-
2
-
-
0003398158
-
-
John Wiley & Sons, Inc., New York
-
E. A. Silver, D. F. Pyke, and R. Peterson, Inventory Management and Production Planning and Scheduling, John Wiley & Sons, Inc., New York, 151-172, 1998.
-
(1998)
Inventory Management and Production Planning and Scheduling
, pp. 151-172
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
3
-
-
0017416997
-
Integrated inventory model for a single supplier - single customer problem
-
S. K. Goyal, Integrated Inventory Model for a Single Supplier - Single Customer Problem, International Journal of Production Research 15, 107-111, 1977.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
4
-
-
84985846646
-
A joint economic-lot-size model for purchaser and vendor
-
A. Banerjee, A joint economic-lot-size model for purchaser and vendor, Decision Sciences 17, 3, 292-311, 1986.
-
(1986)
Decision Sciences
, vol.17
, Issue.3
, pp. 292-311
-
-
Banerjee, A.1
-
5
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
L. Lu, A one-vendor multi-buyer integrated inventory model, European Journal of Operational Research 81, 312-323, 1995.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 312-323
-
-
Lu, L.1
-
6
-
-
0033297229
-
Optimal batch size for a production system operating under periodic delivery policy
-
R. A. Sarker and L. R. Khan, Optimal batch size for a production system operating under periodic delivery policy, Computers and Industrial Engineering 37, 711-730, 1999.
-
(1999)
Computers and Industrial Engineering
, vol.37
, pp. 711-730
-
-
Sarker, R.A.1
Khan, L.R.2
-
7
-
-
0037121477
-
A single-vendor and multiple-buyers production- inventory policy for a deteriorating item
-
P. C. Yang and H. M. Wee, A single-vendor and multiple-buyers production- inventory policy for a deteriorating item, European Journal of Operational Research 143, 3, 570-581, 2002.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.3
, pp. 570-581
-
-
Yang, P.C.1
Wee, H.M.2
-
8
-
-
33646120799
-
Joint economic lot size in distribution system with multiple shipment policy
-
H. Siajadi, R. N. Ibrahim, and P. B. Lochert, Joint economic lot size in distribution system with multiple shipment policy, International Journal of Production Economics, 102(2), 302-316, 2006.
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.2
, pp. 302-316
-
-
Siajadi, H.1
Ibrahim, R.N.2
Lochert, P.B.3
-
9
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes, IIE Transactions 18, 48-55, 1986.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
10
-
-
0026116409
-
Economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T. C. E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transactions, 23, 1991, 23-28. (Pubitemid 21651734)
-
(1991)
IIE Transactions (Institute of Industrial Engineers)
, vol.23
, Issue.1
, pp. 23-28
-
-
Cheng, T.C.E.1
-
11
-
-
0031273569
-
Analysis of a production/inventory system subject to random disruptions
-
K. Moinzadeh and P. Aggarwal, Analysis of a production/inventory system subject to random disruptions, Management Science 43, 1577-1588, 1997. (Pubitemid 127606213)
-
(1997)
Management Science
, vol.43
, Issue.11
, pp. 1577-1588
-
-
Moinzadeh, K.1
Aggarwal, P.2
-
12
-
-
0035577718
-
Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
-
M. A. Rahim and M. Ben-Daya, Joint determination of production quantity, inspection schedule and quality control for imperfect process with deteriorating products, Journal of the Operational Research Society 52, 1370-1378, 2001. (Pubitemid 33128273)
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.12
, pp. 1370-1378
-
-
Rahim, M.A.1
Ben-Daya, M.2
-
13
-
-
31344465116
-
Solving an EPQ model with rework and service level constraint
-
Y-S. P. Chiu, S. W. Chiu, and H-D. Lin, Solving an EPQ model with rework and service level constraint, Mathematical & Computational Applications, 11(1), 75-84, 2006. (Pubitemid 43143818)
-
(2006)
Mathematical and Computational Applications
, vol.11
, Issue.1
, pp. 75-84
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Lin, H.-D.3
-
14
-
-
0032299489
-
Minimal repair policies for an economic manufacturing process
-
T. Dohi, N. Kaio, and S. Osaki, Minimal repair policies for an economic manufacturing process, Journal of Quality in Maintenance Engineering 4, 248-262, 1998.
-
(1998)
Journal of Quality in Maintenance Engineering
, vol.4
, pp. 248-262
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
15
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Y. P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engineering Optimization 35, 427-437, 2003.
-
(2003)
Engineering Optimization
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
16
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
A. M. M. Jamal, B. R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system, Computers & Industrial Engineering 47, 77-89, 2004.
-
(2004)
Computers & Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
17
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
S. W. Chiu and Y-S. P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research, 65, 499-506, 2006. (Pubitemid 43942050)
-
(2006)
Journal of Scientific and Industrial Research
, vol.65
, Issue.6
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
18
-
-
67649826546
-
Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy
-
Y-S. P. Chiu, C-Y. Tseng, W-C. Liu, and C-K. Ting, Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy, P I Mech E Part B: Journal of Engineering Manufacture 223, 2, 183-194, 2009.
-
(2009)
P I Mech E Part B: Journal of Engineering Manufacture
, vol.223
, Issue.2
, pp. 183-194
-
-
Chiu, Y.-S.P.1
Tseng, C.-Y.2
Liu, W.-C.3
Ting, C.-K.4
-
19
-
-
30344488182
-
Economic lot sizing for an imperfect production system subject to random breakdowns
-
DOI 10.1080/03052150500270578, PII N2902005662
-
G. C. Lin and D. E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns, Engineering Optimization 38, 73-92, 2006. (Pubitemid 43065364)
-
(2006)
Engineering Optimization
, vol.38
, Issue.1
, pp. 73-92
-
-
Lin, G.C.1
Kroll, D.E.2
-
20
-
-
72949118882
-
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
-
Y-S. P. Chiu, K-K. Chen, F-T. Cheng, and M-F. Wu, Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown, Computers and Mathematics with Applications, 59(2), 919-932, 2010.
-
(2010)
Computers and Mathematics with Applications
, vol.59
, Issue.2
, pp. 919-932
-
-
Chiu, Y.-S.P.1
Chen, K-K.2
Cheng, F.-T.3
Wu, M.-F.4
-
21
-
-
70349417897
-
A note on Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns?
-
Y-S. P. Chiu and C-K. Ting, A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns?, European Journal of Operational Research, 201(2), 641-643, 2010.
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.2
, pp. 641-643
-
-
Chiu, Y.-S.P.1
Ting, C.-K.2
-
22
-
-
79952946306
-
Joint determination of the production lot size and number of shipments for EPQ model with rework
-
(article in press)
-
S. W. Chiu, D-C. Gong, C-L. Chiu, and C-L. Chung, Joint determination of the production lot size and number of shipments for EPQ model with rework, Mathematical and Computational Applications, 16(1), 2010 (article in press).
-
(2010)
Mathematical and Computational Applications
, vol.16
, Issue.1
-
-
Chiu, S.W.1
Gong, D.-C.2
Chiu, C.-L.3
Chung, C.-L.4
-
24
-
-
0035906315
-
The economic production quantity (EPQ) with shortage derived algebraically
-
DOI 10.1016/S0925-5273(00)00068-2, PII S0925527300000682
-
L. E. Cárdenas-Barrón, The economic production quantity (EPQ) with shortage derived algebraically, International Journal of Production Economics, 70, 289-292, 2001. (Pubitemid 32272157)
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.3
, pp. 289-292
-
-
Cardenas-Barron, L.E.1
-
25
-
-
78149258620
-
An algebraic approach for determining optimal lot size for EPQ model with rework process
-
S. W. Chiu, C-B. Cheng, M-F. Wu, and J-C. Yang, An algebraic approach for determining optimal lot size for EPQ model with rework process, Mathematical and Computational Applications, 15(3), 364-370, 2010.
-
(2010)
Mathematical and Computational Applications
, vol.15
, Issue.3
, pp. 364-370
-
-
Chiu, S.W.1
Cheng, C.-B.2
Wu, M.-F.3
Yang, J.-C.4
|