메뉴 건너뛰기




Volumn 144, Issue 1, 2013, Pages 334-344

Performance evaluation of a multi-product CONWIP assembly system with correlated external demands

Author keywords

CONWIP system; Multi product production system; Performance analysis; Product form approximation method; Queueing network

Indexed keywords

APPROXIMATION METHODS; APPROXIMATION TECHNIQUES; CONWIP SYSTEM; DECOMPOSITION METHODS; INDIVIDUAL COMPONENTS; MATRIX GEOMETRIC METHODS; MULTI-PRODUCT PRODUCTION SYSTEM; PERFORMANCE ANALYSIS;

EID: 84877920865     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2013.02.021     Document Type: Article
Times cited : (28)

References (53)
  • 1
    • 67651146397 scopus 로고    scopus 로고
    • Defining inventory control points in multiproduct stochastic pull systems
    • R.G. Askin, and S. Krishnan Defining inventory control points in multiproduct stochastic pull systems International Journal of Production Economics 120 2 2009 418 429
    • (2009) International Journal of Production Economics , vol.120 , Issue.2 , pp. 418-429
    • Askin, R.G.1    Krishnan, S.2
  • 2
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • R.G. Askin, M.G. Mitwasi, and J.B. Goldberg Determining the number of kanbans in multi-item just-in-time systems IIE Transactions 25 1 1993 89 98
    • (1993) IIE Transactions , vol.25 , Issue.1 , pp. 89-98
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.B.3
  • 3
    • 0015681907 scopus 로고
    • Approximate queueing models for multiprogramming computer systems
    • B. Avi-Itzhak, and D.P. Heyman Approximate queueing models for multiprogramming computer systems Operations Research 21 6 1973 1212 1230
    • (1973) Operations Research , vol.21 , Issue.6 , pp. 1212-1230
    • Avi-Itzhak, B.1    Heyman, D.P.2
  • 4
    • 0032735676 scopus 로고    scopus 로고
    • An approximation for computing the throughput of closed assembly-type queueing networks
    • H. Ayhan, and M.A. Wortman An approximation for computing the throughput of closed assembly-type queueing networks European Journal of Operational Research 112 1 1999 107 121
    • (1999) European Journal of Operational Research , vol.112 , Issue.1 , pp. 107-121
    • Ayhan, H.1    Wortman, M.A.2
  • 5
    • 0016495143 scopus 로고
    • Open, closed and mixed networks of queues with different classes of customers
    • F. Baskett, K.M. Chandy, R.R. Muntz, and F.G. Palacios Open, closed and mixed networks of queues with different classes of customers Journal of the ACM 22 2 1975 248 260
    • (1975) Journal of the ACM , vol.22 , Issue.2 , pp. 248-260
    • Baskett, F.1    Chandy, K.M.2    Muntz, R.R.3    Palacios, F.G.4
  • 7
    • 0000204846 scopus 로고
    • A unified view of product-form approximation techniques for general closed queueing networks
    • B. Baynat, and Y. Dallery A unified view of product-form approximation techniques for general closed queueing networks Performance Evaluation 18 3 1993 205 224
    • (1993) Performance Evaluation , vol.18 , Issue.3 , pp. 205-224
    • Baynat, B.1    Dallery, Y.2
  • 8
    • 0001693793 scopus 로고    scopus 로고
    • A product-form approximation method for general closed queueing networks with several classes of customers
    • B. Baynat, and Y. Dallery A product-form approximation method for general closed queueing networks with several classes of customers Performance Evaluation 24 3 1996 165 188
    • (1996) Performance Evaluation , vol.24 , Issue.3 , pp. 165-188
    • Baynat, B.1    Dallery, Y.2
  • 9
    • 34748842011 scopus 로고    scopus 로고
    • Event-based receding horizon control for two-stage multi-product production plants
    • F. Borrelli, P. Falcone, and C. Del Vecchio Event-based receding horizon control for two-stage multi-product production plants Control Engineering Practice 15 12 2007 l556 1568
    • (2007) Control Engineering Practice , vol.15 , Issue.12 , pp. 556-1568
    • Borrelli, F.1    Falcone, P.2    Del Vecchio, C.3
  • 10
    • 0022113307 scopus 로고
    • Equivalence and decomposition in queuing systems-A unified approach
    • A. Brandwajn Equivalence and decomposition in queuing systems-a unified approach Performance Evaluation 5 3 1985 175 186
    • (1985) Performance Evaluation , vol.5 , Issue.3 , pp. 175-186
    • Brandwajn, A.1
  • 11
    • 0023533125 scopus 로고
    • Matrix-geometric and recursive algorithm solution of a two-stage unreliable flow line
    • J.A. Buzacott, and D. Kostelski Matrix-geometric and recursive algorithm solution of a two-stage unreliable flow line IIE Transactions 19 4 1987 429 438
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 429-438
    • Buzacott, J.A.1    Kostelski, D.2
  • 12
    • 84987012950 scopus 로고
    • A general approach for coordinating multiple cell manufacturing system
    • J.A. Buzacott, and J.G. Shanthikumar A general approach for coordinating multiple cell manufacturing system Production and Operations Management 1 1 1992 34 52
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 34-52
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 13
    • 12244251452 scopus 로고    scopus 로고
    • A mixed integer programming model for a two line CONWIP-based production and assembly system
    • D. Cao, and M. Chen A mixed integer programming model for a two line CONWIP-based production and assembly system International Journal of Production Economics 95 3 2005 317 326
    • (2005) International Journal of Production Economics , vol.95 , Issue.3 , pp. 317-326
    • Cao, D.1    Chen, M.2
  • 14
    • 38249017403 scopus 로고
    • Approximate analysis of general open queueing networks with restricted capacity
    • Y. Dallery Approximate analysis of general open queueing networks with restricted capacity Performance Evaluation 11 3 1990 209 222
    • (1990) Performance Evaluation , vol.11 , Issue.3 , pp. 209-222
    • Dallery, Y.1
  • 15
    • 38749138179 scopus 로고    scopus 로고
    • Performance evaluation of a single-stage two-product manufacturing system operating under pull-type control
    • A. Dasci, and M. Karakul Performance evaluation of a single-stage two-product manufacturing system operating under pull-type control Computers & Operations Research 35 9 2008 2861 2876
    • (2008) Computers & Operations Research , vol.35 , Issue.9 , pp. 2861-2876
    • Dasci, A.1    Karakul, M.2
  • 17
    • 0030086877 scopus 로고    scopus 로고
    • Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands
    • M. Di Mascolo Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands European Journal of Operational Research 89 1 1996 147 163
    • (1996) European Journal of Operational Research , vol.89 , Issue.1 , pp. 147-163
    • Di Mascolo, M.1
  • 18
    • 0029774986 scopus 로고    scopus 로고
    • An analytical method for performance evaluation of kanban controlled production systems
    • M. Di Mascolo, Y. Frein, and Y. Dallery An analytical method for performance evaluation of kanban controlled production systems Operations Research 44 1 1996 50 64
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 50-64
    • Di Mascolo, M.1    Frein, Y.2    Dallery, Y.3
  • 19
    • 0028457112 scopus 로고
    • Estimating the throughput of acyclic assembly system
    • I. Duenyas Estimating the throughput of acyclic assembly system International Journal of Production Research 32 6 1994 1403 1419
    • (1994) International Journal of Production Research , vol.32 , Issue.6 , pp. 1403-1419
    • Duenyas, I.1
  • 20
    • 0001242198 scopus 로고
    • Estimating variance of output from cyclic exponential queueing systems
    • I. Duenyas, and W.J. Hopp Estimating variance of output from cyclic exponential queueing systems Queueing Systems 7 3 1990 337 354
    • (1990) Queueing Systems , vol.7 , Issue.3 , pp. 337-354
    • Duenyas, I.1    Hopp, W.J.2
  • 21
    • 0006454724 scopus 로고
    • CONWIP assembly with deterministic processing and random outages
    • I. Duenyas, and W.J. Hopp CONWIP assembly with deterministic processing and random outages IIE Transactions 24 4 1992 97 109
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 97-109
    • Duenyas, I.1    Hopp, W.J.2
  • 22
    • 33746097662 scopus 로고
    • Estimating the throughput of an exponential CONWIP assembly system
    • I. Duenyas, and W.J. Hopp Estimating the throughput of an exponential CONWIP assembly system Queueing Systems 14 1-2 1993 135 157
    • (1993) Queueing Systems , vol.14 , Issue.12 , pp. 135-157
    • Duenyas, I.1    Hopp, W.J.2
  • 23
    • 0027647549 scopus 로고
    • Characterizing the output process of a CONWIP line with deterministic processing and random outages
    • I. Duenyas, W.J. Hopp, and M.L. Spearman Characterizing the output process of a CONWIP line with deterministic processing and random outages Management Science 39 8 1993 975 988
    • (1993) Management Science , vol.39 , Issue.8 , pp. 975-988
    • Duenyas, I.1    Hopp, W.J.2    Spearman, M.L.3
  • 25
    • 0033874529 scopus 로고    scopus 로고
    • Performance evaluation and design of a CONWIP system with inspections
    • C. Duri, Y. Frein, and H.S. Lee Performance evaluation and design of a CONWIP system with inspections International Journal of Production Economics 64 1-3 2000 219 229
    • (2000) International Journal of Production Economics , vol.64 , Issue.13 , pp. 219-229
    • Duri, C.1    Frein, Y.2    Lee, H.S.3
  • 27
    • 3242726703 scopus 로고    scopus 로고
    • A comparison of hybrid push/pull and CONWIP/pull production inventory control policies
    • J. Geraghty, and C. Heavey A comparison of hybrid push/pull and CONWIP/pull production inventory control policies International Journal of Production Economics 91 1 2004 75 90
    • (2004) International Journal of Production Economics , vol.91 , Issue.1 , pp. 75-90
    • Geraghty, J.1    Heavey, C.2
  • 28
    • 0001167316 scopus 로고
    • Closed queueing networks with exponential servers
    • W.J. Gorden, and G.F. Newell Closed queueing networks with exponential servers Operations Research 15 2 1967 254 262
    • (1967) Operations Research , vol.15 , Issue.2 , pp. 254-262
    • Gorden, W.J.1    Newell, G.F.2
  • 29
    • 38049087093 scopus 로고    scopus 로고
    • Decentralized multi-product multi-stage systems with backorders
    • C. Gurgur, and T. Altiok Decentralized multi-product multi-stage systems with backorders IIE Transactions 40 3 2008 238 251
    • (2008) IIE Transactions , vol.40 , Issue.3 , pp. 238-251
    • Gurgur, C.1    Altiok, T.2
  • 30
    • 34247473133 scopus 로고    scopus 로고
    • Analysis of decentralized multi-product pull systems with lost Sales
    • C.Z Gurgur, and T. Altiok Analysis of decentralized multi-product pull systems with lost Sales Naval Research Logistics 54 4 2007 357 370
    • (2007) Naval Research Logistics , vol.54 , Issue.4 , pp. 357-370
    • Gurgur, C.Z.1    Altiok, T.2
  • 31
    • 0030194194 scopus 로고    scopus 로고
    • Performance evaluation of closed tree-structured assembly systems
    • J. Hazra, and A. Seidmann Performance evaluation of closed tree-structured assembly systems IIE Transactions 28 7 1996 591 599
    • (1996) IIE Transactions , vol.28 , Issue.7 , pp. 591-599
    • Hazra, J.1    Seidmann, A.2
  • 33
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline. multistage production system
    • P.Y. Huang, L.P Rees, and B.W. Taylor A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline. multistage production system Decision Sciences 14 3 1983 326 344
    • (1983) Decision Sciences , vol.14 , Issue.3 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 35
    • 4043118254 scopus 로고    scopus 로고
    • A general decomposition algorithm for parallel queues with correlated arrivals
    • S.M.R. Iravani, K.L. Luangkesorn, and D. Simchi-Levi A general decomposition algorithm for parallel queues with correlated arrivals Queueing System 47 4 2004 313 344
    • (2004) Queueing System , vol.47 , Issue.4 , pp. 313-344
    • Iravani, S.M.R.1    Luangkesorn, K.L.2    Simchi-Levi, D.3
  • 36
    • 0030205674 scopus 로고    scopus 로고
    • A comparison of fixed and adaptive type controls for multi-product processing
    • P. Kelle, and D. Peak A comparison of fixed and adaptive type controls for multi-product processing International Journal of Production Economics 45 1-3 1996 139 146
    • (1996) International Journal of Production Economics , vol.45 , Issue.13 , pp. 139-146
    • Kelle, P.1    Peak, D.2
  • 37
    • 4043140081 scopus 로고    scopus 로고
    • Analysis of multi-product kanban systems with state- dependent setups and lost sales
    • G.N. Krieg, and H. Kuhn Analysis of multi-product kanban systems with state- dependent setups and lost sales Annals of Operations Research 125 1 2004 141 166
    • (2004) Annals of Operations Research , vol.125 , Issue.1 , pp. 141-166
    • Krieg, G.N.1    Kuhn, H.2
  • 38
    • 19644379724 scopus 로고    scopus 로고
    • Re-examining the performance of MRP and kanban control strategies for multi-product flexible manufacturing systems
    • A. Krishnamurthy, R. Suri, and M. Vernon Re-examining the performance of MRP and kanban control strategies for multi-product flexible manufacturing systems International Journal of Flexible Manufacturing Systems 16 2 2004 123 150
    • (2004) International Journal of Flexible Manufacturing Systems , vol.16 , Issue.2 , pp. 123-150
    • Krishnamurthy, A.1    Suri, R.2    Vernon, M.3
  • 39
    • 0000120744 scopus 로고
    • An approximate analytical method for general queueing networks
    • R.A. Marie An approximate analytical method for general queueing networks IEEE Transactions on Software Engineering 5 5 1979 530 538
    • (1979) IEEE Transactions on Software Engineering , vol.5 , Issue.5 , pp. 530-538
    • Marie, R.A.1
  • 40
    • 0029288838 scopus 로고
    • A comparison of alternative kanban control mechanisms. I. Background and structural results
    • J.A. Mustadt, and S.R. Tayur A comparison of alternative kanban control mechanisms. I. Background and structural results IIE Transactions 27 2 1995 140 150
    • (1995) IIE Transactions , vol.27 , Issue.2 , pp. 140-150
    • Mustadt, J.A.1    Tayur, S.R.2
  • 41
    • 0029288358 scopus 로고
    • A comparison of alternative kanban control mechanisms. II. Experiment results
    • J.A. Mustadt, and S.R. Tayur A comparison of alternative kanban control mechanisms. II. Experiment results IIE Transactions 27 2 1995 151 161
    • (1995) IIE Transactions , vol.27 , Issue.2 , pp. 151-161
    • Mustadt, J.A.1    Tayur, S.R.2
  • 43
    • 61449145606 scopus 로고    scopus 로고
    • Restricted work-in-process: A study of differences between Kanban and CONWIP
    • J.-A. Pettersen, and A. Segerstedt Restricted work-in-process: a study of differences between Kanban and CONWIP International Journal of Production Economics 118 1 2009 199 207
    • (2009) International Journal of Production Economics , vol.118 , Issue.1 , pp. 199-207
    • Pettersen, J.-A.1    Segerstedt, A.2
  • 44
    • 27844560093 scopus 로고    scopus 로고
    • Allocating work in process in a multiple-product CONWIP system with lost sales
    • S.M. Ryan, and J. Vorasayan Allocating work in process in a multiple-product CONWIP system with lost sales International Journal of Production Research 43 2 2005 223 246
    • (2005) International Journal of Production Research , vol.43 , Issue.2 , pp. 223-246
    • Ryan, S.M.1    Vorasayan, J.2
  • 45
    • 38049086229 scopus 로고    scopus 로고
    • Performance evaluation of a multiproduct system under CONWIP control
    • K. Satyam, and A. Krishnamurthy Performance evaluation of a multiproduct system under CONWIP control IIE Transactions 40 3 2008 252 264
    • (2008) IIE Transactions , vol.40 , Issue.3 , pp. 252-264
    • Satyam, K.1    Krishnamurthy, A.2
  • 46
    • 0002779268 scopus 로고    scopus 로고
    • Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes
    • J.S. Song, S.H. Xu, and B. Lin Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes Operations Research 47 1 1999 131 149
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 131-149
    • Song, J.S.1    Xu, S.H.2    Lin, B.3
  • 48
    • 0000996514 scopus 로고
    • Customer service in pull production system
    • M.L. Spearman Customer service in pull production system Operations Research 40 5 1992 948 958
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 948-958
    • Spearman, M.L.1
  • 50
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • M.L. Spearman, and M.A. Zazanis Push and pull production systems: issues and comparisons Operations Research 40 3 1992 521 532
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 52
    • 33748712013 scopus 로고    scopus 로고
    • Parallel algorithm for setting WIP levels for multi-product CONWIP systems
    • L. Wang, and V. Prabhu Parallel algorithm for setting WIP levels for multi-product CONWIP systems International Journal of Production Research 44 21 2006 4681 4693
    • (2006) International Journal of Production Research , vol.44 , Issue.21 , pp. 4681-4693
    • Wang, L.1    Prabhu, V.2
  • 53
    • 70450277592 scopus 로고    scopus 로고
    • A performance comparison between Kanban and CONWIP controlled assembly systems
    • K.G. Yaghoub A performance comparison between Kanban and CONWIP controlled assembly systems Journal of Intelligent Manufacturing 20 6 2009 751 760
    • (2009) Journal of Intelligent Manufacturing , vol.20 , Issue.6 , pp. 751-760
    • Yaghoub, K.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.