
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
-
12
-
-
0000674566
-
Scheduling projects with repeating activities
-
10.1061/(ASCE)0733-9364(1998)124:4(269), JCEMD4 0733-9364
-
Harris, R. B., and, Ioannou, P. G. (1998). " Scheduling projects with repeating activities." J. Constr. Eng. Manage., 10.1061/(ASCE)0733- 9364(1998)124:4(269), 269-278. JCEMD4 0733-9364
-
(1998)
J. Constr. Eng. Manage.
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
13
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
10.1061/(ASCE)0733-9364(1999)125:3(167), JSENDH 0733-9445
-
Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms." J. Struct. Eng., 10.1061/(ASCE)0733- 9364(1999)125:3(167), 167-175. JSENDH 0733-9445
-
(1999)
J. Struct. Eng.
, pp. 167-175
-
-
Hegazy, T.1
-
14
-
-
0032623707
-
Comparing constraint programming and mathematical programming approaches to discrete optimization-The change problem
-
JORSDZ
-
Heipcke, S. (1999). " Comparing constraint programming and mathematical programming approaches to discrete optimization-The change problem." J. Oper. Res. Soc., 50 (6), 581-595. JORSDZ
-
(1999)
J. Oper. Res. Soc.
, vol.50
, Issue.6
, pp. 581-595
-
-
Heipcke, S.1
-
15
-
-
84902448690
-
-
IBM ILOG CPLEX Optimization Studio V12.2 [Computer software]. IBM, Armonk, NY.
-
IBM ILOG CPLEX Optimization Studio V12.2 [Computer software]. IBM, Armonk, NY.
-
-
-
-
16
-
-
0010986664
-
Algorithms for hybrid MILP/CP models for a class of optimization problems
-
1091-9856 10.1287/ijoc.13.4.258.9733
-
Jain, V., and, Grossmann, I. E. (2001). " Algorithms for hybrid MILP/CP models for a class of optimization problems." Informs J. Comput., 13 (4), 258-276. 1091-9856 10.1287/ijoc.13.4.258.9733
-
(2001)
Informs J. Comput.
, vol.13
, Issue.4
, pp. 258-276
-
-
Jain, V.1
Grossmann, I.E.2
-
17
-
-
0019583188
-
Linear scheduling method for highway construction
-
JCCEAZ 0569-7948
-
Johnston, D. W. (1981). " Linear scheduling method for highway construction." J. Constr. Div., 107 (CO2), 247-261. JCCEAZ 0569-7948
-
(1981)
J. Constr. Div.
, vol.107
, Issue.CO2
, pp. 247-261
-
-
Johnston, D.W.1
-
18
-
-
2542468807
-
Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
-
0969-9988 10.1108/09699980410535813
-
Kallantzis, A., and, Lambropoulos, S. (2004). " Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling." Eng. Construct. Architect. Manage., 11 (3), 211-222. 0969-9988 10.1108/09699980410535813
-
(2004)
Eng. Construct. Architect. Manage.
, vol.11
, Issue.3
, pp. 211-222
-
-
Kallantzis, A.1
Lambropoulos, S.2
-
19
-
-
34250630566
-
Linear versus network scheduling: A critical path comparison
-
", 10.1061/(ASCE)0733-9364(2007)133:7(483), JSENDH 0733-9445
-
Kallantzis, A., Soldatos, J., and, Lambropoulos, S. (2007). " Linear versus network scheduling: A critical path comparison." J. Struct. Eng., 10.1061/(ASCE)0733-9364(2007)133:7(483), 483-491. JSENDH 0733-9445
-
(2007)
J. Struct. Eng.
, pp. 483-491
-
-
Kallantzis, A.1
Soldatos, J.2
Lambropoulos, S.3
-
20
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
EJORDT 0377-2217 10.1016/j.ejor.2005.01.065
-
Kolisch, R., and, Hartmann, S. (2006). " Experimental investigation of heuristics for resource-constrained project scheduling: An update." Eur. J. Oper. Res., 174 (1), 23-37. EJORDT 0377-2217 10.1016/j.ejor.2005.01.065
-
(2006)
Eur. J. Oper. Res.
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
21
-
-
33847016105
-
Evolutionary algorithms applied to project scheduling problems-A survey of the state-of-the-art
-
IJPRB8 0020-7543 10.1080/00207540600800326
-
Lancaster, J., and, Ozbayrak, M. (2007). " Evolutionary algorithms applied to project scheduling problems-A survey of the state-of-the-art." Int. J. Prod. Res., 45 (2), 425-450. IJPRB8 0020-7543 10.1080/00207540600800326
-
(2007)
Int. J. Prod. Res.
, vol.45
, Issue.2
, pp. 425-450
-
-
Lancaster, J.1
Ozbayrak, M.2
-
22
-
-
33847207840
-
Optimization model for resource assignment problems of linear construction projects
-
AUCOES 0926-5805 10.1016/j.autcon.2006.08.004
-
Liu, S. S., and, Wang, C. J. (2007). " Optimization model for resource assignment problems of linear construction projects." Automat. Constr., 16 (4), 460-473. AUCOES 0926-5805 10.1016/j.autcon.2006.08.004
-
(2007)
Automat. Constr.
, vol.16
, Issue.4
, pp. 460-473
-
-
Liu, S.S.1
Wang, C.J.2
-
23
-
-
45849109552
-
Resource-constrained construction project scheduling model for profit maximization considering cash flow
-
AUCOES 0926-5805 10.1016/j.autcon.2008.04.006
-
Liu, S. S., and, Wang, C. J. (2008). " Resource-constrained construction project scheduling model for profit maximization considering cash flow." Automat. Constr., 17 (8), 966-974. AUCOES 0926-5805 10.1016/j.autcon.2008.04.006
-
(2008)
Automat. Constr.
, vol.17
, Issue.8
, pp. 966-974
-
-
Liu, S.S.1
Wang, C.J.2
-
24
-
-
84860268632
-
Optimizing linear project scheduling with multi-skilled crews
-
AUCOES 0926-5805 10.1016/j.autcon.2011.12.009
-
Liu, S. S., and, Wang, C. J. (2012). " Optimizing linear project scheduling with multi-skilled crews." Automat. Constr., 24 (1), 16-23. AUCOES 0926-5805 10.1016/j.autcon.2011.12.009
-
(2012)
Automat. Constr.
, vol.24
, Issue.1
, pp. 16-23
-
-
Liu, S.S.1
Wang, C.J.2
-
25
-
-
84902448691
-
-
MapInfo MapXtreme v7.0 [Computer software]. Pitney Bowes, Stamford, CT.
-
MapInfo MapXtreme v7.0 [Computer software]. Pitney Bowes, Stamford, CT.
-
-
-
-
26
-
-
0003426802
-
-
MIT Press, Cambridge, MA.
-
Marriott, K., and, Stucky, P. J. (1998). Programming with constraints: An introduction, MIT Press, Cambridge, MA.
-
(1998)
Programming with Constraints: An Introduction
-
-
Marriott, K.1
Stucky, P.J.2
-
27
-
-
0000466018
-
Resource leveling of linear schedules using integer linear programming
-
10.1061/(ASCE)0733-9364(1998)124:3(232), JSENDH 0733-9445
-
Mattila, K. G., and, Abraham, D. M. (1998). " Resource leveling of linear schedules using integer linear programming." J. Struct. Eng., 10.1061/(ASCE)0733-9364(1998)124:3(232), 232-244. JSENDH 0733-9445
-
(1998)
J. Struct. Eng.
, pp. 232-244
-
-
Mattila, K.G.1
Abraham, D.M.2
-
29
-
-
23744513149
-
Model-based dynamic resource management for construction projects
-
AUCOES 0926-5805 10.1016/j.autcon.2004.11.001
-
Park, M. (2005). " Model-based dynamic resource management for construction projects." Automat. Constr., 14 (5), 585-598. AUCOES 0926-5805 10.1016/j.autcon.2004.11.001
-
(2005)
Automat. Constr.
, vol.14
, Issue.5
, pp. 585-598
-
-
Park, M.1
-
30
-
-
84892234592
-
-
3rd Ed. Springer, New York.
-
Pinedo, M. L. (2008). Scheduling-Theory, algorithms, and systems, 3rd Ed., Springer, New York.
-
(2008)
Scheduling-Theory, Algorithms, and Systems
-
-
Pinedo, M.L.1
-
31
-
-
0025447970
-
RPM: Repetitive project modeling
-
10.1061/(ASCE)0733-9364(1990)116:2(316), JSENDH 0733-9445
-
Reda, R. M. (1990). " RPM: Repetitive project modeling." J. Struct. Eng., 10.1061/(ASCE)0733-9364(1990)116:2(316), 316-330. JSENDH 0733-9445
-
(1990)
J. Struct. Eng.
, pp. 316-330
-
-
Reda, R.M.1
-
32
-
-
33748706709
-
-
Elsevier, Oxfordshire, U.K.
-
Rossi, F., Peter, V. B., and, Walsh, T. (2006). Handbook of constraint programming, Elsevier, Oxfordshire, U.K.
-
(2006)
Handbook of Constraint Programming
-
-
Rossi, F.1
Peter, V.B.2
Walsh, T.3
-
33
-
-
0003584577
-
-
3rd Ed. Prentice Hall, Upper Saddle River, NJ.
-
Russell, S. J., and, Norvig, P. (2009). Artificial intelligence: A modern approach, 3rd Ed., Prentice Hall, Upper Saddle River, NJ.
-
(2009)
Artificial Intelligence: A Modern Approach
-
-
Russell, S.J.1
Norvig, P.2
-
35
-
-
0032633457
-
Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach
-
10.1061/(ASCE)0733-9364(1999)125:1(23), JSENDH 0733-9445
-
Son, J., and, Skibniewski, M. J. (1999). " Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach." J. Struct. Eng., 10.1061/(ASCE)0733-9364(1999)125:1(23), 23-31. JSENDH 0733-9445
-
(1999)
J. Struct. Eng.
, pp. 23-31
-
-
Son, J.1
Skibniewski, M.J.2
-
36
-
-
84902448692
-
-
SQL Server 2008 [Computer software]. Microsoft, Redmond, WA.
-
SQL Server 2008 [Computer software]. Microsoft, Redmond, WA.
-
-
-
-
37
-
-
84902448693
-
-
Microsoft Visual Studio 2010 [Computer software]. Microsoft, Redmond, WA.
-
Microsoft Visual Studio 2010 [Computer software]. Microsoft, Redmond, WA.
-
-
-
-
38
-
-
0035454491
-
Comparison of linear scheduling model (LSM) and critical path method (CPM)
-
10.1061/(ASCE)0733-9364(2001)127:5(374), JSENDH 0733-9445
-
Yamín, R. A., and, Harmelink, D. J. (2001). " Comparison of linear scheduling model (LSM) and critical path method (CPM)." J. Struct. Eng., 10.1061/(ASCE)0733-9364(2001)127:5(374), 374-381. JSENDH 0733-9445
-
(2001)
J. Struct. Eng.
, pp. 374-381
-
-
Yamín, R.A.1
Harmelink, D.J.2
|