메뉴 건너뛰기




Volumn 17, Issue 6, 2008, Pages 780-791

Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models

Author keywords

4D CAD; Construction planning; Time space buffer; Workflow analysis

Indexed keywords

COMPUTER AIDED DESIGN; CONSTRUCTION INDUSTRY; INFORMATION RETRIEVAL; MATHEMATICAL MODELS; STRATEGIC PLANNING;

EID: 41749088228     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.02.006     Document Type: Article
Times cited : (48)

References (15)
  • 1
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction with 4D-CAD
    • Elsevier
    • McKinney K., and Fischer M. Generating, evaluating and visualizing construction with 4D-CAD. Automation in Construction vol. 7 (6) (1998), Elsevier 433-447
    • (1998) Automation in Construction , vol.7 6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 2
    • 33846023352 scopus 로고    scopus 로고
    • A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
    • Elsevier
    • Jongeling R., and Olofsson T. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD. Automation in Construction vol. 16 (2) (2007), Elsevier 189-198
    • (2007) Automation in Construction , vol.16 2 , pp. 189-198
    • Jongeling, R.1    Olofsson, T.2
  • 3
    • 1842832075 scopus 로고    scopus 로고
    • Trends of 4D CAD applications for construction planning
    • Taylor & Francis
    • Heesom D., and Mahdjoubi L. Trends of 4D CAD applications for construction planning. Construction Management and Economics vol. 22 (2) (2004), Taylor & Francis 171-182
    • (2004) Construction Management and Economics , vol.22 2 , pp. 171-182
    • Heesom, D.1    Mahdjoubi, L.2
  • 4
    • 41749121322 scopus 로고    scopus 로고
    • Z. Mallasi, N. Dawood, Registering Space Requirements of Construction Operations Using Site-PECASO Model, in: K. Agger, P. Christiansson, R. Howard, (Ed.), CIB w78 conference 2002 - Distributing Knowledge in Building, Aarhus School of Architecture, Aarhus School of Architecture, Denmark, 2002, pp. 1-8.
    • Z. Mallasi, N. Dawood, Registering Space Requirements of Construction Operations Using Site-PECASO Model, in: K. Agger, P. Christiansson, R. Howard, (Ed.), CIB w78 conference 2002 - Distributing Knowledge in Building, Aarhus School of Architecture, Aarhus School of Architecture, Denmark, 2002, pp. 1-8.
  • 6
    • 21344467993 scopus 로고    scopus 로고
    • Combining different project modeling approaches for effective support of multi-disciplinary engineering tasks
    • Brandon P., Li H., Shaffii N., and Shen Q. (Eds), Construction Industry Development Board, Langkawi
    • Fischer M., Hartmann T., Rank E., Neuberg F., Schreyer M., Liston K., and Kunz J. Combining different project modeling approaches for effective support of multi-disciplinary engineering tasks. In: Brandon P., Li H., Shaffii N., and Shen Q. (Eds). INCITE 2004 - International Conference on Information Technology in Design and Construction (2004), Construction Industry Development Board, Langkawi 167-182
    • (2004) INCITE 2004 - International Conference on Information Technology in Design and Construction , pp. 167-182
    • Fischer, M.1    Hartmann, T.2    Rank, E.3    Neuberg, F.4    Schreyer, M.5    Liston, K.6    Kunz, J.7
  • 7
    • 0041825829 scopus 로고    scopus 로고
    • Virtual experiment of innovative construction operations
    • Elsevier
    • Li H., Ma Z., Shen Q., and Kong S. Virtual experiment of innovative construction operations. Automation in Construction vol. 12 (5) (2003), Elsevier 561-575
    • (2003) Automation in Construction , vol.12 5 , pp. 561-575
    • Li, H.1    Ma, Z.2    Shen, Q.3    Kong, S.4
  • 9
    • 21344434620 scopus 로고    scopus 로고
    • Project micromanagement: practical site planning and management of work flow
    • Bertelsen S., and Formoso C.T. (Eds), Helsingor, Denmark
    • Kenley R. Project micromanagement: practical site planning and management of work flow. In: Bertelsen S., and Formoso C.T. (Eds). IGLC-12, 12th Conference of the International Group for Lean Construction, IGLC (2004), Helsingor, Denmark 194-205
    • (2004) IGLC-12, 12th Conference of the International Group for Lean Construction, IGLC , pp. 194-205
    • Kenley, R.1
  • 10
    • 41749112500 scopus 로고    scopus 로고
    • A process model for work-flow management in construction. Combined use of location-based scheduling and 4D CAD
    • Luleå University of Technology
    • Jongeling R. A process model for work-flow management in construction. Combined use of location-based scheduling and 4D CAD. Division of Structural Engineering, Civil and Environmental Engineering (2006), Luleå University of Technology
    • (2006) Division of Structural Engineering, Civil and Environmental Engineering
    • Jongeling, R.1
  • 11
    • 41749084004 scopus 로고    scopus 로고
    • R. Akbas, Geometry-based Modeling and Simulation of Construction Processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University, 2004.
    • R. Akbas, Geometry-based Modeling and Simulation of Construction Processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University, 2004.
  • 15
    • 41749112281 scopus 로고    scopus 로고
    • IAI, http://www.iai-international.org/Model/R2x3_final/index.htm, World Wide Web Reference, Last accessed: December 2007.
    • IAI, http://www.iai-international.org/Model/R2x3_final/index.htm, World Wide Web Reference, Last accessed: December 2007.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.