메뉴 건너뛰기




Volumn 18, Issue 2, 2009, Pages 164-172

Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model

Author keywords

Conceptual estimates; Construction cost; Fuzzy Logic; Genetic Algorithms; Neural Networks

Indexed keywords

ARTIFICIAL INTELLIGENCE; CONSTRUCTION INDUSTRY; COST ACCOUNTING; COSTS; EVOLUTIONARY ALGORITHMS; FUZZY INFERENCE; FUZZY LOGIC; FUZZY NEURAL NETWORKS; FUZZY SETS; FUZZY SYSTEMS; GENETIC ALGORITHMS; NEURAL NETWORKS; PLANNING; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 57649199673     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.07.001     Document Type: Article
Times cited : (101)

References (31)
  • 1
    • 0002596236 scopus 로고    scopus 로고
    • Regularization neural network for construction cost estimation
    • Adeli H., and Wu M. Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management 124 1 (1998) 18-24
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.1 , pp. 18-24
    • Adeli, H.1    Wu, M.2
  • 2
    • 33847026525 scopus 로고    scopus 로고
    • A case-based reasoning cost estimating model using experience by analytic hierarchy process
    • An S.H., Kim G.H., and Kang K.I. A case-based reasoning cost estimating model using experience by analytic hierarchy process. Building and Environment 42 7 (2007) 2573-2579
    • (2007) Building and Environment , vol.42 , Issue.7 , pp. 2573-2579
    • An, S.H.1    Kim, G.H.2    Kang, K.I.3
  • 3
    • 0026172606 scopus 로고
    • Expert system for cost estimating software selection
    • Arditi D., and Suh K. Expert system for cost estimating software selection. Cost Engineering 33 6 (1991) 9-19
    • (1991) Cost Engineering , vol.33 , Issue.6 , pp. 9-19
    • Arditi, D.1    Suh, K.2
  • 4
    • 77949835823 scopus 로고    scopus 로고
    • A neurofuzzy model for predicting cost and duration of construction projects
    • The Royal Institution of Chartered Surveyors 9 pages
    • Boussabaine A.H., and Elhag T.M.S. A neurofuzzy model for predicting cost and duration of construction projects. RICS Research (1997), The Royal Institution of Chartered Surveyors 9 pages
    • (1997) RICS Research
    • Boussabaine, A.H.1    Elhag, T.M.S.2
  • 5
    • 0041852560 scopus 로고
    • Cost modeling and price forecasting; practice and theory in perspective
    • Bowen P.A., and Edwards P.J. Cost modeling and price forecasting; practice and theory in perspective. Construction Management and Economics 3 (1985) 199-215
    • (1985) Construction Management and Economics , vol.3 , pp. 199-215
    • Bowen, P.A.1    Edwards, P.J.2
  • 6
    • 0036605002 scopus 로고    scopus 로고
    • Computer-aided decision support system for hillside safety monitoring
    • Cheng M.Y., and Ko C.H. Computer-aided decision support system for hillside safety monitoring. Automation in Construction 11 4 (2002) 453-466
    • (2002) Automation in Construction , vol.11 , Issue.4 , pp. 453-466
    • Cheng, M.Y.1    Ko, C.H.2
  • 7
    • 13944284177 scopus 로고    scopus 로고
    • Object-oriented evolutionary fuzzy neural inference system for construction management
    • Cheng M.Y., and Ko C.H. Object-oriented evolutionary fuzzy neural inference system for construction management. Journal of Construction Engineering and Management 129 4 (2003) 461-469
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 461-469
    • Cheng, M.Y.1    Ko, C.H.2
  • 9
    • 84887240853 scopus 로고    scopus 로고
    • Training neuro-fuzzy boiler identifier with genetic algorithm and error back-propagation
    • Ghezelayagh H., and Lee K.Y. Training neuro-fuzzy boiler identifier with genetic algorithm and error back-propagation. IEEE Power Engineering Society 2 (1999) 978-982
    • (1999) IEEE Power Engineering Society , vol.2 , pp. 978-982
    • Ghezelayagh, H.1    Lee, K.Y.2
  • 13
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy T., and Ayed A. Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management 124 3 (1998) 210-218
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 15
    • 0033083823 scopus 로고    scopus 로고
    • An investigation into the application of neural networks, fuzzy logic, genetic algorithms, and rough sets to automated knowledge acquisition for classification problems
    • Jagielska I., Matthews C., and Whitfort T. An investigation into the application of neural networks, fuzzy logic, genetic algorithms, and rough sets to automated knowledge acquisition for classification problems. Neurocomputing 24 1-3 (1999) 37-54
    • (1999) Neurocomputing , vol.24 , Issue.1-3 , pp. 37-54
    • Jagielska, I.1    Matthews, C.2    Whitfort, T.3
  • 16
    • 0030182808 scopus 로고    scopus 로고
    • Estimation of project total cost and duration for housing projects in the UK
    • Khosrowshahi F., and Kaka A.P. Estimation of project total cost and duration for housing projects in the UK. Building and Environment 31 4 (1996) 373-383
    • (1996) Building and Environment , vol.31 , Issue.4 , pp. 373-383
    • Khosrowshahi, F.1    Kaka, A.P.2
  • 17
    • 18144382336 scopus 로고    scopus 로고
    • Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
    • Kim G.H., Seo D.S., and Kang K.I. Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates. Journal of Computing in Civil Engineering 19 2 (2005) 208-211
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 208-211
    • Kim, G.H.1    Seo, D.S.2    Kang, K.I.3
  • 20
    • 33845735085 scopus 로고    scopus 로고
    • Improving cost estimates of construction projects using phased cost factors
    • Liu L., and Zhu K. Improving cost estimates of construction projects using phased cost factors. Journal of Construction Engineering and Management 133 1 (2007) 91-95
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.1 , pp. 91-95
    • Liu, L.1    Zhu, K.2
  • 23
    • 0001025286 scopus 로고    scopus 로고
    • An integrated knowledge-based system for alternative design and materials selection and cost estimating
    • Mohamed A., and Celik T. An integrated knowledge-based system for alternative design and materials selection and cost estimating. Expert Systems with Applications 14 3 (1998) 329-339
    • (1998) Expert Systems with Applications , vol.14 , Issue.3 , pp. 329-339
    • Mohamed, A.1    Celik, T.2
  • 25
    • 2142763089 scopus 로고    scopus 로고
    • Towards a knowledge-based assessment of conceptual cost estimates
    • Serpell A.F. Towards a knowledge-based assessment of conceptual cost estimates. Building Research and Information 32 2 (2004) 157-164
    • (2004) Building Research and Information , vol.32 , Issue.2 , pp. 157-164
    • Serpell, A.F.1
  • 26
    • 0025403102 scopus 로고
    • Cost model for reinforced concrete beam and slab structures in building
    • Singh S. Cost model for reinforced concrete beam and slab structures in building. Journal of Construction Engineering and Management 116 1 (1990) 54-67
    • (1990) Journal of Construction Engineering and Management , vol.116 , Issue.1 , pp. 54-67
    • Singh, S.1
  • 28
    • 0028457079 scopus 로고
    • Predicting changes in construction cost indexes using neural networks
    • Williams T.P. Predicting changes in construction cost indexes using neural networks. Journal of Construction Engineering and Management 120 2 (1994) 306-320
    • (1994) Journal of Construction Engineering and Management , vol.120 , Issue.2 , pp. 306-320
    • Williams, T.P.1
  • 30
    • 26444438076 scopus 로고    scopus 로고
    • A WICE approach to real-time construction cost estimation
    • Yu W.D., Lai C.C., and Lee W.L. A WICE approach to real-time construction cost estimation. Automation in Construction 15 1 (2006) 12-19
    • (2006) Automation in Construction , vol.15 , Issue.1 , pp. 12-19
    • Yu, W.D.1    Lai, C.C.2    Lee, W.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.