Estimating the cost of capital projects: An empirical study of accuracy levels for municipal government projects
-
".
-
AbouRizk, S. M., Babey, G. M., and Karumanasseri, G. (2002). " Estimating the cost of capital projects: An empirical study of accuracy levels for municipal government projects.." Can. J. Civ. Eng., 29 (5), 653-661.
-
(2002)
Can. J. Civ. Eng.
, vol.29
, Issue.5
, pp. 653-661
-
-
Abourizk, S.M.1
Babey, G.M.2
Karumanasseri, G.3
-
2
-
-
0002596236
-
Regularization neural network for construction cost estimation
-
Adeli, H., and Wu, M. (1998). " Regularization neural network for construction cost estimation.." J. Constr. Eng. Manage., 124 (1), 18-24.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 18-24
-
-
Adeli, H.1
Wu, M.2
-
3
-
-
0003713797
-
-
Wiley, New York.
-
Belsley, D. A., Kuh, E., and Welsch, R. (1980). Regression diagnostics: Identifying influential data and sources of collinearity, Wiley, New York.
-
(1980)
Regression Diagnostics: Identifying Influential Data and Sources of Collinearity
-
-
Belsley, D.A.1
Kuh, E.2
Welsch, R.3
-
5
-
-
33750981019
-
Estimation risk in financial risk management
-
Christoffersen, P., and Goncalves, S. (2005). " Estimation risk in financial risk management.." J. Risk, 7 (3), 1-28.
-
(2005)
J. Risk
, vol.7
, Issue.3
, pp. 1-28
-
-
Christoffersen, P.1
Goncalves, S.2
-
7
-
-
31144446239
-
Determination of required falling weight deflectometer testing frequency for pavement structural evaluation at the network level
-
Damnjanovic, I., and Zhang, Z. (2006). " Determination of required falling weight deflectometer testing frequency for pavement structural evaluation at the network level.." J. Transp. Eng., 132 (1), 76-85.
-
(2006)
J. Transp. Eng.
, vol.132
, Issue.1
, pp. 76-85
-
-
Damnjanovic, I.1
Zhang, Z.2
-
8
-
-
0003484780
-
-
Cambridge University Press, Cambridge, U.K.
-
Davison, A. C., and Hinkley, D. V. (1997). Bootstrap methods and their application, Cambridge University Press, Cambridge, U.K.
-
(1997)
Bootstrap Methods and Their Application
-
-
Davison, A.C.1
Hinkley, D.V.2
-
9
-
-
0020825299
-
Probabilistic estimating: Mathematics and applications
-
Diekmann, J. E. (1983). " Probabilistic estimating: Mathematics and applications.." J. Constr. Eng. Manage., 109 (3), 297-308.
-
(1983)
J. Constr. Eng. Manage.
, vol.109
, Issue.3
, pp. 297-308
-
-
Diekmann, J.E.1
-
11
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
Hegazy, T., and Ayed, A. (1998). " Neural network model for parametric cost estimation of highway projects.." J. Constr. Eng. Manage., 124 (3), 210-218.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
12
-
-
34547992796
-
A macro approach to estimating correlated random variables in engineering production projects
-
Hudak, D., and Maxwell, M. (2007). " A macro approach to estimating correlated random variables in engineering production projects.." Constr. Manage. Econom. 25 (8), 883-892.
-
(2007)
Constr. Manage. Econom.
, vol.25
, Issue.8
, pp. 883-892
-
-
Hudak, D.1
Maxwell, M.2
-
13
-
-
8644292857
-
Multiple simulation analysis for probabilistic cost and schedule integration
-
Isidore, J. L., and Back, W. E. (2002). " Multiple simulation analysis for probabilistic cost and schedule integration.." J. Constr. Eng. Manage., 128 (3), 211-219.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.3
, pp. 211-219
-
-
Isidore, J.L.1
Back, W.E.2
-
14
-
-
80052896776
-
An introduction to bootstrap
-
Johnson, R. W. (2001). " An introduction to bootstrap.." Teaching Statistics, 23 (2), 49-54.
-
(2001)
Teaching Statistics
, vol.23
, Issue.2
, pp. 49-54
-
-
Johnson, R.W.1
-
15
-
-
32944477039
-
Offshore decommissioning cost estimation in the Gulf of Mexico
-
Kaiser, M. J. (2006). " Offshore decommissioning cost estimation in the Gulf of Mexico.." J. Constr. Eng. Manage., 132 (3), 249-258.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.3
, pp. 249-258
-
-
Kaiser, M.J.1
-
16
-
-
0021392855
-
Predesign cost estimating method for multistory buildings
-
Karshenas, S. (1984). " Predesign cost estimating method for multistory buildings.." J. Constr. Eng. Manage., 110 (1), 79-86.
-
(1984)
J. Constr. Eng. Manage.
, vol.110
, Issue.1
, pp. 79-86
-
-
Karshenas, S.1
-
17
-
-
18144382336
-
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
-
".
-
Kim, G. H., Seo, D. S., and Kang, K. I. (2005). " Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates.." J. Comput. Civ. Eng., 19 (2), 208-211.
-
(2005)
J. Comput. Civ. Eng.
, vol.19
, Issue.2
, pp. 208-211
-
-
Kim, G.H.1
Seo, D.S.2
Kang, K.I.3
-
18
-
-
0016317024
-
Predesign cost-estimation function for buildings
-
Kouskoulas, V., and Koehn, E. (1974). " Predesign cost-estimation function for buildings.." J. Constr. Div., 100 (CO4), 589-604.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.CO4
, pp. 589-604
-
-
Kouskoulas, V.1
Koehn, E.2
-
19
-
-
33745325166
-
Predicting construction cost using multiple regression techniques
-
".
-
Lowe, D. J., Emsley, M. W., and Harding, A. (2006). " Predicting construction cost using multiple regression techniques.." J. Constr. Eng. Manage., 132 (7), 750-758.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.7
, pp. 750-758
-
-
Lowe, D.J.1
Emsley, M.W.2
Harding, A.3
-
20
-
-
17944375990
-
Integrated risk management with a filtered bootstrap approach
-
".
-
Marsala, C., Pallotta, M., and Zenti, R. (2004). " Integrated risk management with a filtered bootstrap approach.." Economic Notes, 33 (3), 375-398.
-
(2004)
Economic Notes
, vol.33
, Issue.3
, pp. 375-398
-
-
Marsala, C.1
Pallotta, M.2
Zenti, R.3
-
21
-
-
12444255879
-
Discussion of Monte Carlo technique with correlated random variables' by A. Touran and E. Wiser
-
Moselhi, O., and Dimitrov, B. (1993). " Discussion of Monte Carlo technique with correlated random variables' by A. Touran and E. Wiser.." J. Constr. Eng. Manage., 119 (3), 658-660.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.3
, pp. 658-660
-
-
Moselhi, O.1
Dimitrov, B.2
-
22
-
-
0035335579
-
Predicting accuracy of early cost estimates based on estimate quality
-
Oberlender, G. D., and Trost, S. M. (2001). " Predicting accuracy of early cost estimates based on estimate quality.." J. Constr. Eng. Manage., 127 (3), 173-182.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 173-182
-
-
Oberlender, G.D.1
Trost, S.M.2
-
24
-
-
13944263949
-
Analytical and approximate variance of total project cost
-
Skitmore, M., and Ng, S. T. (2002). " Analytical and approximate variance of total project cost.." J. Constr. Eng. Manage., 128 (5), 456-460.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.5
, pp. 456-460
-
-
Skitmore, M.1
Ng, S.T.2
-
25
-
-
8644243809
-
Conceptual cost estimation of building projects with regression analysis and neural networks
-
Sonmez, R. (2004). " Conceptual cost estimation of building projects with regression analysis and neural networks.." Can. J. Civ. Eng., 31 (4), 677-683.
-
(2004)
Can. J. Civ. Eng.
, vol.31
, Issue.4
, pp. 677-683
-
-
Sonmez, R.1
-
26
-
-
0031280538
-
Bootstrap position analysis for forecasting low flow frequency
-
Tasker, G. D., and Dunne, P. (1997). " Bootstrap position analysis for forecasting low flow frequency.." J. Water Resour. Plann. Manage., 123 (6), 359-367.
-
(1997)
J. Water Resour. Plann. Manage.
, vol.123
, Issue.6
, pp. 359-367
-
-
Tasker, G.D.1
Dunne, P.2
-
27
-
-
0026881995
-
Monte Carlo technique with correlated random variables
-
Touran, A., and Wiser, E. (1992). " Monte Carlo technique with correlated random variables.." J. Constr. Eng. Manage., 118 (2), 258-272.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.2
, pp. 258-272
-
-
Touran, A.1
Wiser, E.2
-
28
-
-
0009766039
-
SIM-UTILITY: Model for project ceiling price determination
-
Wang, W. C. (2002). " SIM-UTILITY: Model for project ceiling price determination.." J. Constr. Eng. Manage., 128 (1), 76-84.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.1
, pp. 76-84
-
-
Wang, W.C.1
|