-
2
-
-
0028401306
-
Case-based reasoning: Foundation issues, methodological variations, and system approach
-
A. Aamodt, and E. Plaza Case-based reasoning: foundation issues, methodological variations, and system approach AI Commun. 7 1 1994 39 59
-
(1994)
AI Commun.
, vol.7
, Issue.1
, pp. 39-59
-
-
Aamodt, A.1
Plaza, E.2
-
3
-
-
33847026525
-
A case-based reasoning cost-estimating model using experience by analytic hierarchy process
-
S.H. An, G.H. Kim, and K.I. Kang A case-based reasoning cost-estimating model using experience by analytic hierarchy process Build. Environ. 42 7 2007 2573 2579
-
(2007)
Build. Environ.
, vol.42
, Issue.7
, pp. 2573-2579
-
-
An, S.H.1
Kim, G.H.2
Kang, K.I.3
-
5
-
-
0034655066
-
Neural networks for cost estimation: Simulations and pilot application
-
J. Bode Neural networks for cost estimation: simulations and pilot application Int. J. Prod. Res. 38 6 2000 25 30
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.6
, pp. 25-30
-
-
Bode, J.1
-
6
-
-
84898861660
-
Prediction bounds for general-error-regression cost-estimating relationships
-
S.A. Book Prediction bounds for general-error-regression cost-estimating relationships J. Cost Anal. Parametrics 5 1 2012 25 51
-
(2012)
J. Cost Anal. Parametrics
, vol.5
, Issue.1
, pp. 25-51
-
-
Book, S.A.1
-
7
-
-
57649199673
-
Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model
-
M.Y. Cheng, H.C. Tsai, and W.S. Hsieh Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model Autom. Constr. 18 2 2009 164 172
-
(2009)
Autom. Constr.
, vol.18
, Issue.2
, pp. 164-172
-
-
Cheng, M.Y.1
Tsai, H.C.2
Hsieh, W.S.3
-
8
-
-
56349153507
-
Web-based CBR systems applied to early cost budgeting for pavement maintenance project
-
J.S. Chou Web-based CBR systems applied to early cost budgeting for pavement maintenance project Expert Syst. Appl. 36 2 2009 2947 2960
-
(2009)
Expert Syst. Appl.
, vol.36
, Issue.2
, pp. 2947-2960
-
-
Chou, J.S.1
-
9
-
-
33748765247
-
Determining attribute weights in a CBR model for early cost prediction of structural systems
-
DOI 10.1061/(ASCE)0733-9364(2006)132:10(1092)
-
S.Z. Dogan, D.A. Arditi, and H.M. Gunaydin Determining attribute weights in a CBR model for early cost prediction of structural system J. Constr. Eng. Manag. 132 10 2006 1092 1098 (Pubitemid 44410235)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1092-1098
-
-
Dogan, S.Z.1
Arditi, D.2
Murat Gunaydin, H.3
-
10
-
-
0033354365
-
Cost estimation during design step: Parametric method versus case based reasoning method
-
DOI 10.1007/s001700050147
-
P. Duverlie, and J.M. Castelain Cost estimation during design step: parametric method versus case-based reasoning method Int. J. Adv. Manuf. Technol. 15 12 1999 895 906 (Pubitemid 30531741)
-
(1999)
International Journal of Advanced Manufacturing Technology
, vol.15
, Issue.12
, pp. 895-906
-
-
Duverlie, P.1
Castelain, J.M.2
-
11
-
-
0032083467
-
Cost-to-capacity analysis for estimating waste-to-energy facility costs
-
K.R. Ellsworth Cost-to-capacity analysis for estimating waste-to-energy facility costs Cost Eng. 40 6 1998 27 30
-
(1998)
Cost Eng.
, vol.40
, Issue.6
, pp. 27-30
-
-
Ellsworth, K.R.1
-
13
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
T. Hegazy, and A. Ayed Neural network model for parametric cost estimating of highway projects J. Constr. Eng. Manag. 124 3 1998 210 218 (Pubitemid 128562880)
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
14
-
-
36248954911
-
Computer-integrated system for estimating the costs of building projects
-
DOI 10.1061/(ASCE)1076-0431(2007)13:4(205)
-
A. Jarde, and S. Alkass Computer-integrated system for estimating the costs of building project J. Constr. Eng. Manag. 13 4 2007 205 223 (Pubitemid 350129106)
-
(2007)
Journal of Architectural Engineering
, vol.13
, Issue.4
, pp. 205-223
-
-
Jrade, A.1
Alkass, S.2
-
15
-
-
77955338136
-
Data preprocessing-based parametric cost model for building projects: With case studies of Korean construction projects
-
S.H. Ji, M. Park, and H.S. Lee Data preprocessing-based parametric cost model for building projects: with case studies of Korean construction projects J. Constr. Eng. Manag. 136 8 2010 844 853
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.8
, pp. 844-853
-
-
Ji, S.H.1
Park, M.2
Lee, H.S.3
-
16
-
-
79957588584
-
Military facility cost estimation system (MilFaCE) using case-based reasoning in Korea
-
S.H. Ji, M. Park, H.S. Lee, J. Ahn, N. Kim, and B. Son Military facility cost estimation system (MilFaCE) using case-based reasoning in Korea J. Comput. Civ. Eng. 25 3 2011 218 231
-
(2011)
J. Comput. Civ. Eng.
, vol.25
, Issue.3
, pp. 218-231
-
-
Ji, S.H.1
Park, M.2
Lee, H.S.3
Ahn, J.4
Kim, N.5
Son, B.6
-
17
-
-
79958823881
-
Cost estimation model for building projects using case-based reasoning
-
S.H. Ji, M. Park, and H.S. Lee Cost estimation model for building projects using case-based reasoning Can. J. Civ. Eng. 38 5 2011 570 581
-
(2011)
Can. J. Civ. Eng.
, vol.38
, Issue.5
, pp. 570-581
-
-
Ji, S.H.1
Park, M.2
Lee, H.S.3
-
18
-
-
84861809811
-
A hybrid conceptual cost estimating model for large building projects
-
H.J. Kim, Y.C. Seo, and C.T. Hyun A hybrid conceptual cost estimating model for large building projects Autom. Constr. 25 9 2012 72 81
-
(2012)
Autom. Constr.
, vol.25
, Issue.9
, pp. 72-81
-
-
Kim, H.J.1
Seo, Y.C.2
Hyun, C.T.3
-
20
-
-
84872939930
-
Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation
-
S. Kim Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation J. Civ. Eng. Manag. 19 1 2013 86 96
-
(2013)
J. Civ. Eng. Manag.
, vol.19
, Issue.1
, pp. 86-96
-
-
Kim, S.1
-
25
-
-
0000103290
-
Case-based reasoning and improved adaptive search for project scheduling
-
A. Schirmer Case-based reasoning and improved adaptive search for project scheduling Nav. Res. Logist. 47 3 2000 201 222
-
(2000)
Nav. Res. Logist.
, vol.47
, Issue.3
, pp. 201-222
-
-
Schirmer, A.1
-
27
-
-
84898902112
-
Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects
-
K.H. Seong, M. Park, H.S. Lee, and S.H. Ji Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects 2008 Annual Conference, Korea Institute of Construction Engineering and Management 2008 219 223
-
(2008)
2008 Annual Conference, Korea Institute of Construction Engineering and Management
, pp. 219-223
-
-
Seong, K.H.1
Park, M.2
Lee, H.S.3
Ji, S.H.4
-
29
-
-
0031336193
-
Cost estimation predictive modeling: Regression versus neural network
-
A.E. Smith, and A.K. Mason Cost estimation predictive modeling: regression versus neural network Eng. Econ. 42 2 1997 137 161
-
(1997)
Eng. Econ.
, vol.42
, Issue.2
, pp. 137-161
-
-
Smith, A.E.1
Mason, A.K.2
-
30
-
-
56349131859
-
Parametric range estimating of building costs using regression models and bootstrap
-
R. Sonmez Parametric range estimating of building costs using regression models and bootstrap J. Constr. Eng. Manag. 134 12 2008 1011 1016
-
(2008)
J. Constr. Eng. Manag.
, vol.134
, Issue.12
, pp. 1011-1016
-
-
Sonmez, R.1
|