메뉴 건너뛰기




Volumn 136, Issue 1, 2010, Pages 36-48

Empirical modeling methodologies for construction

Author keywords

Data analysis; Data collection; Development algorithm; Dynamic model; Empirical modeling; Model validation; Static model; Structured model

Indexed keywords

DATA ANALYSIS; DATA COLLECTION; DEVELOPMENT ALGORITHM; EMPIRICAL MODELING; MODEL VALIDATION; STATIC MODEL; STRUCTURED MODEL;

EID: 75649148810     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000138     Document Type: Article
Times cited : (25)

References (23)
  • 2
    • 47749141840 scopus 로고    scopus 로고
    • Model for predicting the performance of project managers at the construction phase of mass house building projects
    • 0733-9364. 10.1061/(ASCE)0733-9364(2008)134:8(618)
    • Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. O. (2008). " Model for predicting the performance of project managers at the construction phase of mass house building projects.." J. Constr. Eng. Manage. 0733-9364, 134, 618-629. 10.1061/(ASCE)0733-9364(2008)134:8(618)
    • (2008) J. Constr. Eng. Manage. , vol.134 , pp. 618-629
    • Ahadzie, D.K.1    Proverbs, D.G.2    Olomolaiye, P.O.3
  • 3
    • 33746190820 scopus 로고    scopus 로고
    • A study of styles and outcomes in construction dispute negotiation
    • DOI 10.1061/(ASCE)0733-9364(2006)132:8(805)
    • Cheung, S. O., Yiu, T. W. Y., and Yeung, S. F. (2006). " A study of styles and outcomes in construction dispute negotiation.." J. Constr. Eng. Manage. 0733-9364, 132, 805-814. 10.1061/(ASCE)0733-9364(2006)132:8(805) (Pubitemid 44090927)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.8 , pp. 805-814
    • Cheung, S.O.1    Yiu, T.W.Y.2    Yeung, S.F.3
  • 4
    • 35048842781 scopus 로고
    • Pattern recognition with a pulsed neural network
    • ASM International, Materials Park, Ohio.
    • Dayhoff, J. (1991). " Pattern recognition with a pulsed neural network.." Proc., Conf. on Analysis of Neural Network Applications, ASM International, Materials Park, Ohio, 146-159.
    • (1991) Proc., Conf. on Analysis of Neural Network Applications , pp. 146-159
    • Dayhoff, J.1
  • 5
    • 33646734043 scopus 로고    scopus 로고
    • Neural networks for estimating the productivity of voncreting activities
    • DOI 10.1061/(ASCE)0733-9364(2006)132:6(650)
    • Ezeldin, A. S., and Sharara, L. M. (2006). " Neural networks for estimating the productivity of concreting activities.." J. Constr. Eng. Manage. 0733-9364, 132, 650-656. 10.1061/(ASCE)0733-9364(2006)132:6(650) (Pubitemid 43747850)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 650-656
    • Ezeldin, A.S.1    Sharara, L.M.2
  • 6
    • 33646740374 scopus 로고    scopus 로고
    • Safety climate in construction industry: A case study in Hong Kong
    • DOI 10.1061/(ASCE)0733-9364(2006)132:6(573)
    • Fang, D., Chen, Y., and Wong, L. (2006). " Safety climate in construction industry: A case study in Hong Kong.." J. Constr. Eng. Manage. 0733-9364, 132, 573-584. 10.1061/(ASCE)0733-9364(2006)132:6(573) (Pubitemid 43747842)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 573-584
    • Fang, D.1    Chen, Y.2    Wong, L.3
  • 7
    • 13944256990 scopus 로고    scopus 로고
    • Risk assessment model of tendering for Chinese building projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(862)
    • Fang, D., Fong, P. S., and Li, M. (2004). " Risk assessment model of tendering for Chinese building projects.." J. Constr. Eng. Manage. 0733-9364, 130, 862-868. 10.1061/(ASCE)0733-9364(2004)130:6(862) (Pubitemid 40265319)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 862-868
    • Fang, D.1    Fong, P.S.-W.2    Li, M.3
  • 9
    • 0029776114 scopus 로고    scopus 로고
    • Modeling construction processes using artificial neural networks
    • Elsevier Science, New York.
    • Flood, I., and Christophilos, P. (1996). " Modeling construction processes using artificial neural networks.." Automation in construction, Vol. 4, Elsevier Science, New York, 307-320.
    • (1996) Automation in Construction , vol.4 , pp. 307-320
    • Flood, I.1    Christophilos, P.2
  • 10
    • 16444380453 scopus 로고    scopus 로고
    • Simulating the thermal behavior of buildings using artificial neural networks-based coarse-grain modeling
    • DOI 10.1061/(ASCE)0887-3801(2004)18:3(207)
    • Flood, I., Issa, R. R. A., and Abi-Shdid, C. (2004). " Simulating the thermal behavior of buildings using artificial neural networks-based coarse-grain modeling.." J. Comput. Civ. Eng. 0887-3801, 18, 207-214. 10.1061/(ASCE)0887-3801(2004)18:3(207) (Pubitemid 40475417)
    • (2004) Journal of Computing in Civil Engineering , vol.18 , Issue.3 , pp. 207-214
    • Flood, I.1    Issa, R.R.A.2    Abi-Shdid, C.3
  • 13
    • 34248590966 scopus 로고    scopus 로고
    • Predicting profit performance for selecting candidate international construction projects
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(425)
    • Han, S. H., Kim, D. Y., and Kim, H. (2007). " Predicting profit performance for selecting candidate international construction projects.." J. Constr. Eng. Manage. 0733-9364, 133, 425-436. 10.1061/(ASCE)0733-9364(2007) 133:6(425) (Pubitemid 46753482)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 425-436
    • Han, S.H.1    Kim, D.Y.2    Kim, H.3
  • 14
    • 33947408281 scopus 로고    scopus 로고
    • Dynamic prediction of project success using artificial intelligence
    • DOI 10.1061/(ASCE)0733-9364(2007)133:4(316)
    • Ko, C. H., and Cheng, M. Y. (2007). " Dynamic prediction of project success using artificial intelligence.." J. Constr. Eng. Manage. 0733-9364, 133, 316-324. 10.1061/(ASCE)0733-9364(2007)133:4(316) (Pubitemid 46447967)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.4 , pp. 316-324
    • Ko, C.-H.1    Cheng, M.-Y.2
  • 15
    • 33745325166 scopus 로고    scopus 로고
    • Predicting construction cost using multiple regression techniques
    • DOI 10.1061/(ASCE)0733-9364(2006)132:7(750), 002607QCO
    • Lowe, D. J., Emsley, M. W., and Harding, A. (2006). " Predicting construction cost using multiple regression techniques.." J. Constr. Eng. Manage. 0733-9364, 132, 750-758. 10.1061/(ASCE)0733-9364(2006)132:7(750) (Pubitemid 43932181)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 750-758
    • Lowe, D.J.1    Emsley, M.W.2    Harding, A.3
  • 16
    • 13944282080 scopus 로고    scopus 로고
    • Fuzzy clustering model for estimating haulers' travel time
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(878)
    • Marzouk, M., and Moselhi, O. (2004). " Fuzzy clustering model for estimating Haulers' travel time.." J. Constr. Eng. Manage. 0733-9364, 130, 878-886. 10.1061/(ASCE)0733-9364(2004)130:6(878) (Pubitemid 40265321)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 878-886
    • Marzouk, M.1    Moselhi, O.2
  • 18
    • 36249023087 scopus 로고    scopus 로고
    • Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models
    • DOI 10.1061/(ASCE)0733-9364(2007)133:12(982)
    • Salem, O., Shahin, A., and Khalifa, Y. (2007). " Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models.." J. Constr. Eng. Manage. 0733-9364, 133, 982-992. 10.1061/(ASCE)0733-9364(2007)133:12(982) (Pubitemid 350129071)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.12 , pp. 982-992
    • Salem, O.1    Shahin, A.2    Khalifa, Y.3
  • 19
    • 37249019506 scopus 로고    scopus 로고
    • Drivers for cost estimating in early design: Case study of residential construction
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(32)
    • Stoy, C., Pollalis, S., and Schalcher, H. R. (2008). " Drivers for cost estimating in early design: Case study of residential construction.." J. Constr. Eng. Manage. 0733-9364, 134, 32-39. 10.1061/(ASCE)0733-9364(2008)134: 1(32) (Pubitemid 350265376)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 32-39
    • Stoy, C.1    Pollalis, S.2    Schalcher, H.-R.3
  • 21
    • 49749086560 scopus 로고    scopus 로고
    • Modeling and forecasting construction labor demand: Multivariate analysis
    • 0733-9364. 10.1061/(ASCE)0733-9364(2008)134:9(664)
    • Wong, J. M. W., Chan, A. P. C., and Chiang, Y. H. (2008). " Modeling and forecasting construction labor demand: Multivariate analysis.." J. Constr. Eng. Manage. 0733-9364, 134, 664-672. 10.1061/(ASCE)0733-9364(2008)134: 9(664)
    • (2008) J. Constr. Eng. Manage. , vol.134 , pp. 664-672
    • Wong, J.M.W.1    Chan, A.P.C.2    Chiang, Y.H.3
  • 22
    • 33750107632 scopus 로고    scopus 로고
    • Markov-based optimization model for building facilities management
    • DOI 10.1061/(ASCE)0733-9364(2006)132:11(1203), 001611QCO
    • Zhang, X. (2006). " Markov-Based optimization model for building facilities management.." J. Constr. Eng. Manage. 0733-9364, 132, 1203-1211. 10.1061/(ASCE)0733-9364(2006)132:11(1203) (Pubitemid 44592497)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.11 , pp. 1203-1211
    • Zhang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.