-
1
-
-
0039330868
-
Recycling of electrical motors by automatic disassembly
-
KARLSSON B, JARRHED J. Recycling of electrical motors by automatic disassembly [J]. Measurement Science and Technology, 2000, 11 (4): 350-357.
-
(2000)
Measurement Science and Technology
, vol.11
, Issue.4
, pp. 350-357
-
-
Karlsson, B.1
Jarrhed, J.2
-
2
-
-
34548855063
-
Assessing the economics of pre-fragmentation material recovery within the UK
-
COATES G, RAHIMIFARD S. Assessing the economics of pre-fragmentation material recovery within the UK [J]. Resources, Conservation and Recycling, 2007, 52 (2): 286-302.
-
(2007)
Resources, Conservation and Recycling
, vol.52
, Issue.2
, pp. 286-302
-
-
Coates, G.1
Rahimifard, S.2
-
3
-
-
0032643684
-
Disassembly analysis through time estimation and other metrics
-
KROLL E, CARVER B S. Disassembly analysis through time estimation and other metrics [J]. Robotics and Computer-Integrated Manufacturing, 1999, 15 (3): 191-200.
-
(1999)
Robotics and Computer-Integrated Manufacturing
, vol.15
, Issue.3
, pp. 191-200
-
-
Kroll, E.1
Carver, B.S.2
-
4
-
-
0042121079
-
Evaluation of disassemblability to enable design for disassembly in mass production
-
DESAI A, MITAL A. Evaluation of disassemblability to enable design for disassembly in mass production [J]. International Journal of Industrial Ergonomics, 2003, 32 (4): 265-281.
-
(2003)
International Journal of Industrial Ergonomics
, vol.32
, Issue.4
, pp. 265-281
-
-
Desai, A.1
Mital, A.2
-
5
-
-
0037962814
-
Reversibility and disassembly time of part connection
-
KONDO Y, DEGUCHI K, HAYASHI Y, et al. Reversibility and disassembly time of part connection [J]. Resources, Conservation and Recycling, 2003, 38 (3): 175-184.
-
(2003)
Resources, Conservation and Recycling
, vol.38
, Issue.3
, pp. 175-184
-
-
Kondo, Y.1
Deguchi, K.2
Hayashi, Y.3
-
6
-
-
35748982142
-
The time based evaluation of product disassemblibility and design improvement
-
in Chinese
-
YU Suiran, TAO Jing, CHEN Hong, et al. The time based evaluation of product disassemblibility and design improvement [J]. Journal of Shanghai Jiaotong University, 2007, 41 (9): 1476-1483 (in Chinese).
-
(2007)
Journal of Shanghai Jiaotong University
, vol.41
, Issue.9
, pp. 1476-1483
-
-
Yu, S.1
Tao, J.2
Chen, H.3
-
7
-
-
79958259628
-
Evaluation method of product detachability based on of disassembling time probability
-
in Chinese
-
CHU Jiangwei, JIN Xiaohong, CUI Pengfei, et al. Evaluation method of product detachability based on of disassembling time probability [J]. Journal of Machine Design, 2008, 25 (10): 24-27 (in Chinese).
-
(2008)
Journal of Machine Design
, vol.25
, Issue.10
, pp. 24-27
-
-
Chu, J.1
Jin, X.2
Cui, P.3
-
8
-
-
79960599624
-
Stochastic network model for disassembly of discarded products
-
in Chinese
-
XIE Jiaping, REN Yi, ZHAO Zhong. Stochastic network model for disassembly of discarded products [J]. Chinese Journal of Mangement, 2007, 4 (2): 174-179 (in Chinese).
-
(2007)
Chinese Journal of Mangement
, vol.4
, Issue.2
, pp. 174-179
-
-
Xie, J.1
Ren, Y.2
Zhao, Z.3
-
9
-
-
34547742505
-
Disassembly sequence planning in a disassembly cell context
-
ANDRES C, LOZANO S, ADENSO-DIAZ B. Disassembly sequence planning in a disassembly cell context [J]. Robotics and Computer-Integrated Manufacturing, 2007, 23 (6): 690-695.
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, Issue.6
, pp. 690-695
-
-
Andres, C.1
Lozano, S.2
Adenso-Diaz, B.3
|