-
1
-
-
84985810576
-
Due date assignment, job order release, and sequencing interaction in job shop scheduling
-
Ahmed, I., and Fisher, W.W. (1992). Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling. Decision Sciences, 23, 633-647
-
(1992)
Decision Sciences
, vol.23
, pp. 633-647
-
-
Ahmed, I.1
Fisher, W.W.2
-
2
-
-
33845297328
-
Modelling complex assemblies as a queueing network for lead time control
-
Azaron, A., Katagiri, H., Kato, K., and Sakawa,M. (2006). Modelling Complex Assemblies As a Queueing Network for Lead Time Control. European Journal of Operational Research, 174, 150-168
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 150-168
-
-
Azaron, A.1
Katagiri, H.2
Kato, K.3
Sakawa, M.4
-
3
-
-
33646348135
-
Amulti-objective lead time control problem in multistage assembly systems using an interactive method
-
Azaron, A., and Kianfar, F. (2006). AMulti-Objective Lead Time Control Problem in Multistage Assembly Systems Using an Interactive Method. Applied Mathematics and Computation, 176, 609-620
-
(2006)
Applied Mathematics and Computation
, vol.176
, pp. 609-620
-
-
Azaron, A.1
Kianfar, F.2
-
4
-
-
64949115456
-
Due date assignment for multistage assembly systems
-
Azaron, A., and Kianfar, F. (2009). Due Date Assignment for Multistage Assembly Systems. Optimum Letters, 3, 199-210
-
(2009)
Optimum Letters
, vol.3
, pp. 199-210
-
-
Azaron, A.1
Kianfar, F.2
-
5
-
-
15244342527
-
Distribution function of the shortest path in networks of queues
-
Azaron, A., and Modarres, M. (2005). Distribution Function of the Shortest Path in Networks of Queues. OR Spectrum, 27, 123-144
-
(2005)
OR Spectrum
, vol.27
, pp. 123-144
-
-
Azaron, A.1
Modarres, M.2
-
6
-
-
0029632603
-
A predictivemodel for the throughput of simple assembly systems
-
Baker, K.R., and Powell, S.G. (1995). A PredictiveModel for the Throughput of Simple Assembly Systems. European Journal of Operational Research, 81, 336-345
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 336-345
-
-
Baker, K.R.1
Powell, S.G.2
-
7
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
Baybars, I. (1986). A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem. Management Science, 32, 909-932
-
(1986)
Management Science
, vol.32
, pp. 909-932
-
-
Baybars, I.1
-
8
-
-
0002485077
-
Finite capacity assembly-like queues
-
Bhat, U.N. (1986). Finite Capacity Assembly-Like Queues. Queueing Systems, 1, 85-101
-
(1986)
Queueing Systems
, vol.1
, pp. 85-101
-
-
Bhat, U.N.1
-
9
-
-
0035852851
-
Common due date assignment for scheduling on a single machine with jointly reducible processing times
-
Biskup, D., and Jahnke, H. (2001). Common Due Date Assignment for Scheduling on a Single Machine with Jointly Reducible Processing Times. International Journal of Production Economics, 69, 317-322
-
(2001)
International Journal of Production Economics
, vol.69
, pp. 317-322
-
-
Biskup, D.1
Jahnke, H.2
-
10
-
-
84859081080
-
An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate
-
Chang, H.J., Su, R.H., Yang, C.T., and Weng, M.W. (2012). An Economic Manufacturing Quantity Model for a Two-Stage Assembly System with Imperfect Processes and Variable Production Rate. Computers & Industrial Engineering, 63, 285-293
-
(2012)
Computers & Industrial Engineering
, vol.63
, pp. 285-293
-
-
Chang, H.J.1
Su, R.H.2
Yang, C.T.3
Weng, M.W.4
-
12
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T.C.E., and Gupta, M.C. (1989). Survey of Scheduling Research Involving Due Date Determination Decisions. European Journal of Operational Research, 38, 156-166
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
13
-
-
2342656496
-
Due-date assignment and single machine scheduling with deteriorating jobs
-
Cheng, T.C.E., Kang, L., and Ng, C.T. (2004). Due-Date Assignment and Single Machine Scheduling with Deteriorating Jobs. Journal of the Operational Research Society, 55, 198-203
-
(2004)
Journal of the Operational Research Society
, vol.55
, pp. 198-203
-
-
Cheng, T.C.E.1
Kang, L.2
Ng, C.T.3
-
14
-
-
44649165595
-
Assembly systems with non-exponential machines: Throughput and bottlenecks
-
Ching, S.N., Meerkov, S.M., and Zhang, L. (2008). Assembly Systems with Non-Exponential Machines: Throughput and Bottlenecks. Nonlinear Analysis: Theory, Methods & Applications, 69, 911-917
-
(2008)
Nonlinear Analysis: Theory, Methods & Applications
, vol.69
, pp. 911-917
-
-
Ching, S.N.1
Meerkov, S.M.2
Zhang, L.3
-
15
-
-
84873013614
-
Modeling and analysis of assembly systems with unreliablemachines and finite buffer
-
Di Mascolo, M.,David, R.and Dallery, Y. (1991). Modeling and Analysis of Assembly Systems with UnreliableMachines and Finite Buffer. IIE Transactions, 21, 315-330
-
(1991)
IIE Transactions
, vol.21
, pp. 315-330
-
-
Di Mascolo, M.1
David, R.2
Dallery, Y.3
-
16
-
-
0030407746
-
Assembly management in machine tool manufacturing and the prisma-leitstand
-
Drexl, A., and Kolisch, R. (1996). Assembly Management in Machine Tool Manufacturing and the PRISMA-Leitstand. Productions and Inventory Management Journal, 37, 55-57
-
(1996)
Productions and Inventory Management Journal
, vol.37
, pp. 55-57
-
-
Drexl, A.1
Kolisch, R.2
-
17
-
-
0023824517
-
Evaluating project scheduling and due date assignment procedures: An experimental analysis
-
Dumond, J., and Mabert, V.A. (1988). Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis. Management Science, 34, 101-118
-
(1988)
Management Science
, vol.34
, pp. 101-118
-
-
Dumond, J.1
Mabert, V.A.2
-
19
-
-
0009377460
-
Job shop dispatching rules using various due-date setting criteria
-
Elvers, D.A. (1973). Job Shop Dispatching Rules Using Various Due-Date Setting Criteria. Production and Inventory Management, 14, 63-79
-
(1973)
Production and Inventory Management
, vol.14
, pp. 63-79
-
-
Elvers, D.A.1
-
20
-
-
0024641634
-
A comprehensive literature reviewandanalysis of the design, balancing and scheduling of assembly systems
-
Ghosh, S., and Gagnon, R.J. (1989). A Comprehensive Literature ReviewandAnalysis of the Design, Balancing and Scheduling of Assembly Systems. International Journal of Production Research, 27, 637-670
-
(1989)
International Journal of Production Research
, vol.27
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
21
-
-
0037118177
-
Asurvey of the state of-the-art of common due date assignment and scheduling research
-
Gordon,V., Proth, J.M., andChu, C. (2002). ASurvey of the Stateof- the-Art of Common Due Date Assignment and Scheduling Research. European Journal of Operational Research, 139, 1-25
-
(2002)
European Journal of Operational Research
, vol.139
, pp. 1-25
-
-
Gordon, V.1
Proth, J.M.2
Chu, C.3
-
22
-
-
62549112638
-
Single machine scheduling and due date assignment with positionally dependent processing times
-
Gordon, V.S., and Strusevich, V.A. (2009). Single Machine Scheduling and Due Date Assignment with Positionally Dependent Processing Times. European Journal of Operational Research, 198, 57-62
-
(2009)
European Journal of Operational Research
, vol.198
, pp. 57-62
-
-
Gordon, V.S.1
Strusevich, V.A.2
-
25
-
-
0037395315
-
Performance analysis and buffer allocations in some open assembly systems
-
Hemachandra, N., and Eedupuganti, S.K. (2003). Performance Analysis and Buffer Allocations in Some Open Assembly Systems. Computers & Operations Research, 30, 695-704
-
(2003)
Computers & Operations Research
, vol.30
, pp. 695-704
-
-
Hemachandra, N.1
Eedupuganti, S.K.2
-
26
-
-
84859506953
-
Optimizingmulti- stage production for an assembly-type supply chain with unequal sized batch shipments
-
Ho,W.T., Pan, J.C.H., and Hsiao, Y.C. (2012). OptimizingMulti- Stage Production for An Assembly-Type Supply Chain with Unequal Sized Batch Shipments. Journal of Optimization Theory and Applications, 153, 513-531
-
(2012)
Journal of Optimization Theory and Applications
, vol.153
, pp. 513-531
-
-
Ho, W.T.1
Pan, J.C.H.2
Hsiao, Y.C.3
-
27
-
-
0001632693
-
Bounds and heuristics for assembly-like queues
-
Hopp, W.J., and Simon, J.T. (1989). Bounds and Heuristics for Assembly-Like Queues. Queueing Systems, 4, 137-156
-
(1989)
Queueing Systems
, vol.4
, pp. 137-156
-
-
Hopp, W.J.1
Simon, J.T.2
-
28
-
-
0015681904
-
An economic evaluation of job shop dispatching rules
-
Jones, C.H. (1973). An Economic Evaluation of Job Shop Dispatching Rules. Management Science, 20, 293-307
-
(1973)
Management Science
, vol.20
, pp. 293-307
-
-
Jones, C.H.1
-
29
-
-
0022785024
-
Markov and markov- regenerative pert networks
-
Kulkarni, V., and Adlakha, V. (1986). Markov and Markov- Regenerative PERT Networks. Operations Research, 34, 769-781
-
(1986)
Operations Research
, vol.34
, pp. 769-781
-
-
Kulkarni, V.1
Adlakha, V.2
-
31
-
-
0031103567
-
Developing scheduling systems for daewoo shipbuilding: Das project
-
Lee, J.K., Lee, K.J., Park, H.K., Hong, J.S., and Lee, J.S. (1997). Developing Scheduling Systems for Daewoo Shipbuilding: DAS Project. European Journal of Operational Research, 97, 380-395
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 380-395
-
-
Lee, J.K.1
Lee, K.J.2
Park, H.K.3
Hong, J.S.4
Lee, J.S.5
-
32
-
-
0002485078
-
Assembly-like queues with finite capacity: Bounds, asymptotics and approximations
-
Lipper, E.H., and Sengupta, B. (1986). Assembly-Like Queues with Finite Capacity: Bounds, Asymptotics and Approximations. Queueing Systems, 1, 67-83
-
(1986)
Queueing Systems
, vol.1
, pp. 67-83
-
-
Lipper, E.H.1
Sengupta, B.2
-
33
-
-
0025414457
-
Approximate models of assembly systems with finite inventory banks
-
Liu, X.G., and Buzacott, J.A. (1990). Approximate Models of Assembly Systems with Finite Inventory Banks. European Journal of Operational Research, 45, 143-154
-
(1990)
European Journal of Operational Research
, vol.45
, pp. 143-154
-
-
Liu, X.G.1
Buzacott, J.A.2
-
34
-
-
0035900867
-
Throughput, flow times, and service level in an unreliable assembly system
-
Liu, L., and Yuan, X.M. (2001). Throughput, Flow Times, and Service Level in an Unreliable Assembly System. European Journal of Operational Research, 135, 602-615
-
(2001)
European Journal of Operational Research
, vol.135
, pp. 602-615
-
-
Liu, L.1
Yuan, X.M.2
-
35
-
-
84870888581
-
Optimal mrp offsetting for assembly systems with stochastic lead times: Poq policy and service level constraint'
-
Louly, M.A., Dolgui, A., and Al-Ahmari, A. (2012). Optimal MRP Offsetting for Assembly Systems with Stochastic Lead Times: POQ Policy and Service Level Constraint', Journal of Intelligent Manufacturing, 23, 2485-2495
-
(2012)
Journal of Intelligent Manufacturing
, vol.23
, pp. 2485-2495
-
-
Louly, M.A.1
Dolgui, A.2
Al-Ahmari, A.3
-
37
-
-
36849069882
-
Queueing-model based analysis of assembly lines with finite buffers and general service times
-
Manitz, M. (2008). Queueing-Model Based Analysis of Assembly Lines with Finite Buffers and General Service Times. Computers & Operations Research, 35, 2520-2536
-
(2008)
Computers & Operations Research
, vol.35
, pp. 2520-2536
-
-
Manitz, M.1
-
40
-
-
0020103079
-
Common due date assignment to minimize total penalty for the onemachine scheduling problem
-
Panwalkar, S.S., Smith, M.L., and Seidmann, A. (1982). Common Due Date Assignment to Minimize Total Penalty for the OneMachine Scheduling Problem. Operations Research, 30, 391-399
-
(1982)
Operations Research
, vol.30
, pp. 391-399
-
-
Panwalkar, S.S.1
Smith, M.L.2
Seidmann, A.3
-
41
-
-
0030570340
-
Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
-
Papadopoulos, H.T., and Heavey, C. (1996). Queueing Theory in Manufacturing Systems Analysis and Design: A Classification of Models for Production and Transfer Lines. European Journal of Operational Research, 92, 1-27
-
(1996)
European Journal of Operational Research
, vol.92
, pp. 1-27
-
-
Papadopoulos, H.T.1
Heavey, C.2
-
42
-
-
33846337097
-
A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
-
Perkgoz, C., Azaron, A., Katagiri, H., Kato, K., and Sakawa, M. (2007). A Multi-Objective Lead Time Control Problem in Multi-Stage Assembly Systems Using Genetic Algorithms. European Journal of Operational Research, 180, 292-308
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 292-308
-
-
Perkgoz, C.1
Azaron, A.2
Katagiri, H.3
Kato, K.4
Sakawa, M.5
-
43
-
-
0016885524
-
A statistical comparison of the performance of simple dispatching rules for particular set of job shops
-
Rochette, R., and Sadowski, R.P. (1976). A Statistical Comparison of the Performance of Simple Dispatching Rules for Particular Set of Job Shops. International Journal of Production Research, 14, 63-75
-
(1976)
International Journal of Production Research
, vol.14
, pp. 63-75
-
-
Rochette, R.1
Sadowski, R.P.2
-
44
-
-
0019593685
-
Optimal assignment of due-dates for a single processor scheduling problem
-
Seidmann, A., Panwalkar, S.S., and Smith,M.L. (1981). Optimal Assignment of Due-Dates for a Single Processor Scheduling Problem. International Journal of Production Research, 19, 393-399
-
(1981)
International Journal of Production Research
, vol.19
, pp. 393-399
-
-
Seidmann, A.1
Panwalkar, S.S.2
Smith, M.L.3
-
45
-
-
0019560165
-
Due date assignment for production systems
-
Seidmann, A., and Smith, M.L. (1981). Due Date Assignment for Production Systems. Management Science, 27, 571-581
-
(1981)
Management Science
, vol.27
, pp. 571-581
-
-
Seidmann, A.1
Smith, M.L.2
-
46
-
-
81855213156
-
Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries
-
Steiner, G., and Zhang, R. (2011). Minimizing the Weighted Number of Tardy Jobs with Due Date Assignment and Capacity-Constrained Deliveries. Annals of Operations Research, 191, 171-181
-
(2011)
Annals of Operations Research
, vol.191
, pp. 171-181
-
-
Steiner, G.1
Zhang, R.2
-
47
-
-
84862988124
-
A note on two-machine flow-shop scheduling with rejection and its link with flow-shop scheduling and common due date assignment
-
T'kindt, V., and Croce, F.D. (2012). A Note on Two-Machine Flow-Shop Scheduling with Rejection and Its Link with Flow-Shop Scheduling and Common Due Date Assignment. Computers & Operations Research, 39, 3244-3246
-
(2012)
Computers & Operations Research
, vol.39
, pp. 3244-3246
-
-
T'kindt, V.1
Croce, F.D.2
-
48
-
-
78649318482
-
Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system
-
Vinod, V., and Sridharan, R. (2011). Simulation Modeling and Analysis of Due-Date Assignment Methods and Scheduling Decision Rules in a Dynamic Job Shop Production System. International Journal of Production Economics, 129, 127-146
-
(2011)
International Journal of Production Economics
, vol.129
, pp. 127-146
-
-
Vinod, V.1
Sridharan, R.2
-
49
-
-
0018454859
-
A simulation study of predictable due- dates
-
Weeks, J.K. (1979). A Simulation Study of Predictable Due- Dates. Management Science, 25, 363-373
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
50
-
-
0017478424
-
A methodology for assignment minimum cost due-date
-
Weeks, J.K., and Fryer, J.S. (1977). A Methodology for Assignment Minimum Cost Due-Date. Management Science, 23, 872-881
-
(1977)
Management Science
, vol.23
, pp. 872-881
-
-
Weeks, J.K.1
Fryer, J.S.2
-
51
-
-
34548434627
-
Job sequencing and due date assignment in a single machine shop with uncertain processing times
-
Xia, Y., Chen, B., and Yue, J. (2008). Job Sequencing and Due Date Assignment in a Single Machine Shop with Uncertain Processing Times. European Journal of Operational Research, 184, 63-75
-
(2008)
European Journal of Operational Research
, vol.184
, pp. 63-75
-
-
Xia, Y.1
Chen, B.2
Yue, J.3
-
52
-
-
84862543317
-
Lead time control in multi-server multi-stage assembly system
-
Yaghoubi S., Noori, S., and Pourdadashi-komachali, F. (2012). Lead Time Control in Multi-Server Multi-Stage Assembly System. International Journal of Advanced Manufacturing Technology, 61, 351-368
-
(2012)
International Journal of Advanced Manufacturing Technology
, vol.61
, pp. 351-368
-
-
Yaghoubi, S.1
Noori, S.2
Pourdadashi-Komachali, F.3
-
53
-
-
7444243269
-
Performance analysis of assembly systems with unreliable machines and finite buffers
-
Yuan, X.M., and Liu, L. (2005). Performance Analysis of Assembly Systems with Unreliable Machines and Finite Buffers. European Journal of Operational Research, 161, 854-871
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 854-871
-
-
Yuan, X.M.1
Liu, L.2
|