메뉴 건너뛰기




Volumn 66, Issue 4, 2013, Pages 808-817

Lead time control in multi-class multi-stage assembly systems with finite capacity

Author keywords

Assembly systems; Markov processes; Multiple objective programming

Indexed keywords

ASSEMBLY SYSTEMS; CONTINUOUS-TIME MARKOV PROCESS; CONTINUOUS-TIME PROBLEMS; DISTRIBUTED RANDOM VARIABLES; FIRST COME FIRST SERVED; MULTI-OBJECTIVE MODELING; MULTIPLE OBJECTIVE PROGRAMMING; SYSTEM OF DIFFERENTIAL EQUATIONS;

EID: 84887069802     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2013.10.004     Document Type: Article
Times cited : (9)

References (53)
  • 2
    • 15244342527 scopus 로고    scopus 로고
    • Distribution function of the shortest path in networks of queues
    • DOI 10.1007/s00291-004-0169-3
    • A. Azaron, and M. Modarres Distribution function of the shortest path in networks of queues OR Spectrum 27 2005 123 144 (Pubitemid 40389675)
    • (2005) OR Spectrum , vol.27 , Issue.1 , pp. 123-144
    • Azaron, A.1    Modarres, M.2
  • 3
    • 33845297328 scopus 로고    scopus 로고
    • Modelling complex assemblies as a queueing network for lead time control
    • DOI 10.1016/j.ejor.2005.01.025, PII S0377221705001347
    • A. Azaron, H. Katagiri, K. Kato, and M. Sakawa Modelling complex assemblies as a queueing network for lead time control European Journal of Operational Research 174 2006 150 168 (Pubitemid 44872867)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 150-168
    • Azaron, A.1    Katagiri, H.2    Kato, K.3    Sakawa, M.4
  • 4
    • 33646348135 scopus 로고    scopus 로고
    • A multi-objective lead time control problem in multistage assembly systems using an interactive method
    • DOI 10.1016/j.amc.2005.10.005, PII S0096300305008593
    • A. Azaron, and F. Kianfar A multi-objective lead time control problem in multistage assembly systems using an interactive method Applied Mathematics and Computation 176 2006 609 620 (Pubitemid 43674399)
    • (2006) Applied Mathematics and Computation , vol.176 , Issue.2 , pp. 609-620
    • Azaron, A.1    Kianfar, F.2
  • 5
    • 64949115456 scopus 로고    scopus 로고
    • Due date assignment for multistage assembly systems
    • A. Azaron, and F. Kianfar Due date assignment for multistage assembly systems Optimum Letters 3 2009 199 210
    • (2009) Optimum Letters , vol.3 , pp. 199-210
    • Azaron, A.1    Kianfar, F.2
  • 6
    • 0029632603 scopus 로고
    • A predictive model for the throughput of simple assembly systems
    • K.R. Baker, and S.G. Powell A predictive model for the throughput of simple assembly systems European Journal of Operational Research 81 2 1995 336 345
    • (1995) European Journal of Operational Research , vol.81 , Issue.2 , pp. 336-345
    • Baker, K.R.1    Powell, S.G.2
  • 7
    • 0037296877 scopus 로고    scopus 로고
    • A review on queueing network models with finite capacity queues for software architectures performance prediction
    • S. Balsamo, V. De Nitto Persone, and P. Inverardi A review on queueing network models with finite capacity queues for software architectures performance prediction Performance Evaluation 51 2-4 2003 269 288
    • (2003) Performance Evaluation , vol.51 , Issue.24 , pp. 269-288
    • Balsamo, S.1    De Nitto Persone, V.2    Inverardi, P.3
  • 8
    • 33645640327 scopus 로고    scopus 로고
    • Predicting patient nonappearance for surgery as a scheduling strategy to optimize operating room utilization in a veterans' administration hospital
    • M.D. Basson, T.W. Butler, and H. Verma Predicting patient nonappearance for surgery as a scheduling strategy to optimize operating room utilization in a veterans' administration hospital Anesthesiology 104 4 2006 826 834
    • (2006) Anesthesiology , vol.104 , Issue.4 , pp. 826-834
    • Basson, M.D.1    Butler, T.W.2    Verma, H.3
  • 9
    • 0022768294 scopus 로고
    • Survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 8 1986 909 932 (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 11
    • 0002485077 scopus 로고
    • Finite capacity assembly-like queues
    • U.N. Bhat Finite capacity assembly-like queues Queueing Systems 1 1 1986 85 101
    • (1986) Queueing Systems , vol.1 , Issue.1 , pp. 85-101
    • Bhat, U.N.1
  • 12
    • 12244251452 scopus 로고    scopus 로고
    • A mixed integer programming model for a two line CONWIP-based production and assembly system
    • DOI 10.1016/j.ijpe.2004.01.002, PII S0925527304000106
    • D. Cao, and M. Chen A mixed integer programming model for a two line CONWIP-based production and assembly system International Journal of Production Economics 95 3 2005 317 326 (Pubitemid 40114609)
    • (2005) International Journal of Production Economics , vol.95 , Issue.3 , pp. 317-326
    • Cao, D.1    Chen, M.2
  • 13
    • 0040904922 scopus 로고    scopus 로고
    • Reducing flow time in aircraft manufacturing
    • J.S. Chao, and S.C. Graves Reducing flow time in aircraft manufacturing Production and Operations Management 7 1 1998 38 52 (Pubitemid 128467002)
    • (1998) Production and Operations Management , vol.7 , Issue.1 , pp. 38-52
    • Chao, J.S.1    Graves, S.C.2
  • 15
    • 0032628093 scopus 로고    scopus 로고
    • CONWIP based production lines with multiple bottlenecks, performance and design implications
    • E.M. Dar-El, Y. Herer, and M. Masin CONWIP based production lines with multiple bottlenecks, performance and design implications IIE Transactions 31 2 1999 99 111
    • (1999) IIE Transactions , vol.31 , Issue.2 , pp. 99-111
    • Dar-El, E.M.1    Herer, Y.2    Masin, M.3
  • 16
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliable machines and finite buffer
    • M. Di Mascolo, R. David, and Y. Dallery Modeling and analysis of assembly systems with unreliable machines and finite buffer IIE Transactions 21 4 1991 315 330
    • (1991) IIE Transactions , vol.21 , Issue.4 , pp. 315-330
    • Di Mascolo, M.1    David, R.2    Dallery, Y.3
  • 17
    • 0030407746 scopus 로고    scopus 로고
    • Assembly management in machine tool manufacturing and the PRISMA-Leitstand
    • A. Drexl, and R. Kolisch Assembly management in machine tool manufacturing and the PRISMA-Leitstand Productions and Inventory Management Journal 37 4 1996 55 57 (Pubitemid 126437284)
    • (1996) Production and Inventory Management Journal , vol.37 , Issue.4 , pp. 55-57
    • Drexl, A.1    Kolisch, R.2
  • 18
    • 0006454724 scopus 로고
    • CONWIP assembly with deterministic processing and random outgate
    • I. Duenyas, and W.J. Hopp CONWIP assembly with deterministic processing and random outgate IIE Transactions 24 1992 97 109
    • (1992) IIE Transactions , vol.24 , pp. 97-109
    • Duenyas, I.1    Hopp, W.J.2
  • 19
    • 33746097662 scopus 로고
    • Estimating the throughput of an exponential CONWIP assembly system
    • I. Duenyas, and W.J. Hopp Estimating the throughput of an exponential CONWIP assembly system Queueing Systems 14 1993 35 157
    • (1993) Queueing Systems , vol.14 , pp. 35-157
    • Duenyas, I.1    Hopp, W.J.2
  • 20
    • 0028457112 scopus 로고
    • Estimating the throughput of cyclic assembly system
    • I. Duenyas Estimating the throughput of cyclic assembly system International Journal of Production Research 32 6 1994 1403 1419
    • (1994) International Journal of Production Research , vol.32 , Issue.6 , pp. 1403-1419
    • Duenyas, I.1
  • 22
    • 27644567330 scopus 로고    scopus 로고
    • Dynamic card controlling in a Conwip system
    • DOI 10.1016/j.ijpe.2004.12.010, PII S0925527304004554, Control and Management of Productive Systems
    • J.M. Framinan, P.L. Gonzales, and R. Ruiz-Usano Dynamic card controlling in a Conwip system International Journal of Production Economics 99 1-2 2006 102 116 (Pubitemid 41550214)
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 102-116
    • Framinan, J.M.1    Gonzalez, P.L.2    Ruiz-Usano, R.3
  • 23
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • S. Ghosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems International journal of production research 27 4 1989 637 670
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 24
    • 0033362571 scopus 로고    scopus 로고
    • Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work in process
    • B. Golany, and E. Dar-El Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work in process IIE Transactions 31 8 1999 771 782
    • (1999) IIE Transactions , vol.31 , Issue.8 , pp. 771-782
    • Golany, B.1    Dar-El, E.2
  • 25
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • M.K. Govil, and M.C. Fu Queueing theory in manufacturing: A survey Journal of Manufacturing Systems 18 3 1999 214 240 (Pubitemid 129559002)
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.3 , pp. 214-240
    • Govil, M.K.1    Fu, M.C.2
  • 27
    • 0037395315 scopus 로고    scopus 로고
    • Performance analysis and buffer allocations in some open assembly systems
    • DOI 10.1016/S0305-0548(02)00034-5, PII S0305054802000345
    • N. Hemachandra, and S.K. Eedupuganti Performance analysis and buffer allocations in some open assembly systems Computers & Operations Research 30 5 2003 695 704 (Pubitemid 36175280)
    • (2003) Computers and Operations Research , vol.30 , Issue.5 , pp. 695-704
    • Hemachandra, N.1    Eedupuganti, S.K.2
  • 28
    • 0001632693 scopus 로고
    • Bounds and heuristics for assembly-like queues
    • W.J. Hopp, and J.T. Simon Bounds and heuristics for assembly-like queues Queueing Systems 4 1989 137 156
    • (1989) Queueing Systems , vol.4 , pp. 137-156
    • Hopp, W.J.1    Simon, J.T.2
  • 30
    • 67651196461 scopus 로고    scopus 로고
    • Queueing models for full-flexible multi-class call centers with real-time anticipated delays
    • O. Jouini, Y. Dallery, and Z. Aksin Queueing models for full-flexible multi-class call centers with real-time anticipated delays International Journal of Production Economics 120 2 2009 389 399
    • (2009) International Journal of Production Economics , vol.120 , Issue.2 , pp. 389-399
    • Jouini, O.1    Dallery, Y.2    Aksin, Z.3
  • 31
    • 0022785024 scopus 로고
    • Markov and Markov-regenerative PERT networks
    • V. Kulkarni, and V. Adlakha Markov and Markov-regenerative PERT networks Operations Research 34 1986 769 781
    • (1986) Operations Research , vol.34 , pp. 769-781
    • Kulkarni, V.1    Adlakha, V.2
  • 33
    • 84873676187 scopus 로고    scopus 로고
    • Performance analysis of closed-loop assembly lines with general processing times and finite buffer spaces
    • S. Lagershausen, M. Manitz, and H. Tempelmeier Performance analysis of closed-loop assembly lines with general processing times and finite buffer spaces IIE Transactions 45 5 2013 502 515
    • (2013) IIE Transactions , vol.45 , Issue.5 , pp. 502-515
    • Lagershausen, S.1    Manitz, M.2    Tempelmeier, H.3
  • 34
    • 0001978594 scopus 로고
    • Efficient algorithm solutions to exponential tandem queue with blocking
    • G. Latouche, and M.F. Neuts Efficient algorithm solutions to exponential tandem queue with blocking SIAM Journal on Algebraic and Discrete Methods 1 1 1980 93 106
    • (1980) SIAM Journal on Algebraic and Discrete Methods , vol.1 , Issue.1 , pp. 93-106
    • Latouche, G.1    Neuts, M.F.2
  • 36
    • 0002485078 scopus 로고
    • Assembly-like queues with finite capacity: Bounds, asymptotics and approximations
    • E.H. Lipper, and B. Sengupta Assembly-like queues with finite capacity: Bounds, asymptotics and approximations Queueing Systems 1 1986 67 83
    • (1986) Queueing Systems , vol.1 , pp. 67-83
    • Lipper, E.H.1    Sengupta, B.2
  • 37
    • 0035900867 scopus 로고    scopus 로고
    • Throughput, flow times, and service level in an unreliable assembly system
    • DOI 10.1016/S0377-2217(01)00028-5, PII S0377221701000285
    • L. Liu, and X.M. Yuan Throughput, flow times, and service level in an unreliable assembly system European Journal of Operational Research 135 3 2001 602 615 (Pubitemid 32935206)
    • (2001) European Journal of Operational Research , vol.135 , Issue.3 , pp. 602-615
    • Liu, L.1    Yuan, X.-M.2
  • 38
    • 0025414457 scopus 로고
    • Approximate models of assembly systems with finite inventory banks
    • X.G. Liu, and J.A. Buzacott Approximate models of assembly systems with finite inventory banks European Journal of Operational Research 45 2-3 1990 143 154
    • (1990) European Journal of Operational Research , vol.45 , Issue.23 , pp. 143-154
    • Liu, X.G.1    Buzacott, J.A.2
  • 39
    • 36849069882 scopus 로고    scopus 로고
    • Queueing-model based analysis of assembly lines with finite buffers and general service times
    • DOI 10.1016/j.cor.2006.12.016, PII S0305054806003054
    • M. Manitz Queueing-model based analysis of assembly lines with finite buffers and general service times Computers & Operations Research 35 8 2008 2520 2536 (Pubitemid 350235133)
    • (2008) Computers and Operations Research , vol.35 , Issue.8 , pp. 2520-2536
    • Manitz, M.1
  • 40
    • 84855251301 scopus 로고    scopus 로고
    • The variance of inter-departure times of the output of an assembly line with finite buffers, converging flow of material, and general service times
    • M. Manitz, and H. Tempelmeier The variance of inter-departure times of the output of an assembly line with finite buffers, converging flow of material, and general service times OR spectrum 34 1 2012 273 291
    • (2012) OR Spectrum , vol.34 , Issue.1 , pp. 273-291
    • Manitz, M.1    Tempelmeier, H.2
  • 42
    • 58849137096 scopus 로고    scopus 로고
    • An analytic finite capacity queueing network model capturing the propagation of congestion and blocking
    • C. Osorio, and M. Bierlaire An analytic finite capacity queueing network model capturing the propagation of congestion and blocking European Journal of Operational Research 196 3 2009 996 1007
    • (2009) European Journal of Operational Research , vol.196 , Issue.3 , pp. 996-1007
    • Osorio, C.1    Bierlaire, M.2
  • 43
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • DOI 10.1016/0377-2217(95)00378-9
    • H.T. Papadopoulos, and C. Heavey Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines European Journal of Operational Research 92 1 1996 1 27 (Pubitemid 126372211)
    • (1996) European Journal of Operational Research , vol.92 , Issue.1 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 44
    • 84877920865 scopus 로고    scopus 로고
    • Performance evaluation of a multi-product CONWIP assembly system with correlated external demands
    • C.W. Park, and H.S. Lee Performance evaluation of a multi-product CONWIP assembly system with correlated external demands International Journal of Production Economics 144 1 2013 334 344
    • (2013) International Journal of Production Economics , vol.144 , Issue.1 , pp. 334-344
    • Park, C.W.1    Lee, H.S.2
  • 45
    • 33846337097 scopus 로고    scopus 로고
    • A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
    • DOI 10.1016/j.ejor.2006.04.024, PII S0377221706002724
    • C. Perkgoz, A. Azaron, H. Katagiri, K. Kato, and M. Sakawa A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms European Journal of Operational Research 180 2007 292 308 (Pubitemid 46127822)
    • (2007) European Journal of Operational Research , vol.180 , Issue.1 , pp. 292-308
    • Perkgoz, C.1    Azaron, A.2    Katagiri, H.3    Kato, K.4    Sakawa, M.5
  • 47
    • 84887094655 scopus 로고    scopus 로고
    • Dynamic control card in a production system controlled by CONWIP approach
    • P. Renna Dynamic control card in a production system controlled by CONWIP approach Jordan Journal of Mechanical and Industrial Engineering 4 4 2010 425 432
    • (2010) Jordan Journal of Mechanical and Industrial Engineering , vol.4 , Issue.4 , pp. 425-432
    • Renna, P.1
  • 49
    • 67651157034 scopus 로고    scopus 로고
    • Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer
    • B. Tan, and S.B. Gershwin Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer International Journal of Production Economics 120 2 2009 327 339
    • (2009) International Journal of Production Economics , vol.120 , Issue.2 , pp. 327-339
    • Tan, B.1    Gershwin, S.B.2
  • 52
    • 84920725400 scopus 로고    scopus 로고
    • Due date assignment for multi-server multi-stage assembly systems
    • 10.1080/00207721.2013.815826
    • S. Yaghoubi Due date assignment for multi-server multi-stage assembly systems International Journal of System Science 2013 10.1080/00207721.2013. 815826
    • (2013) International Journal of System Science
    • Yaghoubi, S.1
  • 53
    • 7444243269 scopus 로고    scopus 로고
    • Performance analysis of assembly systems with unreliable machines and finite buffers
    • X.M. Yuan, and L. Liu Performance analysis of assembly systems with unreliable machines and finite buffers European Journal of Operational Research 161 3 2005 854 871
    • (2005) European Journal of Operational Research , vol.161 , Issue.3 , pp. 854-871
    • Yuan, X.M.1    Liu, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.