메뉴 건너뛰기




Volumn 23, Issue 1, 2011, Pages 48-63

A production policy considering reworking of imperfect items and trade credit

Author keywords

Imperfect quality items; Inventory; Production; Reworking; Trade credit

Indexed keywords

BUSINESS ENVIRONMENTS; IMPERFECT QUALITY; INVENTORY; NUMERICAL EXAMPLE; OPTIMAL PRODUCTION; PAYMENT METHODS; PRODUCTION DECISIONS; PRODUCTION MODELS; PRODUCTION POLICY; PRODUCTION PROBLEMS; REWORKING; SOLUTION PROCEDURE; TOTAL COSTS; TRADE CREDIT;

EID: 79956346270     PISSN: 19366582     EISSN: 19366590     Source Type: Journal    
DOI: 10.1007/s10696-010-9070-3     Document Type: Article
Times cited : (14)

References (28)
  • 1
    • 0345872325 scopus 로고    scopus 로고
    • A new EPQ model: Integrating lower pricing, rework and reject situations
    • 10.1080/09537280310001626179
    • WM Chan RN Ibrahim PB Lochert 2003 A new EPQ model: integrating lower pricing, rework and reject situations Prod Plan Control 14 7 588 595 10.1080/09537280310001626179
    • (2003) Prod Plan Control , vol.14 , Issue.7 , pp. 588-595
    • Chan, W.M.1    Ibrahim, R.N.2    Lochert, P.B.3
  • 2
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • 10.1080/03052150310001597783
    • YP Chiu 2003 Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging Eng Optim 35 4 427 437 10.1080/03052150310001597783
    • (2003) Eng Optim , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 3
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • DOI 10.1002/asmb.664
    • SW Chiu 2007 Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging Appl Stoch Models Bus Ind 23 165 178 10.1002/asmb.664 1164.90010 2368442 (Pubitemid 46693376)
    • (2007) Applied Stochastic Models in Business and Industry , vol.23 , Issue.2 , pp. 165-178
    • Chiu, S.W.1
  • 4
    • 46449088127 scopus 로고    scopus 로고
    • An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
    • 10.1002/asmb.699 1199.90010 2522166
    • SW Chiu 2008 An optimization problem of manufacturing systems with stochastic machine breakdown and rework process Appl Stoch Models Bus Ind 24 203 219 10.1002/asmb.699 1199.90010 2522166
    • (2008) Appl Stoch Models Bus Ind , vol.24 , pp. 203-219
    • Chiu, S.W.1
  • 5
    • 8744223416 scopus 로고    scopus 로고
    • Effects of random defective rate and imperfect rework process on economic production quantity model
    • SW Chiu DC Gong HM Wee 2004 Effects of random defective rate and imperfect rework process on economic production quantity model Jpn J Ind Appl Math 21 3 375 389 10.1007/BF03167589 1080.91048 2095778 (Pubitemid 39519060)
    • (2004) Japan Journal of Industrial and Applied Mathematics , vol.21 , Issue.3 , pp. 375-389
    • Chiu, S.W.1    Gong, D.-C.2    Wee, H.-M.3
  • 7
    • 0038515381 scopus 로고    scopus 로고
    • The optimal cycle time for EPQ inventory model under permissible delay in payments
    • KJ Chung YF Huang 2003 The optimal cycle time for EPQ inventory model under permissible delay in payments Int J Prod Econ 84 307 318
    • (2003) Int J Prod Econ , vol.84 , pp. 307-318
    • Chung, K.J.1    Huang, Y.F.2
  • 8
    • 29344473050 scopus 로고    scopus 로고
    • Retailer's optimal cycle times in the EOQ model with imperfect quality and a permissible credit period
    • 10.1007/s11135-005-5356-z
    • KJ Chung YF Huang 2006 Retailer's optimal cycle times in the EOQ model with imperfect quality and a permissible credit period Qual Quant 40 59 77 10.1007/s11135-005-5356-z
    • (2006) Qual Quant , vol.40 , pp. 59-77
    • Chung, K.J.1    Huang, Y.F.2
  • 9
    • 0022045262 scopus 로고
    • Economics order quantity under conditions of permissible delay in payments
    • SK Goyal 1985 Economics order quantity under conditions of permissible delay in payments J Oper Res Soc 36 335 338 0568.90025 (Pubitemid 15513977)
    • (1985) Journal of the Operational Research Society , vol.36 , Issue.4 , pp. 335-338
    • Goyal, S.K.1
  • 10
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • DOI 10.1080/095372801750397707
    • PA Hayek MK Salameh 2001 Production lot sizing with the reworking of imperfect quality items produced Prod Plan Control 12 6 584 590 10.1080/095372801750397707 (Pubitemid 35395061)
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 11
    • 0042358655 scopus 로고    scopus 로고
    • Optimal retailer's ordering policies in the EOQ model under trade credit financing
    • DOI 10.1057/palgrave.jors.2601588, Modelling Organizational Knowledge
    • YF Huang 2003 Optimal retailer's ordering policies in the EOQ model under trade credit financing J Oper Res Soc 54 1011 1015 10.1057/palgrave.jors. 2601588 1097.90501 (Pubitemid 37053437)
    • (2003) J Oper Res Soc , vol.54 , Issue.9 , pp. 1011-1015
    • Huang, Y.-F.1
  • 12
    • 33144467467 scopus 로고    scopus 로고
    • An inventory model under two levels of trade credit and limited storage space derived without derivatives
    • DOI 10.1016/j.apm.2005.05.009, PII S0307904X05000983
    • YF Huang 2006 An inventory model under two levels of trade credit and limited storage space derived without derivatives Appl Mathematical Modeling 30 418 436 10.1016/j.apm.2005.05.009 1182.90007 (Pubitemid 43264637)
    • (2006) Applied Mathematical Modelling , vol.30 , Issue.5 , pp. 418-436
    • Huang, Y.-F.1
  • 13
    • 33750030697 scopus 로고    scopus 로고
    • Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy
    • DOI 10.1016/j.ejor.2005.10.035, PII S0377221705008696
    • YF Huang 2007 Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy Eur J Oper Res 176 1577 1591 10.1016/j.ejor.2005.10.035 1110.90007 (Pubitemid 44573668)
    • (2007) European Journal of Operational Research , vol.176 , Issue.3 , pp. 1577-1591
    • Huang, Y.-F.1
  • 14
    • 0344466650 scopus 로고    scopus 로고
    • Optimal replenishment and payment policies in the EOQ model under cash discount and trade credit
    • 1165.90319 2021521
    • YF Huang KJ Chung 2003 Optimal replenishment and payment policies in the EOQ model under cash discount and trade credit Asia-Pac J Operational Res 20 177 190 1165.90319 2021521
    • (2003) Asia-Pac J Operational Res , vol.20 , pp. 177-190
    • Huang, Y.F.1    Chung, K.J.2
  • 15
    • 34249688614 scopus 로고    scopus 로고
    • Economic ordering policy for an item with imperfect quality subject to the in-house inspection
    • DOI 10.1080/00207720701352837, PII 779087603
    • I Konstantaras SK Goyal S Papachristos 2007 Economic ordering policy for an item with imperfect quality subject to the in-house inspection Int J Syst Sci 38 6 473 482 10.1080/00207720701352837 1148.90302 (Pubitemid 46842756)
    • (2007) International Journal of Systems Science , vol.38 , Issue.6 , pp. 473-482
    • Konstantaras, I.1    Goyal, S.K.2    Papachristos, S.3
  • 16
    • 43549120249 scopus 로고    scopus 로고
    • An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit
    • 10.1016/j.ijpe.2007.09.006
    • JJ Liao 2008 An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit Int J Prod Econ 113 852 861 10.1016/j.ijpe.2007.09.006
    • (2008) Int J Prod Econ , vol.113 , pp. 852-861
    • Liao, J.J.1
  • 17
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • DOI 10.1016/0377-2217(94)00339-4
    • JJ Liu P Yang 1996 Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs Eur J Oper Res 91 517 527 10.1016/0377-2217(94) 00339-4 0924.90085 (Pubitemid 126393163)
    • (1996) European Journal of Operational Research , vol.91 , Issue.3 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 19
    • 18944385926 scopus 로고    scopus 로고
    • An EOQ model for deteriorating items under trade credits
    • DOI 10.1057/palgrave.jors.2601881
    • LY Ouyang CT Chang JT Teng 2005 An EOQ model for deteriorating items under trade credits J Oper Res Soc 56 719 726 10.1057/palgrave.jors.2601881 1095.90007 (Pubitemid 40703472)
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.6 , pp. 719-726
    • Ouyang, L.-Y.1    Chang, C.-T.2    Teng, J.-T.3
  • 20
    • 33751160850 scopus 로고    scopus 로고
    • An study on an inventory model for non-instantaneous deteriorating item with permissible delay in payments
    • 10.1016/j.cie.2006.07.012
    • LY Ouyang KS Wu CT Yang 2006 An study on an inventory model for non-instantaneous deteriorating item with permissible delay in payments Comput Ind Eng 51 637 651 10.1016/j.cie.2006.07.012
    • (2006) Comput Ind Eng , vol.51 , pp. 637-651
    • Ouyang, L.Y.1    Wu, K.S.2    Yang, C.T.3
  • 21
    • 49249098235 scopus 로고    scopus 로고
    • Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity
    • 10.1016/j.ijpe.2008.04.012
    • LY Ouyang CH Ho CH Su 2008 Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity Int J Prod Econ 115 151 162 10.1016/j.ijpe.2008.04.012
    • (2008) Int J Prod Econ , vol.115 , pp. 151-162
    • Ouyang, L.Y.1    Ho, C.H.2    Su, C.H.3
  • 22
    • 54449091616 scopus 로고    scopus 로고
    • An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity
    • 10.1016/j.ejor.2007.12.018 1154.90309 2468457
    • LY Ouyang JT Teng SK Goyal CT Yang 2009 An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity Eur J Oper Res 194 418 431 10.1016/j.ejor.2007.12.018 1154.90309 2468457
    • (2009) Eur J Oper Res , vol.194 , pp. 418-431
    • Ouyang, L.Y.1    Teng, J.T.2    Goyal, S.K.3    Yang, C.T.4
  • 23
    • 33845380073 scopus 로고    scopus 로고
    • Channel coordination, trade credit and quantity discounts for freight cost
    • DOI 10.1016/j.tre.2005.08.001, PII S1366554505000712
    • GJ Sheen YC Tsao 2007 Channel coordination, trade credit and quantity discounts for freight cost Transp Res Part E: Logist Transport Rev 43 112 128 10.1016/j.tre.2005.08.001 (Pubitemid 44890830)
    • (2007) Transportation Research Part E: Logistics and Transportation Review , vol.43 , Issue.2 , pp. 112-128
    • Sheen, G.-J.1    Tsao, Y.-C.2
  • 24
    • 0036682157 scopus 로고    scopus 로고
    • On the economic order quantity under conditions of permissible delay in payments
    • DOI 10.1057/palgrave.jors.2601410
    • JT Teng 2002 On the economic order quantity under conditions of permissible delay in payments J Oper Res Soc 53 915 918 10.1057/palgrave.jors. 2601410 1098.90006 (Pubitemid 34838792)
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.8 , pp. 915-918
    • Teng, J.-T.1
  • 25
    • 66049129627 scopus 로고    scopus 로고
    • Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers
    • 10.1016/j.ijpe.2009.04.004
    • JT Teng 2009 Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers Int J Prod Econ 119 415 423 10.1016/j.ijpe.2009.04.004
    • (2009) Int J Prod Econ , vol.119 , pp. 415-423
    • Teng, J.T.1
  • 26
    • 56249101399 scopus 로고    scopus 로고
    • Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy
    • 10.1016/j.ejor.2008.02.001 1159.90009 2468662
    • JT Teng CT Chang 2009 Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy Eur J Oper Res 195 358 363 10.1016/j.ejor.2008.02.001 1159.90009 2468662
    • (2009) Eur J Oper Res , vol.195 , pp. 358-363
    • Teng, J.T.1    Chang, C.T.2
  • 27
    • 34547381735 scopus 로고    scopus 로고
    • Joint pricing and replenishment decisions for deteriorating items with lot-size and time-dependent purchasing cost under credit period
    • DOI 10.1080/00207720701431144, PII 779825225
    • YC Tsao GJ Sheen 2007 Joint pricing and replenishment decisions for deteriorating items with lot-size and time dependent purchasing cost under credit period Int J Syst Sci 38 549 561 10.1080/00207720701431144 1148.90316 2331089 (Pubitemid 47147658)
    • (2007) International Journal of Systems Science , vol.38 , Issue.7 , pp. 549-561
    • Tsao, Y.-C.1    Sheen, G.-J.2
  • 28
    • 41149087870 scopus 로고    scopus 로고
    • Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments
    • DOI 10.1016/j.cor.2007.01.024, PII S030505480700038X
    • YC Tsao GJ Sheen 2008 Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments Comput Oper Res 35 3562 3580 10.1016/j.cor.2007.01.024 1140.91358 (Pubitemid 351443063)
    • (2008) Computers and Operations Research , vol.35 , Issue.11 , pp. 3562-3580
    • Tsao, Y.-C.1    Sheen, G.-J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.