메뉴 건너뛰기




Volumn 16, Issue 4, 2007, Pages 460-473

Optimization model for resource assignment problems of linear construction projects

Author keywords

Constraint programming; Linear construction projects; Linear scheduling; Outsourcing resources; Resource assignment

Indexed keywords

CONSTRUCTION INDUSTRY; MATHEMATICAL MODELS; OUTSOURCING; PROBLEM SOLVING; RESOURCE ALLOCATION;

EID: 33847207840     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2006.08.004     Document Type: Article
Times cited : (72)

References (24)
  • 1
    • 13944263588 scopus 로고    scopus 로고
    • Comparison of linear scheduling model and repetitive scheduling method
    • Mattila K.G., and Park A. Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management 129 1 (2003) 56-64
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.1 , pp. 56-64
    • Mattila, K.G.1    Park, A.2
  • 4
  • 6
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • Selinger S. Construction planning for linear projects. Journal of the Construction Division 106 2 (1980) 195-205
    • (1980) Journal of the Construction Division , vol.106 , Issue.2 , pp. 195-205
    • Selinger, S.1
  • 9
    • 5244378567 scopus 로고    scopus 로고
    • Dynamic programming approach to scheduling of nonserial linear project
    • Senouci A.B., and Eldin N.N. Dynamic programming approach to scheduling of nonserial linear project. Journal of Computing in Civil Engineering 10 2 (1996) 106-114
    • (1996) Journal of Computing in Civil Engineering , vol.10 , Issue.2 , pp. 106-114
    • Senouci, A.B.1    Eldin, N.N.2
  • 12
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive scheduling model with shareable resource constraint
    • Leu S.S., and Hwang S.T. Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management 127 4 (2001) 270-280
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.S.1    Hwang, S.T.2
  • 13
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • Hyari K., and El-Rayes K. Optimal planning and scheduling for repetitive construction projects. Journal of Management in Engineering 22 1 (2006) 11-19
    • (2006) Journal of Management in Engineering , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 16
    • 13944279904 scopus 로고    scopus 로고
    • Constraint programming approach to precast production scheduling
    • Chan W.T., and Hu H. Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management 128 6 (2002) 513-521
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 513-521
    • Chan, W.T.1    Hu, H.2
  • 19
    • 0032623707 scopus 로고    scopus 로고
    • Comparing constraint programming and mathematical programming approaches to discrete optimisation - the change problem
    • Heipcke S. Comparing constraint programming and mathematical programming approaches to discrete optimisation - the change problem. Journal of the Operational Research Society 50 (1999) 581-595
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 581-595
    • Heipcke, S.1
  • 22
    • 33847184507 scopus 로고    scopus 로고
    • S. Heipcke, Combined modeling and problem solving in mathematical programming and constraint programming, Ph.D. Thesis, School of Business, University of Buckingham, 1999.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.