메뉴 건너뛰기




Volumn 139, Issue 1, 2012, Pages 247-256

Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit

Author keywords

Complete backlogging; Defective items; Return policy; Supply chain; Trade credit

Indexed keywords

COMPLETE BACKLOGGING; DECISION VARIABLES; DEFECTIVE ITEMS; INSPECTION POLICIES; INTEGRATED INVENTORY; INTEGRATED INVENTORY MODEL; MAIN PARAMETERS; NUMERICAL EXAMPLE; OPTIMAL SUPPLY CHAIN; OUT OF STOCK; REPLENISHMENT CYCLE; REPLENISHMENT POLICY; RETURN POLICY; SOLUTION PROCEDURE; TRADE CREDIT; TWO-ECHELON INVENTORY;

EID: 84863200769     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.05.001     Document Type: Article
Times cited : (51)

References (57)
  • 2
    • 21844488130 scopus 로고
    • Ordering policies of deteriorating items under permissible delay in payments
    • S.P. Aggarwal, and C.K. Jaggi Ordering policies of deteriorating items under permissible delay in payments Journal of the Operational Research Society 46 5 1995 658 662
    • (1995) Journal of the Operational Research Society , vol.46 , Issue.5 , pp. 658-662
    • Aggarwal, S.P.1    Jaggi, C.K.2
  • 3
    • 2142662250 scopus 로고    scopus 로고
    • An optimal solution of a general lot size inventory model with deteriorated and imperfect products, taking into account inflation and time value of money
    • Z.T. Balkhi An optimal solution of a general lot size inventory model with deteriorated and imperfect products, taking into account inflation and time value of money International Journal of Systems Science 35 2 2004 87 96
    • (2004) International Journal of Systems Science , vol.35 , Issue.2 , pp. 87-96
    • Balkhi, Z.T.1
  • 4
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • A. Banerjee A joint economic-lot-size model for purchaser and vendor Decision Sciences 17 3 1986 292 311
    • (1986) Decision Sciences , vol.17 , Issue.3 , pp. 292-311
    • Banerjee, A.1
  • 5
    • 0345446039 scopus 로고    scopus 로고
    • Fuzzy opportunity cost for EOQ model with quality improvement investment
    • H.C. Chang Fuzzy opportunity cost for EOQ model with quality improvement investment International Journal of Systems Science 34 6 2003 395 402
    • (2003) International Journal of Systems Science , vol.34 , Issue.6 , pp. 395-402
    • Chang, H.C.1
  • 6
    • 75849158465 scopus 로고    scopus 로고
    • Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme
    • L. Chen, and F. Kang Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme European Journal of Operational Research 205 2010 47 58
    • (2010) European Journal of Operational Research , vol.205 , pp. 47-58
    • Chen, L.1    Kang, F.2
  • 7
    • 70449521211 scopus 로고    scopus 로고
    • Coordination between vendor and buyer considering trade credit and items of imperfect quality
    • L. Chen, and F. Kang Coordination between vendor and buyer considering trade credit and items of imperfect quality International Journal of Production Economics 123 1 2010 52 61
    • (2010) International Journal of Production Economics , vol.123 , Issue.1 , pp. 52-61
    • Chen, L.1    Kang, F.2
  • 8
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y.P. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging Engineering Optimization 35 4 2003 427 437
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 9
    • 80051594167 scopus 로고    scopus 로고
    • Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
    • Y.S. Chiu, S.C. Liu, C.L. Chiu, and H.H. Chang Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments Mathematical and Computer Modelling 54 2011 2165 2174
    • (2011) Mathematical and Computer Modelling , vol.54 , pp. 2165-2174
    • Chiu, Y.S.1    Liu, S.C.2    Chiu, C.L.3    Chang, H.H.4
  • 10
    • 37148998722 scopus 로고    scopus 로고
    • Scheduling and replenishment plan for an integrated deteriorating inventory model with stock-dependent selling rate
    • C.J. Chung, and H.W. Wee Scheduling and replenishment plan for an integrated deteriorating inventory model with stock-dependent selling rate The International Journal of Advanced Manufacturing Technology 35 7 2008 665 679
    • (2008) The International Journal of Advanced Manufacturing Technology , vol.35 , Issue.7 , pp. 665-679
    • Chung, C.J.1    Wee, H.W.2
  • 11
    • 27144436838 scopus 로고    scopus 로고
    • Joint optimization of process improvement investments for manufacture-buyer cooperative commerce
    • E.J. Comeaux, and B.R. Sarker Joint optimization of process improvement investments for manufacture-buyer cooperative commerce Journal of the Operational Research Society 56 2005 1310 1324
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 1310-1324
    • Comeaux, E.J.1    Sarker, B.R.2
  • 12
  • 13
    • 84155172185 scopus 로고    scopus 로고
    • Coordination of a production net work with a single buyer and multiple vendors
    • C.H. Glock Coordination of a production net work with a single buyer and multiple vendors International Journal of Production Economics 135 2012 771 780
    • (2012) International Journal of Production Economics , vol.135 , pp. 771-780
    • Glock, C.H.1
  • 14
    • 78650550490 scopus 로고    scopus 로고
    • A multiple-vendor single-buyer integrated inventory model with a variable number of vendors
    • C.H. Glock A multiple-vendor single-buyer integrated inventory model with a variable number of vendors Computers & Industrial Engineering 60 2011 173 182
    • (2011) Computers & Industrial Engineering , vol.60 , pp. 173-182
    • Glock, C.H.1
  • 15
    • 0017416997 scopus 로고
    • An integrated inventory model for a single manufacture-single customer problem
    • S.K. Goyal An integrated inventory model for a single manufacture-single customer problem International Journal of Production Research 15 1 1976 107 111
    • (1976) International Journal of Production Research , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 16
    • 0022045262 scopus 로고
    • Economic order quantity under conditions of permissible delay in payment
    • S.K. Goyal Economic order quantity under conditions of permissible delay in payment Journal of the Operational Research Society 36 1985 335 338
    • (1985) Journal of the Operational Research Society , vol.36 , pp. 335-338
    • Goyal, S.K.1
  • 17
    • 84985781712 scopus 로고
    • A joint economic lot size model for purchaser and vendor: A comment
    • S.K. Goyal A joint economic lot size model for purchaser and vendor: a comment Decision Sciences 19 1988 236 241
    • (1988) Decision Sciences , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 18
    • 0001539415 scopus 로고
    • A one-vendor multi-buyer integrated inventory model: A comment
    • S.K. Goyal A one-vendor multi-buyer integrated inventory model: a comment European Journal of Operational Research 82 1 1995 209 210
    • (1995) European Journal of Operational Research , vol.82 , Issue.1 , pp. 209-210
    • Goyal, S.K.1
  • 19
    • 0033723604 scopus 로고    scopus 로고
    • On improving the single-vendor single-buyer integrated production inventory model with a generalized policy
    • S.K. Goyal On improving the single-vendor single-buyer integrated production inventory model with a generalized policy European Journal of Operational Research 125 2000 429 430
    • (2000) European Journal of Operational Research , vol.125 , pp. 429-430
    • Goyal, S.K.1
  • 20
    • 0343081532 scopus 로고    scopus 로고
    • Determination of economic production-shipment policy for a single-vendor-single-buyer system
    • S.K. Goyal, and F. Nebebe Determination of economic production-shipment policy for a single-vendor-single-buyer system European Journal of Operational Research 121 2000 175 178
    • (2000) European Journal of Operational Research , vol.121 , pp. 175-178
    • Goyal, S.K.1    Nebebe, F.2
  • 21
    • 0031103642 scopus 로고    scopus 로고
    • Implementation of JIT purchasing: An integrated approach
    • D. Ha, and S.L. Kim Implementation of JIT purchasing: an integrated approach Production Planning & Control 8 2 1997 152 157
    • (1997) Production Planning & Control , vol.8 , Issue.2 , pp. 152-157
    • Ha, D.1    Kim, S.L.2
  • 22
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem
    • R.M. Hill The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem International Journal of Production Research 37 11 1999 2463 2475
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2463-2475
    • Hill, R.M.1
  • 23
    • 38649120479 scopus 로고    scopus 로고
    • Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain
    • M.A. Hoque Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain European Journal of Operational Research 188 2008 811 825
    • (2008) European Journal of Operational Research , vol.188 , pp. 811-825
    • Hoque, M.A.1
  • 24
    • 2142764540 scopus 로고    scopus 로고
    • Optimal production run length and capital investment in quality improvement with an imperfect production process
    • K.L. Hou, and L.C. Lin Optimal production run length and capital investment in quality improvement with an imperfect production process International Journal of Systems Science 35 2 2004 133 137
    • (2004) International Journal of Systems Science , vol.35 , Issue.2 , pp. 133-137
    • Hou, K.L.1    Lin, L.C.2
  • 25
    • 3242717595 scopus 로고    scopus 로고
    • An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration
    • C.K. Huang An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration International Journal of Production Economics 91 2004 91 98
    • (2004) International Journal of Production Economics , vol.91 , pp. 91-98
    • Huang, C.K.1
  • 26
    • 0042358655 scopus 로고    scopus 로고
    • Optimal retailers ordering policies in the EOQ model under trade credit financing
    • Y.F. Huang Optimal retailers ordering policies in the EOQ model under trade credit financing Journal of the Operational Research Society 54 9 2003 1011 1015
    • (2003) Journal of the Operational Research Society , vol.54 , Issue.9 , pp. 1011-1015
    • Huang, Y.F.1
  • 27
    • 0031200313 scopus 로고    scopus 로고
    • An ordering policy for deteriorating items with allowable shortages and permissible delay in payment
    • A.M.M. Jamal, B.R. Sarker, and S. Wang An ordering policy for deteriorating items with allowable shortages and permissible delay in payment Journal of the Operational Research Society 48 8 1997 826 833
    • (1997) Journal of the Operational Research Society , vol.48 , Issue.8 , pp. 826-833
    • Jamal, A.M.M.1    Sarker, B.R.2    Wang, S.3
  • 28
  • 31
    • 0029219203 scopus 로고
    • An optimal credit policy to increase wholesalers profit with price dependent demand function
    • J.S. Kim, H. Hwang, and S.W. Shinn An optimal credit policy to increase wholesalers profit with price dependent demand function Production Planning & Control 6 1995 45 50
    • (1995) Production Planning & Control , vol.6 , pp. 45-50
    • Kim, J.S.1    Hwang, H.2    Shinn, S.W.3
  • 32
    • 0041862633 scopus 로고    scopus 로고
    • A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage. International
    • S.L. Kim, and D. Ha A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage. International Journal of Production Economics 86 2003 1 10
    • (2003) Journal of Production Economics , vol.86 , pp. 1-10
    • Kim, S.L.1    Ha, D.2
  • 33
    • 70350504288 scopus 로고    scopus 로고
    • A replenishment policy with defective products, backlog and delay of payments
    • J. Li, H. Feng, and M. Wang A replenishment policy with defective products, backlog and delay of payments Journal of Industrial and Management Optimization 5 4 2009 867 880
    • (2009) Journal of Industrial and Management Optimization , vol.5 , Issue.4 , pp. 867-880
    • Li, J.1    Feng, H.2    Wang, M.3
  • 34
    • 33846409121 scopus 로고    scopus 로고
    • An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation
    • S.T. Lo, H.M. Wee, and W.C. Huang An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation International Journal of Production Economics 106 1 2007 248 260
    • (2007) International Journal of Production Economics , vol.106 , Issue.1 , pp. 248-260
    • Lo, S.T.1    Wee, H.M.2    Huang, W.C.3
  • 35
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • L. Lu A one-vendor multi-buyer integrated inventory model European Journal of Operational Research 81 1995 312 323
    • (1995) European Journal of Operational Research , vol.81 , pp. 312-323
    • Lu, L.1
  • 36
    • 39649124927 scopus 로고    scopus 로고
    • Economic order quantity for items with imperfect quality: Revisited
    • B. Maddah, and M.Y. Jaber Economic order quantity for items with imperfect quality: revisited International Journal of Production Economics 112 2008 808 815
    • (2008) International Journal of Production Economics , vol.112 , pp. 808-815
    • Maddah, B.1    Jaber, M.Y.2
  • 37
    • 0036778937 scopus 로고    scopus 로고
    • Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
    • L.Y. Ouyang, C.K. Chen, and H.C. Chang Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process Computers and Operations Research 29 2002 1701 1717
    • (2002) Computers and Operations Research , vol.29 , pp. 1701-1717
    • Ouyang, L.Y.1    Chen, C.K.2    Chang, H.C.3
  • 38
    • 28844488333 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model with adjustable production rate and trade credit
    • L.Y. Ouyang, C.H. Ho, and C.H. Su Optimal strategy for the integrated vendor-buyer inventory model with adjustable production rate and trade credit International Journal of Information and Management Sciences 16 4 2005 19 37
    • (2005) International Journal of Information and Management Sciences , vol.16 , Issue.4 , pp. 19-37
    • Ouyang, L.Y.1    Ho, C.H.2    Su, C.H.3
  • 39
    • 69849095974 scopus 로고    scopus 로고
    • An optimization approach for joint pricing and ordering problem in an integrated inventory system with order-size dependent trade credit
    • L.Y. Ouyang, C.H. Ho, and C.H. Su An optimization approach for joint pricing and ordering problem in an integrated inventory system with order-size dependent trade credit Computers & Industrial Engineering 57 2009 920 930
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 920-930
    • Ouyang, L.Y.1    Ho, C.H.2    Su, C.H.3
  • 40
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • J.C.H. Pan, and J.S. Yang A study of an integrated inventory with controllable lead time International Journal of Production Research 40 5 2002 1263 1273
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, J.C.H.1    Yang, J.S.2
  • 43
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • E.L. Porteus Optimal lot sizing, process quality improvement and setup cost reduction Operations Research 34 1986 137 144
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 44
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production process
    • M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production process IIE Transactions 18 1986 48 55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 46
    • 55149099211 scopus 로고    scopus 로고
    • Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers
    • B.R. Sarker, and A. Diponegoro Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers European Journal of Operational Research 194 2009 753 773
    • (2009) European Journal of Operational Research , vol.194 , pp. 753-773
    • Sarker, B.R.1    Diponegoro, A.2
  • 49
    • 0142246397 scopus 로고    scopus 로고
    • Quality strategies in supply chain alliances of disposable items
    • M. Singer, P. Donoso, and P. Traverso Quality strategies in supply chain alliances of disposable items Omega 31 2003 499 509
    • (2003) Omega , vol.31 , pp. 499-509
    • Singer, M.1    Donoso, P.2    Traverso, P.3
  • 50
    • 37249008640 scopus 로고    scopus 로고
    • Retailers inventory policy and manufactures delivery policy under two-level trade credit strategy
    • C.H. Su, L.Y. Ouyang, C.H. Ho, and C.T. Chang Retailers inventory policy and manufactures delivery policy under two-level trade credit strategy Asia-Pacific Journal of Operational Research 24 5 2007 613 630
    • (2007) Asia-Pacific Journal of Operational Research , vol.24 , Issue.5 , pp. 613-630
    • Su, C.H.1    Ouyang, L.Y.2    Ho, C.H.3    Chang, C.T.4
  • 51
    • 0036682157 scopus 로고    scopus 로고
    • On the economic order quantity under conditions of permissible delay in payments
    • J.T. Teng On the economic order quantity under conditions of permissible delay in payments Journal of the Operational Research Society 53 2002 915 918
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 915-918
    • Teng, J.T.1
  • 53
    • 0032002459 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model
    • S. Viswanathan Optimal strategy for the integrated vendor-buyer inventory model European Journal of Operational Research 105 1998 38 42
    • (1998) European Journal of Operational Research , vol.105 , pp. 38-42
    • Viswanathan, S.1
  • 54
    • 0035886951 scopus 로고    scopus 로고
    • An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction
    • Y.Y. Woo, S.L. Hsu, and S. Wu An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction International Journal of Production Economics 73 2001 203 215
    • (2001) International Journal of Production Economics , vol.73 , pp. 203-215
    • Woo, Y.Y.1    Hsu, S.L.2    Wu, S.3
  • 55
    • 0034161082 scopus 로고    scopus 로고
    • Defective units in (Q,r,L) inventory model with sub-lot sampling inspection
    • K.S. Wu, and L.Y. Ouyang Defective units in (Q,r,L) inventory model with sub-lot sampling inspection Production Planning & Control 11 2 2000 179 186
    • (2000) Production Planning & Control , vol.11 , Issue.2 , pp. 179-186
    • Wu, K.S.1    Ouyang, L.Y.2
  • 56
    • 3042773343 scopus 로고    scopus 로고
    • On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers
    • M.J. Yao, and C.C. Chiou On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers European Journal of Operational Research 159 2 2004 406 419
    • (2004) European Journal of Operational Research , vol.159 , Issue.2 , pp. 406-419
    • Yao, M.J.1    Chiou, C.C.2
  • 57
    • 84877581623 scopus 로고    scopus 로고
    • A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits
    • in press
    • Yu, J.C.P. A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits. International Journal of Production Economics, http://dx.doi.org/10.1016/j.ijpe.2011.11.018, in press.
    • International Journal of Production Economics
    • Yu, J.C.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.