메뉴 건너뛰기




Volumn 61, Issue 1-4, 2012, Pages 351-368

Lead time control in multi-server multi-stage assembly system

Author keywords

Assembly system; Markov processes; Multiple objective programming; Reactive controlling

Indexed keywords

ALLOCATION PROBLEMS; ARC LENGTH; ASSEMBLY SYSTEMS; CONTINUOUS TIME; ERLANG DISTRIBUTION; EXPONENTIAL DISTRIBUTIONS; FINITE-STATE; GOAL ATTAINMENT; LEAD-TIME DISTRIBUTIONS; LEADTIME; MARKOV MODEL; MULTI-OBJECTIVE PROBLEM; MULTI-SERVER; MULTI-STAGE; MULTIOBJECTIVE MODELS; MULTIPLE OBJECTIVE PROGRAMMING; MULTISERVERS; NETWORK-BASED; NEW PRODUCT; POISSON PROCESS; PROCESSING TIME; PRODUCTION SYSTEM; REACTIVE CONTROLLING; SERVICE RATES; STEADY STATE; STOCHASTIC NETWORKS; TRANSPORT TIME;

EID: 84862543317     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3692-9     Document Type: Article
Times cited : (8)

References (47)
  • 1
    • 0040904922 scopus 로고    scopus 로고
    • Reducing flow time in aircraft manufacturing
    • JS Chao SC Graves 1998 Reducing flow time in aircraft manufacturing Prod Oper Manag 7 1 38 52 10.1111/j.1937-5956.1998.tb00437.x (Pubitemid 128467002)
    • (1998) Production and Operations Management , vol.7 , Issue.1 , pp. 38-52
    • Chao, J.S.1    Graves, S.C.2
  • 3
    • 0030407746 scopus 로고    scopus 로고
    • Assembly management in machine tool manufacturing and the PRISMA-Leitstand
    • A Drexl R Kolisch 1996 Assembly management in machine tool manufacturing and the PRISMA-Leitstand Prod Invent Manag J 37 4 55 57 (Pubitemid 126437284)
    • (1996) Production and Inventory Management Journal , vol.37 , Issue.4 , pp. 55-57
    • Drexl, A.1    Kolisch, R.2
  • 5
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • DOI 10.1016/0377-2217(95)00378-9
    • HT Papadopoulos C Heavey 1996 Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines Eur J Oper Res 92 1 1 27 0912.90159 10.1016/0377-2217(95)00378-9 (Pubitemid 126372211)
    • (1996) European Journal of Operational Research , vol.92 , Issue.1 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 6
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • MK Govil MC Fu 1999 Queueing theory in manufacturing: a survey J Manuf Syst 18 3 214 240 10.1016/S0278-6125(99)80033-8 (Pubitemid 129559002)
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.3 , pp. 214-240
    • Govil, M.K.1    Fu, M.C.2
  • 8
    • 0000102664 scopus 로고
    • Assembly-like queues
    • 0272.60061 10.2307/3212352
    • JM Harrison 1973 Assembly-like queues J Appl Probab 10 354 367 0272.60061 10.2307/3212352
    • (1973) J Appl Probab , vol.10 , pp. 354-367
    • Harrison, J.M.1
  • 9
    • 0001978594 scopus 로고
    • Efficient algorithm solutions to exponential tandem queue with blocking
    • 563019 0498.60088 10.1137/0601013
    • G Latouche MF Neuts 1980 Efficient algorithm solutions to exponential tandem queue with blocking SIAM J Algebra Disc Method 1 1 93 106 563019 0498.60088 10.1137/0601013
    • (1980) SIAM J Algebra Disc Method , vol.1 , Issue.1 , pp. 93-106
    • Latouche, G.1    Neuts, M.F.2
  • 10
    • 0002485077 scopus 로고
    • Finite capacity assembly-like queues
    • 896239 0651.90030 10.1007/BF01149329
    • UN Bhat 1986 Finite capacity assembly-like queues Queueing Syst 1 1 85 101 896239 0651.90030 10.1007/BF01149329
    • (1986) Queueing Syst , vol.1 , Issue.1 , pp. 85-101
    • Bhat, U.N.1
  • 11
    • 0002485078 scopus 로고
    • Assembly-like queues with finite capacity: Bounds, asymptotics and approximations
    • 896238 0649.90060 10.1007/BF01149328
    • EH Lipper B Sengupta 1986 Assembly-like queues with finite capacity: bounds, asymptotics and approximations Queueing Syst 1 67 83 896238 0649.90060 10.1007/BF01149328
    • (1986) Queueing Syst , vol.1 , pp. 67-83
    • Lipper, E.H.1    Sengupta, B.2
  • 12
    • 0001632693 scopus 로고
    • Bounds and heuristics for assembly-like queues
    • 1009751 0673.90036 10.1007/BF01158549
    • WJ Hopp JT Simon 1989 Bounds and heuristics for assembly-like queues Queueing Syst 4 137 156 1009751 0673.90036 10.1007/BF01158549
    • (1989) Queueing Syst , vol.4 , pp. 137-156
    • Hopp, W.J.1    Simon, J.T.2
  • 13
    • 0023558979 scopus 로고
    • Stochastic lead-time in two-level assembly systems
    • 10.1080/07408178708975409
    • CA Yano 1987 Stochastic lead-time in two-level assembly systems IIE Trans 19 371 378 10.1080/07408178708975409
    • (1987) IIE Trans , vol.19 , pp. 371-378
    • Yano, C.A.1
  • 14
    • 0025414457 scopus 로고
    • Approximate models of assembly systems with finite inventory banks
    • 0707.90040 10.1016/0377-2217(90)90181-A
    • XG Liu JA Buzacott 1990 Approximate models of assembly systems with finite inventory banks Eur J Oper Res 45 2-3 143 154 0707.90040 10.1016/0377-2217(90)90181-A
    • (1990) Eur J Oper Res , vol.45 , Issue.23 , pp. 143-154
    • Liu, X.G.1    Buzacott, J.A.2
  • 15
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliable machines and finite buffer
    • 10.1080/07408179108963866
    • M Di Mascolo R David Y Dallery 1991 Modeling and analysis of assembly systems with unreliable machines and finite buffer IIE Trans 21 4 315 330 10.1080/07408179108963866
    • (1991) IIE Trans , vol.21 , Issue.4 , pp. 315-330
    • Di Mascolo, M.1    David, R.2    Dallery, Y.3
  • 16
    • 0035900867 scopus 로고    scopus 로고
    • Throughput, flow times, and service level in an unreliable assembly system
    • DOI 10.1016/S0377-2217(01)00028-5, PII S0377221701000285
    • L Liu XM Yuan 2001 Throughput, flow times, and service level in an unreliable assembly system Eur J Oper Res 135 3 602 615 0989.90016 10.1016/S0377-2217(01)00028-5 (Pubitemid 32935206)
    • (2001) European Journal of Operational Research , vol.135 , Issue.3 , pp. 602-615
    • Liu, L.1    Yuan, X.-M.2
  • 17
    • 7444243269 scopus 로고    scopus 로고
    • Performance analysis of assembly systems with unreliable machines and finite buffers
    • 2099238 1071.90523 10.1016/j.ejor.2003.09.011
    • XM Yuan L Liu 2005 Performance analysis of assembly systems with unreliable machines and finite buffers Eur J Oper Res 161 3 854 871 2099238 1071.90523 10.1016/j.ejor.2003.09.011
    • (2005) Eur J Oper Res , vol.161 , Issue.3 , pp. 854-871
    • Yuan, X.M.1    Liu, L.2
  • 18
    • 0037061532 scopus 로고    scopus 로고
    • Product due date assignment for complex assemblies
    • DOI 10.1016/S0925-5273(01)00170-0, PII S0925527301001700
    • DP Song C Hicks CF Earl 2002 Product due date assignment for complex assemblies Int J Prod Econ 76 243 256 10.1016/S0925-5273(01)00170-0 (Pubitemid 34249507)
    • (2002) International Journal of Production Economics , vol.76 , Issue.3 , pp. 243-256
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 19
    • 0037395315 scopus 로고    scopus 로고
    • Performance analysis and buffer allocations in some open assembly systems
    • DOI 10.1016/S0305-0548(02)00034-5, PII S0305054802000345
    • N Hemachandra SK Eedupuganti 2003 Performance analysis and buffer allocations in some open assembly systems Comput Oper Res 30 5 695 704 1035.90021 10.1016/S0305-0548(02)00034-5 (Pubitemid 36175280)
    • (2003) Computers and Operations Research , vol.30 , Issue.5 , pp. 695-704
    • Hemachandra, N.1    Eedupuganti, S.K.2
  • 20
    • 2942670639 scopus 로고    scopus 로고
    • Integrating resource and production decisions in a simple multi-stage assembly system
    • 10.1016/j.ijpe.2003.09.010
    • N Dellaert TD Kok 2004 Integrating resource and production decisions in a simple multi-stage assembly system Int J Prod Econ 90 3 281 294 10.1016/j.ijpe.2003.09.010
    • (2004) Int J Prod Econ , vol.90 , Issue.3 , pp. 281-294
    • Dellaert, N.1    Kok, T.D.2
  • 21
    • 36849069882 scopus 로고    scopus 로고
    • Queueing-model based analysis of assembly lines with finite buffers and general service times
    • DOI 10.1016/j.cor.2006.12.016, PII S0305054806003054
    • M Manitz 2008 Queueing-model based analysis of assembly lines with finite buffers and general service times Comput Oper Res 35 8 2520 2536 2586382 1170.90365 10.1016/j.cor.2006.12.016 (Pubitemid 350235133)
    • (2008) Computers and Operations Research , vol.35 , Issue.8 , pp. 2520-2536
    • Manitz, M.1
  • 22
    • 55649094898 scopus 로고    scopus 로고
    • Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach
    • 10.1007/s00170-007-1267-6
    • B Javadi A Rahimi-Vahed M Rabbani M Dangchi 2007 Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach Int J Adv Manuf Technol 39 975 982 10.1007/s00170-007-1267- 6
    • (2007) Int J Adv Manuf Technol , vol.39 , pp. 975-982
    • Javadi, B.1    Rahimi-Vahed, A.2    Rabbani, M.3    Dangchi, M.4
  • 23
    • 69249208467 scopus 로고    scopus 로고
    • Design of the optimal feeding policy in an assembly system
    • 10.1016/j.ijpe.2009.05.016
    • D Battini M Faccio A Persona F Sgarbossa 2009 Design of the optimal feeding policy in an assembly system Int J Prod Econ 121 1 233 254 10.1016/j.ijpe.2009.05.016
    • (2009) Int J Prod Econ , vol.121 , Issue.1 , pp. 233-254
    • Battini, D.1    Faccio, M.2    Persona, A.3    Sgarbossa, F.4
  • 24
    • 77951295681 scopus 로고    scopus 로고
    • Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
    • 2638900 1188.90009 10.1016/j.cor.2009.06.002
    • F Hnaien X Delorme A Dolgui 2010 Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times Comput Oper Res 37 11 1835 1843 2638900 1188.90009 10.1016/j.cor.2009.06.002
    • (2010) Comput Oper Res , vol.37 , Issue.11 , pp. 1835-1843
    • Hnaien, F.1    Delorme, X.2    Dolgui, A.3
  • 25
    • 0023981191 scopus 로고
    • On server allocation in multiple center manufacturing systems
    • 948375 0645.90034 10.1287/opre.36.2.333
    • JG Shanthikumar DD Yao 1988 On server allocation in multiple center manufacturing systems Oper Res 36 2 333 342 948375 0645.90034 10.1287/opre.36.2.333
    • (1988) Oper Res , vol.36 , Issue.2 , pp. 333-342
    • Shanthikumar, J.G.1    Yao, D.D.2
  • 26
    • 0023411524 scopus 로고
    • Optimal server allocation in a system of multi-server stations
    • 909843 0636.90034 10.1287/mnsc.33.9.1173
    • JG Shanthikumar DD Yao 1987 Optimal server allocation in a system of multi-server stations Manag Sci 33 9 1173 1180 909843 0636.90034 10.1287/mnsc.33.9.1173
    • (1987) Manag Sci , vol.33 , Issue.9 , pp. 1173-1180
    • Shanthikumar, J.G.1    Yao, D.D.2
  • 27
    • 0002261349 scopus 로고
    • Machine allocation algorithms for jobshop manufacturing
    • 10.1007/BF01471221
    • VM Van Vliet AHG Rinnooy Kan 1991 Machine allocation algorithms for jobshop manufacturing J Intell Manuf 2 2 83 94 10.1007/BF01471221
    • (1991) J Intell Manuf , vol.2 , Issue.2 , pp. 83-94
    • Van Vliet, V.M.1    Rinnooy Kan, A.H.G.2
  • 28
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach
    • 10.1016/j.rcim.2003.09.001
    • R Swarnkar MK Tiwari 2004 Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach Robot Comput Integr Manuf 20 3 199 209 10.1016/j.rcim.2003.09.001
    • (2004) Robot Comput Integr Manuf , vol.20 , Issue.3 , pp. 199-209
    • Swarnkar, R.1    Tiwari, M.K.2
  • 29
    • 33744831752 scopus 로고    scopus 로고
    • Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks
    • DOI 10.1016/j.cie.2006.02.002, PII S0360835206000131
    • MB Yildirim T Cakar U Doguc JC Meza 2006 Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks Comput Ind Eng 50 1-2 185 194 10.1016/j.cie.2006.02.002 (Pubitemid 43833336)
    • (2006) Computers and Industrial Engineering , vol.50 , Issue.1-2 , pp. 185-194
    • Yildirim, M.B.1    Cakar, T.2    Doguc, U.3    Meza, J.C.4
  • 30
    • 33845297328 scopus 로고    scopus 로고
    • Modelling complex assemblies as a queueing network for lead time control
    • DOI 10.1016/j.ejor.2005.01.025, PII S0377221705001347
    • A Azaron H Katagiri K Kato M Sakawa 2006 Modelling complex assemblies as a queueing network for lead time control Eur J Oper Res 174 150 168 2245930 1116.90042 10.1016/j.ejor.2005.01.025 (Pubitemid 44872867)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 150-168
    • Azaron, A.1    Katagiri, H.2    Kato, K.3    Sakawa, M.4
  • 31
    • 33646348135 scopus 로고    scopus 로고
    • A multi-objective lead time control problem in multistage assembly systems using an interactive method
    • DOI 10.1016/j.amc.2005.10.005, PII S0096300305008593
    • A Azaron F Kianfar 2006 A multi-objective lead time control problem in multistage assembly systems using an interactive method Appl Math Comput 176 609 620 2232052 1093.65067 10.1016/j.amc.2005.10.005 (Pubitemid 43674399)
    • (2006) Applied Mathematics and Computation , vol.176 , Issue.2 , pp. 609-620
    • Azaron, A.1    Kianfar, F.2
  • 32
    • 33846337097 scopus 로고    scopus 로고
    • A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
    • DOI 10.1016/j.ejor.2006.04.024, PII S0377221706002724
    • C Perkgoz A Azaron H Katagiri K Kato M Sakawa 2007 A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms Eur J Oper Res 180 292 308 1114.90334 10.1016/j.ejor.2006.04.024 (Pubitemid 46127822)
    • (2007) European Journal of Operational Research , vol.180 , Issue.1 , pp. 292-308
    • Perkgoz, C.1    Azaron, A.2    Katagiri, H.3    Kato, K.4    Sakawa, M.5
  • 33
    • 0022785024 scopus 로고
    • Markov and Markov-regenerative PERT networks
    • 884303 0615.90042 10.1287/opre.34.5.769
    • V Kulkarni V Adlakha 1986 Markov and Markov-regenerative PERT networks Oper Res 34 769 781 884303 0615.90042 10.1287/opre.34.5.769
    • (1986) Oper Res , vol.34 , pp. 769-781
    • Kulkarni, V.1    Adlakha, V.2
  • 34
    • 64949115456 scopus 로고    scopus 로고
    • Due date assignment for multistage assembly systems
    • 1179.90073 10.1007/s11590-008-0101-x
    • A Azaron F Kianfar 2009 Due date assignment for multistage assembly systems Optim Lett 3 199 210 1179.90073 10.1007/s11590-008-0101-x
    • (2009) Optim Lett , vol.3 , pp. 199-210
    • Azaron, A.1    Kianfar, F.2
  • 35
    • 0002646899 scopus 로고
    • Knowledge-based reactive scheduling
    • 10.1080/09537289408919480
    • E Szelke RM Kerr 1994 Knowledge-based reactive scheduling Prod Plan Con 5 2 124 145 10.1080/09537289408919480
    • (1994) Prod Plan Con , vol.5 , Issue.2 , pp. 124-145
    • Szelke, E.1    Kerr, R.M.2
  • 36
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • 0976.90045 10.1016/S0377-2217(99)00311-2
    • I Sabuncuoglu M Bayiz 2000 Analysis of reactive scheduling problems in a job shop environment Eur J Oper Res 126 567 586 0976.90045 10.1016/S0377- 2217(99)00311-2
    • (2000) Eur J Oper Res , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 37
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • 1999989 1154.90500 10.1023/A:1022235519958
    • GE Vieira JW Herrmann E Lin 2003 Rescheduling manufacturing systems: a framework of strategies, policies and methods J Sched 6 39 62 1999989 1154.90500 10.1023/A:1022235519958
    • (2003) J Sched , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 38
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • 2095874 1115.90025 10.1016/j.ejor.2003.08.027
    • H Aytug MA Lawley K McKay S Mohan R Uzsoy 2005 Executing production schedules in the face of uncertainties: a review and some future directions Eur J Oper Res 161 1 86 110 2095874 1115.90025 10.1016/j.ejor.2003.08.027
    • (2005) Eur J Oper Res , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 39
    • 0003347730 scopus 로고
    • Reactive scheduling systems
    • D.E. Brown W.T. Scherer (eds). Kluwer Boston
    • Smith SS (1994) Reactive scheduling systems. In: Brown DE, Scherer WT (eds) Intelligent scheduling systems. Kluwer, Boston
    • (1994) Intelligent Scheduling Systems
    • Smith, S.S.1
  • 40
    • 0034288713 scopus 로고    scopus 로고
    • Probe backtrack search for minimal perturbation in dynamic scheduling
    • 1785790 0970.68014 10.1023/A:1009856210543
    • H El Sakkout M Wallace 2000 Probe backtrack search for minimal perturbation in dynamic scheduling Constraints 5 4 359 388 1785790 0970.68014 10.1023/A:1009856210543
    • (2000) Constraints , vol.5 , Issue.4 , pp. 359-388
    • El Sakkout, H.1    Wallace, M.2
  • 41
    • 0036273802 scopus 로고    scopus 로고
    • Planning and re-planning in project and production planning
    • 10.1016/S0305-0483(02)00024-5
    • KM Calhoun RF Deckro JT Moore JW Chrissis JC Van Hove 2002 Planning and re-planning in project and production planning Omega 30 155 170 10.1016/S0305-0483(02)00024-5
    • (2002) Omega , vol.30 , pp. 155-170
    • Calhoun, K.M.1    Deckro, R.F.2    Moore, J.T.3    Chrissis, J.W.4    Van Hove, J.C.5
  • 42
    • 0037563233 scopus 로고    scopus 로고
    • Rescheduling of identical parallel machines under machine eligibility constraints
    • 1033.90031 10.1016/S0377-2217(02)00499-X
    • O Alagöz M Azizoglu 2003 Rescheduling of identical parallel machines under machine eligibility constraints Eur J Oper Res 149 523 532 1033.90031 10.1016/S0377-2217(02)00499-X
    • (2003) Eur J Oper Res , vol.149 , pp. 523-532
    • Alagöz, O.1    Azizoglu, M.2
  • 43
    • 15244342527 scopus 로고    scopus 로고
    • Distribution function of the shortest path in networks of queues
    • DOI 10.1007/s00291-004-0169-3
    • A Azaron M Modarres 2005 Distribution function of the shortest path in networks of queues OR Spectr 27 123 144 2105291 1176.90113 10.1007/s00291-004- 0169-3 (Pubitemid 40389675)
    • (2005) OR Spectrum , vol.27 , Issue.1 , pp. 123-144
    • Azaron, A.1    Modarres, M.2
  • 46
    • 51249183832 scopus 로고
    • ρ /(1-ρ)
    • 448625 0426.60091 10.1007/BF02532775
    • ρ /(1-ρ) Ann Inst Stat Math 29 67 127 448625 0426.60091 10.1007/BF02532775
    • (1977) Ann Inst Stat Math , vol.29 , pp. 67-127
    • Sakasegawa, H.1
  • 47
    • 0019560371 scopus 로고
    • Heavy-traffic limits for queues with many exponential servers
    • S Halfin W Whitt 1981 Heavy-traffic limits for queues with many exponential servers Oper Res 29 567 588 629195 0455.60079 10.1287/opre.29.3.567 (Pubitemid 12437583)
    • (1981) Operations Research , vol.29 , Issue.3 , pp. 567-588
    • Halfin Shlomo1    Whitt Ward2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.