Volumn 134, Issue 12, 2008, Pages 1011-1016

Parametric range estimating of building costs using regression models and bootstrap

Author keywords

Construction costs; Estimations; Parameters; Probability; Regression analysis

Indexed keywords

CONSTRUCTION INDUSTRY; COSTS; ESTIMATION; PROBABILITY; REGRESSION ANALYSIS;

EID: 56349131859     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2008)134:12(1011)     Document Type: Article
Times cited : (61)

References (28)
  • 1
    • 0036027027 scopus 로고    scopus 로고
    • Estimating the cost of capital projects: An empirical study of accuracy levels for municipal government projects
    • ".
    • AbouRizk, S. M., Babey, G. M., and Karumanasseri, G. (2002). " Estimating the cost of capital projects: An empirical study of accuracy levels for municipal government projects.." Can. J. Civ. Eng., 29 (5), 653-661.
    • (2002) Can. J. Civ. Eng. , vol.29 , Issue.5 , pp. 653-661
    • Abourizk, S.M.1    Babey, G.M.2    Karumanasseri, G.3
  • 2
    • 0002596236 scopus 로고    scopus 로고
    • Regularization neural network for construction cost estimation
    • Adeli, H., and Wu, M. (1998). " Regularization neural network for construction cost estimation.." J. Constr. Eng. Manage., 124 (1), 18-24.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 18-24
    • Adeli, H.1    Wu, M.2
  • 5
    • 33750981019 scopus 로고    scopus 로고
    • Estimation risk in financial risk management
    • Christoffersen, P., and Goncalves, S. (2005). " Estimation risk in financial risk management.." J. Risk, 7 (3), 1-28.
    • (2005) J. Risk , vol.7 , Issue.3 , pp. 1-28
    • Christoffersen, P.1    Goncalves, S.2
  • 7
    • 31144446239 scopus 로고    scopus 로고
    • Determination of required falling weight deflectometer testing frequency for pavement structural evaluation at the network level
    • Damnjanovic, I., and Zhang, Z. (2006). " Determination of required falling weight deflectometer testing frequency for pavement structural evaluation at the network level.." J. Transp. Eng., 132 (1), 76-85.
    • (2006) J. Transp. Eng. , vol.132 , Issue.1 , pp. 76-85
    • Damnjanovic, I.1    Zhang, Z.2
  • 9
    • 0020825299 scopus 로고
    • Probabilistic estimating: Mathematics and applications
    • Diekmann, J. E. (1983). " Probabilistic estimating: Mathematics and applications.." J. Constr. Eng. Manage., 109 (3), 297-308.
    • (1983) J. Constr. Eng. Manage. , vol.109 , Issue.3 , pp. 297-308
    • Diekmann, J.E.1
  • 11
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy, T., and Ayed, A. (1998). " Neural network model for parametric cost estimation of highway projects.." J. Constr. Eng. Manage., 124 (3), 210-218.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 12
    • 34547992796 scopus 로고    scopus 로고
    • A macro approach to estimating correlated random variables in engineering production projects
    • Hudak, D., and Maxwell, M. (2007). " A macro approach to estimating correlated random variables in engineering production projects.." Constr. Manage. Econom. 25 (8), 883-892.
    • (2007) Constr. Manage. Econom. , vol.25 , Issue.8 , pp. 883-892
    • Hudak, D.1    Maxwell, M.2
  • 13
    • 8644292857 scopus 로고    scopus 로고
    • Multiple simulation analysis for probabilistic cost and schedule integration
    • Isidore, J. L., and Back, W. E. (2002). " Multiple simulation analysis for probabilistic cost and schedule integration.." J. Constr. Eng. Manage., 128 (3), 211-219.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.3 , pp. 211-219
    • Isidore, J.L.1    Back, W.E.2
  • 14
    • 80052896776 scopus 로고    scopus 로고
    • An introduction to bootstrap
    • Johnson, R. W. (2001). " An introduction to bootstrap.." Teaching Statistics, 23 (2), 49-54.
    • (2001) Teaching Statistics , vol.23 , Issue.2 , pp. 49-54
    • Johnson, R.W.1
  • 15
    • 32944477039 scopus 로고    scopus 로고
    • Offshore decommissioning cost estimation in the Gulf of Mexico
    • Kaiser, M. J. (2006). " Offshore decommissioning cost estimation in the Gulf of Mexico.." J. Constr. Eng. Manage., 132 (3), 249-258.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.3 , pp. 249-258
    • Kaiser, M.J.1
  • 16
    • 0021392855 scopus 로고
    • Predesign cost estimating method for multistory buildings
    • Karshenas, S. (1984). " Predesign cost estimating method for multistory buildings.." J. Constr. Eng. Manage., 110 (1), 79-86.
    • (1984) J. Constr. Eng. Manage. , vol.110 , Issue.1 , pp. 79-86
    • Karshenas, S.1
  • 17
    • 18144382336 scopus 로고    scopus 로고
    • Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
    • ".
    • Kim, G. H., Seo, D. S., and Kang, K. I. (2005). " Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates.." J. Comput. Civ. Eng., 19 (2), 208-211.
    • (2005) J. Comput. Civ. Eng. , vol.19 , Issue.2 , pp. 208-211
    • Kim, G.H.1    Seo, D.S.2    Kang, K.I.3
  • 18
    • 0016317024 scopus 로고
    • Predesign cost-estimation function for buildings
    • Kouskoulas, V., and Koehn, E. (1974). " Predesign cost-estimation function for buildings.." J. Constr. Div., 100 (CO4), 589-604.
    • (1974) J. Constr. Div. , vol.100 , Issue.CO4 , pp. 589-604
    • Kouskoulas, V.1    Koehn, E.2
  • 19
    • 33745325166 scopus 로고    scopus 로고
    • Predicting construction cost using multiple regression techniques
    • ".
    • Lowe, D. J., Emsley, M. W., and Harding, A. (2006). " Predicting construction cost using multiple regression techniques.." J. Constr. Eng. Manage., 132 (7), 750-758.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.7 , pp. 750-758
    • Lowe, D.J.1    Emsley, M.W.2    Harding, A.3
  • 20
    • 17944375990 scopus 로고    scopus 로고
    • Integrated risk management with a filtered bootstrap approach
    • ".
    • Marsala, C., Pallotta, M., and Zenti, R. (2004). " Integrated risk management with a filtered bootstrap approach.." Economic Notes, 33 (3), 375-398.
    • (2004) Economic Notes , vol.33 , Issue.3 , pp. 375-398
    • Marsala, C.1    Pallotta, M.2    Zenti, R.3
  • 21
    • 12444255879 scopus 로고
    • Discussion of Monte Carlo technique with correlated random variables' by A. Touran and E. Wiser
    • Moselhi, O., and Dimitrov, B. (1993). " Discussion of Monte Carlo technique with correlated random variables' by A. Touran and E. Wiser.." J. Constr. Eng. Manage., 119 (3), 658-660.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.3 , pp. 658-660
    • Moselhi, O.1    Dimitrov, B.2
  • 22
    • 0035335579 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates based on estimate quality
    • Oberlender, G. D., and Trost, S. M. (2001). " Predicting accuracy of early cost estimates based on estimate quality.." J. Constr. Eng. Manage., 127 (3), 173-182.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.3 , pp. 173-182
    • Oberlender, G.D.1    Trost, S.M.2
  • 24
    • 13944263949 scopus 로고    scopus 로고
    • Analytical and approximate variance of total project cost
    • Skitmore, M., and Ng, S. T. (2002). " Analytical and approximate variance of total project cost.." J. Constr. Eng. Manage., 128 (5), 456-460.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.5 , pp. 456-460
    • Skitmore, M.1    Ng, S.T.2
  • 25
    • 8644243809 scopus 로고    scopus 로고
    • Conceptual cost estimation of building projects with regression analysis and neural networks
    • Sonmez, R. (2004). " Conceptual cost estimation of building projects with regression analysis and neural networks.." Can. J. Civ. Eng., 31 (4), 677-683.
    • (2004) Can. J. Civ. Eng. , vol.31 , Issue.4 , pp. 677-683
    • Sonmez, R.1
  • 26
    • 0031280538 scopus 로고    scopus 로고
    • Bootstrap position analysis for forecasting low flow frequency
    • Tasker, G. D., and Dunne, P. (1997). " Bootstrap position analysis for forecasting low flow frequency.." J. Water Resour. Plann. Manage., 123 (6), 359-367.
    • (1997) J. Water Resour. Plann. Manage. , vol.123 , Issue.6 , pp. 359-367
    • Tasker, G.D.1    Dunne, P.2
  • 27
    • 0026881995 scopus 로고
    • Monte Carlo technique with correlated random variables
    • Touran, A., and Wiser, E. (1992). " Monte Carlo technique with correlated random variables.." J. Constr. Eng. Manage., 118 (2), 258-272.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.2 , pp. 258-272
    • Touran, A.1    Wiser, E.2
  • 28
    • 0009766039 scopus 로고    scopus 로고
    • SIM-UTILITY: Model for project ceiling price determination
    • Wang, W. C. (2002). " SIM-UTILITY: Model for project ceiling price determination.." J. Constr. Eng. Manage., 128 (1), 76-84.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 76-84
    • Wang, W.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.