메뉴 건너뛰기




Volumn 144, Issue 2, 2013, Pages 610-617

Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging

Author keywords

Arithmetic geometric mean inequality; Complete backlogging; Imperfect production process; Inventory; Permissible delay in payments

Indexed keywords

ARITHMETIC-GEOMETRIC MEAN INEQUALITIES; COMPLETE BACKLOGGING; IMPERFECT PRODUCTION PROCESS; INVENTORY; PERMISSIBLE DELAY IN PAYMENTS;

EID: 84878831877     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2013.04.027     Document Type: Article
Times cited : (115)

References (42)
  • 1
    • 21844488130 scopus 로고
    • Ordering policies of deteriorating items under permissible delay in payments
    • S.P. Aggarwal, and C.K. Jaggi Ordering policies of deteriorating items under permissible delay in payments Journal of the Operational Research Society 46 1995 658 662
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 658-662
    • Aggarwal, S.P.1    Jaggi, C.K.2
  • 2
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • M. Ben-Daya The economic production lot-sizing problem with imperfect production processes and imperfect maintenance International Journal of Production Economics 76 2002 257 264
    • (2002) International Journal of Production Economics , vol.76 , pp. 257-264
    • Ben-Daya, M.1
  • 3
    • 75449092240 scopus 로고    scopus 로고
    • A simple method to compute economic order quantities: Some observations
    • L.E. Cardenas-Barron A simple method to compute economic order quantities: some observations Applied Mathematical Modelling 34 2010 1684 1688
    • (2010) Applied Mathematical Modelling , vol.34 , pp. 1684-1688
    • Cardenas-Barron, L.E.1
  • 4
    • 1642290210 scopus 로고    scopus 로고
    • An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity
    • C.T. Chang An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity International Journal of Production Economics 88 2004 307 316
    • (2004) International Journal of Production Economics , vol.88 , pp. 307-316
    • Chang, C.T.1
  • 5
    • 0242487825 scopus 로고    scopus 로고
    • An EOQ model for deteriorating items under supplier credits linked to ordering quantity
    • C.T. Chang, L.Y. Ouyang, and J.T. Teng An EOQ model for deteriorating items under supplier credits linked to ordering quantity Applied Mathematical Modelling 27 2003 983 996
    • (2003) Applied Mathematical Modelling , vol.27 , pp. 983-996
    • Chang, C.T.1    Ouyang, L.Y.2    Teng, J.T.3
  • 6
    • 77955470503 scopus 로고    scopus 로고
    • Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits
    • C.T. Chang, J.T. Teng, and M.S. Chern Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits International Journal of Production Economics 127 2010 197 202
    • (2010) International Journal of Production Economics , vol.127 , pp. 197-202
    • Chang, C.T.1    Teng, J.T.2    Chern, M.S.3
  • 7
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng An economic order quantity model with demand-dependent unit production cost and imperfect production processes IIE Transaction 23 1991 23 28
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 8
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y.P. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging Engineering Optimization 35 2003 427 437
    • (2003) Engineering Optimization , vol.35 , pp. 427-437
    • Chiu, Y.P.1
  • 9
    • 38349058125 scopus 로고    scopus 로고
    • Production lot size problem with failure in repair and backlogging derived without derivatives
    • S.W. Chiu Production lot size problem with failure in repair and backlogging derived without derivatives European Journal of Operational Research 188 2008 610 615
    • (2008) European Journal of Operational Research , vol.188 , pp. 610-615
    • Chiu, S.W.1
  • 10
    • 78149258620 scopus 로고    scopus 로고
    • An algebraic approach for determining the optimal lot size for EPQ model with rework process
    • S.W. Chiu, C.B. Cheng, M.F. Wu, and J.C. Yang An algebraic approach for determining the optimal lot size for EPQ model with rework process Mathematical and Computational Applications 15 2010 364 370
    • (2010) Mathematical and Computational Applications , vol.15 , pp. 364-370
    • Chiu, S.W.1    Cheng, C.B.2    Wu, M.F.3    Yang, J.C.4
  • 11
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modelling for production system with backlogging and failure in repair
    • S.W. Chiu, and Y.P. Chiu Mathematical modelling for production system with backlogging and failure in repair Journal of Scientific and Industrial Research 65 2006 499 506
    • (2006) Journal of Scientific and Industrial Research , vol.65 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.P.2
  • 12
    • 8744223416 scopus 로고    scopus 로고
    • The effects of the random defective rate and the imperfect rework process on the economic production quantity model
    • S.W. Chiu, D.C. Gong, and H.M. Wee The effects of the random defective rate and the imperfect rework process on the economic production quantity model Japan Journal of Industrial and Applied Mathematics 21 2004 375 389
    • (2004) Japan Journal of Industrial and Applied Mathematics , vol.21 , pp. 375-389
    • Chiu, S.W.1    Gong, D.C.2    Wee, H.M.3
  • 14
    • 0022045262 scopus 로고
    • Economic order quantity under conditions of permissible delay in payments
    • S.K. Goyal Economic order quantity under conditions of permissible delay in payments Journal of the Operational Research Society 36 1985 335 338
    • (1985) Journal of the Operational Research Society , vol.36 , pp. 335-338
    • Goyal, S.K.1
  • 15
    • 33751421995 scopus 로고    scopus 로고
    • Optimal ordering policies when the supplier provides a progressive interest scheme
    • S.K. Goyal, J.T. Teng, and C.T. Chang Optimal ordering policies when the supplier provides a progressive interest scheme European Journal of Operational Research 179 2007 404 413
    • (2007) European Journal of Operational Research , vol.179 , pp. 404-413
    • Goyal, S.K.1    Teng, J.T.2    Chang, C.T.3
  • 16
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek, and M.K. Salameh Production lot sizing with the reworking of imperfect quality items produced Production Planning and Control 12 2001 584 590
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 17
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A.M.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at a single-stage production system Computers & Industrial Engineering 47 2004 77 89
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 18
    • 0031200313 scopus 로고    scopus 로고
    • An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
    • A.M. Jamal, B.R. Sarker, and S. Wang An ordering policy for deteriorating items with allowable shortage and permissible delay in payment Journal of the Operational Research Society 48 1997 826 833
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 826-833
    • Jamal, A.M.1    Sarker, B.R.2    Wang, S.3
  • 19
    • 43549120249 scopus 로고    scopus 로고
    • An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit
    • J.J. Liao An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit International Journal of Production Economics 113 2008 852 861
    • (2008) International Journal of Production Economics , vol.113 , pp. 852-861
    • Liao, J.J.1
  • 20
    • 0037380652 scopus 로고    scopus 로고
    • Integrated production-inventory models for imperfect production processes under inspection schedules
    • C.S. Lin, C.H. Chen, and D.E. Kroll Integrated production-inventory models for imperfect production processes under inspection schedules Computers & Industrial Engineering 44 2003 633 650
    • (2003) Computers & Industrial Engineering , vol.44 , pp. 633-650
    • Lin, C.S.1    Chen, C.H.2    Kroll, D.E.3
  • 21
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • J.J. Liu, and P. Yang Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs European Journal of Operational Research 91 1996 517 527
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 22
    • 84855982935 scopus 로고    scopus 로고
    • Inventory ordering policies of delayed deteriorating items under permissible delay in payments
    • A. Musa, and B. Sani Inventory ordering policies of delayed deteriorating items under permissible delay in payments International Journal of Production Economics 136 2012 75 83
    • (2012) International Journal of Production Economics , vol.136 , pp. 75-83
    • Musa, A.1    Sani, B.2
  • 25
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • E.L. Porteus Optimal lot sizing, process quality improvement and setup cost reduction Operations Research 34 1986 137 144
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 26
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1986 48 55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 28
    • 69249219084 scopus 로고    scopus 로고
    • A production inventory model in an imperfect production process
    • S.S. Sana A production inventory model in an imperfect production process European Journal of Operational Research 200 2010 451 464
    • (2010) European Journal of Operational Research , vol.200 , pp. 451-464
    • Sana, S.S.1
  • 29
    • 78650179722 scopus 로고    scopus 로고
    • A production-inventory model of imperfect quality products in a three-layer supply chain
    • S.S. Sana A production-inventory model of imperfect quality products in a three-layer supply chain Decision Support Systems 50 2011 539 547
    • (2011) Decision Support Systems , vol.50 , pp. 539-547
    • Sana, S.S.1
  • 31
    • 83555160972 scopus 로고    scopus 로고
    • An inventory model with reliability in an imperfect production process
    • B. Sarker An inventory model with reliability in an imperfect production process Applied Mathematics and Computation 218 2012 4881 4891
    • (2012) Applied Mathematics and Computation , vol.218 , pp. 4881-4891
    • Sarker, B.1
  • 32
    • 79952002258 scopus 로고    scopus 로고
    • An EPQ model with inflation in an imperfect production system
    • B. Sarker, and I. Moon An EPQ model with inflation in an imperfect production system Applied Mathematics and Computation 217 2011 6159 6167
    • (2011) Applied Mathematics and Computation , vol.217 , pp. 6159-6167
    • Sarker, B.1    Moon, I.2
  • 34
    • 77955278534 scopus 로고    scopus 로고
    • Multi-product production quantity model with repair failure and partial backordering
    • A.A. Taleizadeh, H.M. Wee, and S.J. Sadjadi Multi-product production quantity model with repair failure and partial backordering Computers and Industrial Engineering 59 2010 45 54
    • (2010) Computers and Industrial Engineering , vol.59 , pp. 45-54
    • Taleizadeh, A.A.1    Wee, H.M.2    Sadjadi, S.J.3
  • 35
    • 84863200769 scopus 로고    scopus 로고
    • Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit
    • C.H. Su Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit International Journal of Production Economics 139 2012 247 256
    • (2012) International Journal of Production Economics , vol.139 , pp. 247-256
    • Su, C.H.1
  • 36
    • 0036682157 scopus 로고    scopus 로고
    • On economic order quantity under conditions of permissible delay in payments
    • J.T. Teng On economic order quantity under conditions of permissible delay in payments Journal of the Operational Research Society 53 2002 915 918
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 915-918
    • Teng, J.T.1
  • 37
    • 77955472804 scopus 로고    scopus 로고
    • Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
    • J.T. Teng, and C.T. Chang Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy European Journal of Operational Research 196 2009 177 185
    • (2009) European Journal of Operational Research , vol.196 , pp. 177-185
    • Teng, J.T.1    Chang, C.T.2
  • 39
  • 40
    • 69349091956 scopus 로고    scopus 로고
    • Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return
    • S.H. Yoo, D. Kim, and M.S. Park Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return International Journal of Production Economics 121 2009 255 265
    • (2009) International Journal of Production Economics , vol.121 , pp. 255-265
    • Yoo, S.H.1    Kim, D.2    Park, M.S.3
  • 41
    • 84866740448 scopus 로고    scopus 로고
    • Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return
    • S.H. Yoo, D. Kim, and M.S. Park Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return International Journal of Production Economics 140 2012 922 933
    • (2012) International Journal of Production Economics , vol.140 , pp. 922-933
    • Yoo, S.H.1    Kim, D.2    Park, M.S.3
  • 42
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang, and Y. Gerchak Joint lot sizing and inspection policy in an EOQ model with random yield IIE Transaction 22 1990 41 47
    • (1990) IIE Transaction , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.