-
1
-
-
0000356787
-
How many parts to make at once
-
F. W. Harris, How many parts to make at once, Factory, The Magazine of Management, 10, 135-136, 1913.
-
(1913)
Factory, the Magazine of Management
, vol.10
, pp. 135-136
-
-
Harris, F.W.1
-
4
-
-
0003398158
-
-
John Wiley & Sons, New York
-
E. A. Silver, D. F. Pyke, and R. Peterson, Inventory Management and Production Planning and Scheduling, John Wiley & Sons, New York, 1998.
-
(1998)
Inventory Management and Production Planning and Scheduling
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
5
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes, IIE Transaction, 18, 48-55, 1986.
-
(1986)
IIE Transaction
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
6
-
-
0025399639
-
Joint lot sizing and inspection policy in and EOQ model with random yield
-
X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in and EOQ model with random yield, IIE Transaction, 22, 41-47, 1990.
-
(1990)
IIE Transaction
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
7
-
-
31344465116
-
Solving an EPQ model with rework and service level constraint
-
Y-S. P. Chiu, S. W. Chiu, and H-D. Lin, Solving an EPQ model with rework and service level constraint, Mathematical & Computational Applications, 11, 75-84, 2006.
-
(2006)
Mathematical & Computational Applications
, vol.11
, pp. 75-84
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Lin, H.-D.3
-
8
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced, Production Planning and Control, 12, 584-590, 2001.
-
(2001)
Production Planning and Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
9
-
-
62349085901
-
Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
-
S. W. Chiu, K-K. Chen, and H-H. Chang, Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair", Mathematical and Computational Applications, 13, 137-145, 2008.
-
(2008)
Mathematical and Computational Applications
, vol.13
, pp. 137-145
-
-
Chiu, S.W.1
Chen, K.-K.2
Chang, H.-H.3
-
10
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single- stage production system
-
A. M. M. Jamal, B. R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single- stage production system, Computers and Industrial Engineering, 47, 77-89, 2004.
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
11
-
-
67649826546
-
Economic manufacturing quantity model with imperfect rework and
-
random breakdown under abort/resume policy
-
Y-S. P. Chiu, C-Y. Tseng, W-C. Liu, and C-K. Ting, Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy, P I Mech Eng B- Journal of Engineering Manufacture, 223, 183-194, 2009.
-
(2009)
P i Mech Eng B- Journal of Engineering Manufacture
, vol.223
, pp. 183-194
-
-
Chiu, Y.-S.P.1
Tseng, C.-Y.2
Liu, W.-C.3
Ting, C.-K.4
-
12
-
-
70349417897
-
A note on 'Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns'
-
Y-S. P. Chiu and C-K. Ting, A note on 'Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns', European Journal of Operational Research, 201, 641-643, 2010.
-
(2010)
European Journal of Operational Research
, vol.201
, pp. 641-643
-
-
Chiu, Y.-S.P.1
Ting, C.-K.2
-
13
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T. C. E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transaction, 23, 23-28, 1991.
-
(1991)
IIE Transaction
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
14
-
-
68649107898
-
Incorporating multi-delivery policy and quality assurance into economic production lot size problem
-
Y-S. P. Chiu, S. W. Chiu, C-Y. Li, and C-K. Ting, Incorporating multi-delivery policy and quality assurance into economic production lot size problem, Journal of Scientific & Industrial Research, 68, 505-512, 2009.
-
(2009)
Journal of Scientific & Industrial Research
, vol.68
, pp. 505-512
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Li, C.-Y.3
Ting, C.-K.4
-
17
-
-
0035906315
-
The economic production quantity (EPQ) with shortage derived algebraically
-
L. E. Cádenas-Barró, The economic production quantity (EPQ) with shortage derived algebraically, International Journal of Production Economics, 70, 289-292, 2001.
-
(2001)
International Journal of Production Economics
, vol.70
, pp. 289-292
-
-
Cádenas-Barró, L.E.1
|