메뉴 건너뛰기




Volumn 176, Issue 2, 2006, Pages 609-620

A multi-objective lead time control problem in multistage assembly systems using an interactive method

Author keywords

Control; Multiple objective programming; Production; Queueing

Indexed keywords

FILLING STATIONS; MATHEMATICAL MODELS; POISSON DISTRIBUTION; PROBLEM SOLVING; PRODUCTION; QUEUEING NETWORKS;

EID: 33646348135     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2005.10.005     Document Type: Article
Times cited : (13)

References (19)
  • 1
    • 33646382938 scopus 로고    scopus 로고
    • A. Azaron, H. Katagiri, K. Kato, M. Sakawa, Modelling complex assemblies as a queueing network for lead-time control, European Journal of Operational Research, in press.
  • 2
    • 15244342527 scopus 로고    scopus 로고
    • Distribution function of the shortest path in networks of queues
    • Azaron A., and Modarres M. Distribution function of the shortest path in networks of queues. OR Spectrum 27 (2005) 123-144
    • (2005) OR Spectrum , vol.27 , pp. 123-144
    • Azaron, A.1    Modarres, M.2
  • 3
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng T.C.E., and Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38 (1989) 156-166
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 4
    • 0032286478 scopus 로고    scopus 로고
    • A Markovian single server with upstream job and downstream demand arrival stream
    • Gold H. A Markovian single server with upstream job and downstream demand arrival stream. Queueing Systems 30 (1998) 435-455
    • (1998) Queueing Systems , vol.30 , pp. 435-455
    • Gold, H.1
  • 7
    • 0037395315 scopus 로고    scopus 로고
    • Performance analysis and buffer allocations in some open assembly systems
    • Hemachandra N., and Eedupuganti S.K. Performance analysis and buffer allocations in some open assembly systems. Computers and Operations Research 30 (2003) 695-704
    • (2003) Computers and Operations Research , vol.30 , pp. 695-704
    • Hemachandra, N.1    Eedupuganti, S.K.2
  • 9
  • 10
    • 0022785024 scopus 로고
    • Markov and Markov-regenerative PERT networks
    • Kulkarni V., and Adlakha V. Markov and Markov-regenerative PERT networks. Operations Research 34 (1986) 769-781
    • (1986) Operations Research , vol.34 , pp. 769-781
    • Kulkarni, V.1    Adlakha, V.2
  • 11
    • 33646382207 scopus 로고
    • On total sojourn time in networks of queues
    • Lemoine A.J. On total sojourn time in networks of queues. Management Science 25 (1979) 1034-1035
    • (1979) Management Science , vol.25 , pp. 1034-1035
    • Lemoine, A.J.1
  • 12
    • 0002485078 scopus 로고
    • Assembly-like queues with finite capacity: bounds, asymptotics and approximations
    • Lipper E.H., and Sengupta B. Assembly-like queues with finite capacity: bounds, asymptotics and approximations. Queueing Systems 1 (1986) 67-83
    • (1986) Queueing Systems , vol.1 , pp. 67-83
    • Lipper, E.H.1    Sengupta, B.2
  • 13
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines
    • Papadopoulos H.T., and Heavey C. Queueing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. European Journal of Operational Research 92 (1996) 1-27
    • (1996) European Journal of Operational Research , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 14
    • 4744374113 scopus 로고    scopus 로고
    • Performance analysis of a kitting process in stochastic assembly systems
    • Ramachandran S., and Delen D. Performance analysis of a kitting process in stochastic assembly systems. Computers and Operations Research 32 (2005) 449-463
    • (2005) Computers and Operations Research , vol.32 , pp. 449-463
    • Ramachandran, S.1    Delen, D.2
  • 15
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • Seidmann A., and Smith M.L. Due date assignment for production systems. Management Science 27 (1981) 571-581
    • (1981) Management Science , vol.27 , pp. 571-581
    • Seidmann, A.1    Smith, M.L.2
  • 18
  • 19
    • 0023558979 scopus 로고
    • Stochastic lead-time in two-level assembly systems
    • Yano C.A. Stochastic lead-time in two-level assembly systems. IIE Transactions 19 (1987) 371-378
    • (1987) IIE Transactions , vol.19 , pp. 371-378
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.