Volumn 46, Issue 7, 2015, Pages 1246-1256

Due-date assignment for multi-server multi-stage assembly systems

Author keywords

assembly system; due date assignment; Markov processes; queuing

Indexed keywords

ASSEMBLY; CONTINUOUS TIME SYSTEMS; CUSTOMER SATISFACTION; DIFFERENTIAL EQUATIONS; FILLING STATIONS; MARKOV PROCESSES; NETWORK ARCHITECTURE; QUEUEING NETWORKS; QUEUEING THEORY; RANDOM VARIABLES; STOCHASTIC SYSTEMS;

EID: 84920725400     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207721.2013.815826     Document Type: Article
Times cited : (5)

References (53)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release, and sequencing interaction in job shop scheduling
    • Ahmed, I., and Fisher, W.W. (1992). Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling. Decision Sciences, 23, 633-647
    • (1992) Decision Sciences , vol.23 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 3
    • 33646348135 scopus 로고    scopus 로고
    • Amulti-objective lead time control problem in multistage assembly systems using an interactive method
    • Azaron, A., and Kianfar, F. (2006). AMulti-Objective Lead Time Control Problem in Multistage Assembly Systems Using an Interactive Method. Applied Mathematics and Computation, 176, 609-620
    • (2006) Applied Mathematics and Computation , vol.176 , pp. 609-620
    • Azaron, A.1    Kianfar, F.2
  • 4
    • 64949115456 scopus 로고    scopus 로고
    • Due date assignment for multistage assembly systems
    • Azaron, A., and Kianfar, F. (2009). Due Date Assignment for Multistage Assembly Systems. Optimum Letters, 3, 199-210
    • (2009) Optimum Letters , vol.3 , pp. 199-210
    • Azaron, A.1    Kianfar, F.2
  • 5
    • 15244342527 scopus 로고    scopus 로고
    • Distribution function of the shortest path in networks of queues
    • Azaron, A., and Modarres, M. (2005). Distribution Function of the Shortest Path in Networks of Queues. OR Spectrum, 27, 123-144
    • (2005) OR Spectrum , vol.27 , pp. 123-144
    • Azaron, A.1    Modarres, M.2
  • 6
    • 0029632603 scopus 로고
    • A predictivemodel for the throughput of simple assembly systems
    • Baker, K.R., and Powell, S.G. (1995). A PredictiveModel for the Throughput of Simple Assembly Systems. European Journal of Operational Research, 81, 336-345
    • (1995) European Journal of Operational Research , vol.81 , pp. 336-345
    • Baker, K.R.1    Powell, S.G.2
  • 7
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars, I. (1986). A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem. Management Science, 32, 909-932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 8
    • 0002485077 scopus 로고
    • Finite capacity assembly-like queues
    • Bhat, U.N. (1986). Finite Capacity Assembly-Like Queues. Queueing Systems, 1, 85-101
    • (1986) Queueing Systems , vol.1 , pp. 85-101
    • Bhat, U.N.1
  • 9
    • 0035852851 scopus 로고    scopus 로고
    • Common due date assignment for scheduling on a single machine with jointly reducible processing times
    • Biskup, D., and Jahnke, H. (2001). Common Due Date Assignment for Scheduling on a Single Machine with Jointly Reducible Processing Times. International Journal of Production Economics, 69, 317-322
    • (2001) International Journal of Production Economics , vol.69 , pp. 317-322
    • Biskup, D.1    Jahnke, H.2
  • 10
    • 84859081080 scopus 로고    scopus 로고
    • An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate
    • Chang, H.J., Su, R.H., Yang, C.T., and Weng, M.W. (2012). An Economic Manufacturing Quantity Model for a Two-Stage Assembly System with Imperfect Processes and Variable Production Rate. Computers & Industrial Engineering, 63, 285-293
    • (2012) Computers & Industrial Engineering , vol.63 , pp. 285-293
    • Chang, H.J.1    Su, R.H.2    Yang, C.T.3    Weng, M.W.4
  • 12
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T.C.E., and Gupta, M.C. (1989). Survey of Scheduling Research Involving Due Date Determination Decisions. European Journal of Operational Research, 38, 156-166
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 13
    • 2342656496 scopus 로고    scopus 로고
    • Due-date assignment and single machine scheduling with deteriorating jobs
    • Cheng, T.C.E., Kang, L., and Ng, C.T. (2004). Due-Date Assignment and Single Machine Scheduling with Deteriorating Jobs. Journal of the Operational Research Society, 55, 198-203
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 198-203
    • Cheng, T.C.E.1    Kang, L.2    Ng, C.T.3
  • 15
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliablemachines and finite buffer
    • Di Mascolo, M.,David, R.and Dallery, Y. (1991). Modeling and Analysis of Assembly Systems with UnreliableMachines and Finite Buffer. IIE Transactions, 21, 315-330
    • (1991) IIE Transactions , vol.21 , pp. 315-330
    • Di Mascolo, M.1    David, R.2    Dallery, Y.3
  • 16
    • 0030407746 scopus 로고    scopus 로고
    • Assembly management in machine tool manufacturing and the prisma-leitstand
    • Drexl, A., and Kolisch, R. (1996). Assembly Management in Machine Tool Manufacturing and the PRISMA-Leitstand. Productions and Inventory Management Journal, 37, 55-57
    • (1996) Productions and Inventory Management Journal , vol.37 , pp. 55-57
    • Drexl, A.1    Kolisch, R.2
  • 17
    • 0023824517 scopus 로고
    • Evaluating project scheduling and due date assignment procedures: An experimental analysis
    • Dumond, J., and Mabert, V.A. (1988). Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis. Management Science, 34, 101-118
    • (1988) Management Science , vol.34 , pp. 101-118
    • Dumond, J.1    Mabert, V.A.2
  • 19
    • 0009377460 scopus 로고
    • Job shop dispatching rules using various due-date setting criteria
    • Elvers, D.A. (1973). Job Shop Dispatching Rules Using Various Due-Date Setting Criteria. Production and Inventory Management, 14, 63-79
    • (1973) Production and Inventory Management , vol.14 , pp. 63-79
    • Elvers, D.A.1
  • 20
    • 0024641634 scopus 로고
    • A comprehensive literature reviewandanalysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S., and Gagnon, R.J. (1989). A Comprehensive Literature ReviewandAnalysis of the Design, Balancing and Scheduling of Assembly Systems. International Journal of Production Research, 27, 637-670
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 21
    • 0037118177 scopus 로고    scopus 로고
    • Asurvey of the state of-the-art of common due date assignment and scheduling research
    • Gordon,V., Proth, J.M., andChu, C. (2002). ASurvey of the Stateof- the-Art of Common Due Date Assignment and Scheduling Research. European Journal of Operational Research, 139, 1-25
    • (2002) European Journal of Operational Research , vol.139 , pp. 1-25
    • Gordon, V.1    Proth, J.M.2    Chu, C.3
  • 22
    • 62549112638 scopus 로고    scopus 로고
    • Single machine scheduling and due date assignment with positionally dependent processing times
    • Gordon, V.S., and Strusevich, V.A. (2009). Single Machine Scheduling and Due Date Assignment with Positionally Dependent Processing Times. European Journal of Operational Research, 198, 57-62
    • (2009) European Journal of Operational Research , vol.198 , pp. 57-62
    • Gordon, V.S.1    Strusevich, V.A.2
  • 23
    • 0042279736 scopus 로고    scopus 로고
    • Queueing theory in manufacturing: A survey
    • Govil, M.K., and Fu, M.C. (1999). Queueing Theory in Manufacturing: A Survey. Journal of Manufacturing Systems, 18, 214-240
    • (1999) Journal of Manufacturing Systems , vol.18 , pp. 214-240
    • Govil, M.K.1    Fu, M.C.2
  • 25
    • 0037395315 scopus 로고    scopus 로고
    • Performance analysis and buffer allocations in some open assembly systems
    • Hemachandra, N., and Eedupuganti, S.K. (2003). Performance Analysis and Buffer Allocations in Some Open Assembly Systems. Computers & Operations Research, 30, 695-704
    • (2003) Computers & Operations Research , vol.30 , pp. 695-704
    • Hemachandra, N.1    Eedupuganti, S.K.2
  • 26
    • 84859506953 scopus 로고    scopus 로고
    • Optimizingmulti- stage production for an assembly-type supply chain with unequal sized batch shipments
    • Ho,W.T., Pan, J.C.H., and Hsiao, Y.C. (2012). OptimizingMulti- Stage Production for An Assembly-Type Supply Chain with Unequal Sized Batch Shipments. Journal of Optimization Theory and Applications, 153, 513-531
    • (2012) Journal of Optimization Theory and Applications , vol.153 , pp. 513-531
    • Ho, W.T.1    Pan, J.C.H.2    Hsiao, Y.C.3
  • 27
    • 0001632693 scopus 로고
    • Bounds and heuristics for assembly-like queues
    • Hopp, W.J., and Simon, J.T. (1989). Bounds and Heuristics for Assembly-Like Queues. Queueing Systems, 4, 137-156
    • (1989) Queueing Systems , vol.4 , pp. 137-156
    • Hopp, W.J.1    Simon, J.T.2
  • 28
    • 0015681904 scopus 로고
    • An economic evaluation of job shop dispatching rules
    • Jones, C.H. (1973). An Economic Evaluation of Job Shop Dispatching Rules. Management Science, 20, 293-307
    • (1973) Management Science , vol.20 , pp. 293-307
    • Jones, C.H.1
  • 29
    • 0022785024 scopus 로고
    • Markov and markov- regenerative pert networks
    • Kulkarni, V., and Adlakha, V. (1986). Markov and Markov- Regenerative PERT Networks. Operations Research, 34, 769-781
    • (1986) Operations Research , vol.34 , pp. 769-781
    • Kulkarni, V.1    Adlakha, V.2
  • 30
    • 0001978594 scopus 로고
    • Efficient algorithm solutions to exponential tandem queue with blocking
    • Latouche, G., and Neuts, M.F. (1980). Efficient Algorithm Solutions to Exponential Tandem Queue with Blocking. SIAM Journal on Algebraic and Discrete Methods, 1, 93-106
    • (1980) SIAM Journal on Algebraic and Discrete Methods , vol.1 , pp. 93-106
    • Latouche, G.1    Neuts, M.F.2
  • 32
    • 0002485078 scopus 로고
    • Assembly-like queues with finite capacity: Bounds, asymptotics and approximations
    • Lipper, E.H., and Sengupta, B. (1986). Assembly-Like Queues with Finite Capacity: Bounds, Asymptotics and Approximations. Queueing Systems, 1, 67-83
    • (1986) Queueing Systems , vol.1 , pp. 67-83
    • Lipper, E.H.1    Sengupta, B.2
  • 33
    • 0025414457 scopus 로고
    • Approximate models of assembly systems with finite inventory banks
    • Liu, X.G., and Buzacott, J.A. (1990). Approximate Models of Assembly Systems with Finite Inventory Banks. European Journal of Operational Research, 45, 143-154
    • (1990) European Journal of Operational Research , vol.45 , pp. 143-154
    • Liu, X.G.1    Buzacott, J.A.2
  • 34
    • 0035900867 scopus 로고    scopus 로고
    • Throughput, flow times, and service level in an unreliable assembly system
    • Liu, L., and Yuan, X.M. (2001). Throughput, Flow Times, and Service Level in an Unreliable Assembly System. European Journal of Operational Research, 135, 602-615
    • (2001) European Journal of Operational Research , vol.135 , pp. 602-615
    • Liu, L.1    Yuan, X.M.2
  • 35
    • 84870888581 scopus 로고    scopus 로고
    • Optimal mrp offsetting for assembly systems with stochastic lead times: Poq policy and service level constraint'
    • Louly, M.A., Dolgui, A., and Al-Ahmari, A. (2012). Optimal MRP Offsetting for Assembly Systems with Stochastic Lead Times: POQ Policy and Service Level Constraint', Journal of Intelligent Manufacturing, 23, 2485-2495
    • (2012) Journal of Intelligent Manufacturing , vol.23 , pp. 2485-2495
    • Louly, M.A.1    Dolgui, A.2    Al-Ahmari, A.3
  • 37
    • 36849069882 scopus 로고    scopus 로고
    • Queueing-model based analysis of assembly lines with finite buffers and general service times
    • Manitz, M. (2008). Queueing-Model Based Analysis of Assembly Lines with Finite Buffers and General Service Times. Computers & Operations Research, 35, 2520-2536
    • (2008) Computers & Operations Research , vol.35 , pp. 2520-2536
    • Manitz, M.1
  • 40
    • 0020103079 scopus 로고
    • Common due date assignment to minimize total penalty for the onemachine scheduling problem
    • Panwalkar, S.S., Smith, M.L., and Seidmann, A. (1982). Common Due Date Assignment to Minimize Total Penalty for the OneMachine Scheduling Problem. Operations Research, 30, 391-399
    • (1982) Operations Research , vol.30 , pp. 391-399
    • Panwalkar, S.S.1    Smith, M.L.2    Seidmann, A.3
  • 41
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H.T., and Heavey, C. (1996). Queueing Theory in Manufacturing Systems Analysis and Design: A Classification of Models for Production and Transfer Lines. European Journal of Operational Research, 92, 1-27
    • (1996) European Journal of Operational Research , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 42
    • 33846337097 scopus 로고    scopus 로고
    • A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
    • Perkgoz, C., Azaron, A., Katagiri, H., Kato, K., and Sakawa, M. (2007). A Multi-Objective Lead Time Control Problem in Multi-Stage Assembly Systems Using Genetic Algorithms. European Journal of Operational Research, 180, 292-308
    • (2007) European Journal of Operational Research , vol.180 , pp. 292-308
    • Perkgoz, C.1    Azaron, A.2    Katagiri, H.3    Kato, K.4    Sakawa, M.5
  • 43
    • 0016885524 scopus 로고
    • A statistical comparison of the performance of simple dispatching rules for particular set of job shops
    • Rochette, R., and Sadowski, R.P. (1976). A Statistical Comparison of the Performance of Simple Dispatching Rules for Particular Set of Job Shops. International Journal of Production Research, 14, 63-75
    • (1976) International Journal of Production Research , vol.14 , pp. 63-75
    • Rochette, R.1    Sadowski, R.P.2
  • 45
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • Seidmann, A., and Smith, M.L. (1981). Due Date Assignment for Production Systems. Management Science, 27, 571-581
    • (1981) Management Science , vol.27 , pp. 571-581
    • Seidmann, A.1    Smith, M.L.2
  • 46
    • 81855213156 scopus 로고    scopus 로고
    • Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries
    • Steiner, G., and Zhang, R. (2011). Minimizing the Weighted Number of Tardy Jobs with Due Date Assignment and Capacity-Constrained Deliveries. Annals of Operations Research, 191, 171-181
    • (2011) Annals of Operations Research , vol.191 , pp. 171-181
    • Steiner, G.1    Zhang, R.2
  • 47
    • 84862988124 scopus 로고    scopus 로고
    • A note on two-machine flow-shop scheduling with rejection and its link with flow-shop scheduling and common due date assignment
    • T'kindt, V., and Croce, F.D. (2012). A Note on Two-Machine Flow-Shop Scheduling with Rejection and Its Link with Flow-Shop Scheduling and Common Due Date Assignment. Computers & Operations Research, 39, 3244-3246
    • (2012) Computers & Operations Research , vol.39 , pp. 3244-3246
    • T'kindt, V.1    Croce, F.D.2
  • 48
    • 78649318482 scopus 로고    scopus 로고
    • Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system
    • Vinod, V., and Sridharan, R. (2011). Simulation Modeling and Analysis of Due-Date Assignment Methods and Scheduling Decision Rules in a Dynamic Job Shop Production System. International Journal of Production Economics, 129, 127-146
    • (2011) International Journal of Production Economics , vol.129 , pp. 127-146
    • Vinod, V.1    Sridharan, R.2
  • 49
    • 0018454859 scopus 로고
    • A simulation study of predictable due- dates
    • Weeks, J.K. (1979). A Simulation Study of Predictable Due- Dates. Management Science, 25, 363-373
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 50
    • 0017478424 scopus 로고
    • A methodology for assignment minimum cost due-date
    • Weeks, J.K., and Fryer, J.S. (1977). A Methodology for Assignment Minimum Cost Due-Date. Management Science, 23, 872-881
    • (1977) Management Science , vol.23 , pp. 872-881
    • Weeks, J.K.1    Fryer, J.S.2
  • 51
    • 34548434627 scopus 로고    scopus 로고
    • Job sequencing and due date assignment in a single machine shop with uncertain processing times
    • Xia, Y., Chen, B., and Yue, J. (2008). Job Sequencing and Due Date Assignment in a Single Machine Shop with Uncertain Processing Times. European Journal of Operational Research, 184, 63-75
    • (2008) European Journal of Operational Research , vol.184 , pp. 63-75
    • Xia, Y.1    Chen, B.2    Yue, J.3
  • 53
    • 7444243269 scopus 로고    scopus 로고
    • Performance analysis of assembly systems with unreliable machines and finite buffers
    • Yuan, X.M., and Liu, L. (2005). Performance Analysis of Assembly Systems with Unreliable Machines and Finite Buffers. European Journal of Operational Research, 161, 854-871
    • (2005) European Journal of Operational Research , vol.161 , pp. 854-871
    • Yuan, X.M.1    Liu, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.