-
1
-
-
0003398158
-
-
John Wiley & Sons, Inc., New York
-
E. A. Silver, D. F. Pyke, and R. Peterson, Inventory Management and Production Planning and Scheduling, John Wiley & Sons, Inc., New York, 151-172, 1998.
-
(1998)
Inventory Management and Production Planning and Scheduling
, pp. 151-172
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
4
-
-
0017416997
-
Integrated inventory model for a single supplier - Single customer problem
-
S. K. Goyal, Integrated Inventory Model for a Single Supplier - Single Customer Problem, International Journal of Production Research 15, 107-111, 1977.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
5
-
-
84985846646
-
A joint economic-lot-size model for purchaser and vendor
-
A. Banerjee, A joint economic-lot-size model for purchaser and vendor, Decision Sciences 17, 3, 292-311, 1986.
-
(1986)
Decision Sciences
, vol.17
, Issue.3
, pp. 292-311
-
-
Banerjee, A.1
-
6
-
-
84974873088
-
An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
-
B. R. Sarker and G. R. Parija, An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy, Journal of the Operational Research Society 45, 891-900, 1994.
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 891-900
-
-
Sarker, B.R.1
Parija, G.R.2
-
7
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
L. Lu, A one-vendor multi-buyer integrated inventory model, European Journal of Operational Research 81, 312-323, 1995.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 312-323
-
-
Lu, L.1
-
8
-
-
0030190937
-
Optimizing a production system with a fixed delivery schedule
-
R. M. Hill, Optimizing a production system with a fixed delivery schedule", Journal of the Operational Research Society 47, 954-960, 1996. (Pubitemid 126576160)
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.7
, pp. 954-960
-
-
Hill, R.M.1
-
9
-
-
0032002459
-
Optimal strategy for the integrated vendor-buyer inventory model
-
PII S0377221797000325
-
S. Viswanathan, Optimal strategy for the integrated vendor-buyer inventory model, European Journal of Operational Research 105, 38-42, 1998. (Pubitemid 128387758)
-
(1998)
European Journal of Operational Research
, vol.105
, Issue.1
, pp. 38-42
-
-
Viswanathan, S.1
-
10
-
-
0033297229
-
Optimal batch size for a production system operating under periodic delivery policy
-
R. A. Sarker and L. R. Khan, Optimal batch size for a production system operating under periodic delivery policy, Computers and Industrial Engineering 37, 711-730, 1999.
-
(1999)
Computers and Industrial Engineering
, vol.37
, pp. 711-730
-
-
Sarker, R.A.1
Khan, L.R.2
-
11
-
-
0037121477
-
A single-vendor and multiple-buyers productioninventory policy for a deteriorating item
-
P. C. Yang and H. M. Wee, A single-vendor and multiple-buyers productioninventory policy for a deteriorating item, European Journal of Operational Research 143, 3, 570-581, 2002.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.3
, pp. 570-581
-
-
Yang, P.C.1
Wee, H.M.2
-
12
-
-
0037400725
-
Optimizing inventory decisions in a multi-stage multi-customer supply chain
-
DOI 10.1016/S1366-5545(02)00036-4
-
M. Khouja, Optimizing inventory decisions in a multi-stage multi-customer supply chain, Transportation Research Part E: Logistics and Transportation Review 39, 3, 193-208, 2003. (Pubitemid 36302882)
-
(2003)
Transportation Research Part E: Logistics and Transportation Review
, vol.39
, Issue.3
, pp. 193-208
-
-
Khouja, M.1
-
13
-
-
9544241347
-
Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
-
L-Y. Ouyang, K-S. Wu, and C-H. Ho, Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time, International Journal of Production Economics 92, 3, 255-266, 2004.
-
(2004)
International Journal of Production Economics
, vol.92
, Issue.3
, pp. 255-266
-
-
Ouyang, L.-Y.1
Wu, K.-S.2
Ho, C.-H.3
-
14
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes, IIE Transactions 18, 48-55, 1986.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
15
-
-
0026116409
-
Economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T. C. E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transactions, 23, 1991, 23-28. (Pubitemid 21651734)
-
(1991)
IIE Transactions (Institute of Industrial Engineers)
, vol.23
, Issue.1
, pp. 23-28
-
-
Cheng, T.C.E.1
-
17
-
-
0031273569
-
Analysis of a production/inventory system subject to random disruptions
-
K. Moinzadeh and P. Aggarwal, Analysis of a production/inventory system subject to random disruptions, Management Science 43, 1577-1588, 1997. (Pubitemid 127606213)
-
(1997)
Management Science
, vol.43
, Issue.11
, pp. 1577-1588
-
-
Moinzadeh, K.1
Aggarwal, P.2
-
18
-
-
23144434063
-
A dynamic lot sizing model with exponential machine breakdowns
-
PII S0377221796001361
-
H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns, European Journal of Operational Research 100, 514-536, 1997. (Pubitemid 127392374)
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.3
, pp. 514-536
-
-
Kuhn, H.1
-
19
-
-
0035577718
-
Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
-
M. A. Rahim and M. Ben-Daya, Joint determination of production quantity, inspection schedule and quality control for imperfect process with deteriorating products, Journal of the Operational Research Society 52, 1370-1378, 2001. (Pubitemid 33128273)
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.12
, pp. 1370-1378
-
-
Rahim, M.A.1
Ben-Daya, M.2
-
20
-
-
33645163509
-
The effect of service level constraint on EPQ model with random de fective rate
-
2006, Article ID 98502, 13 pages
-
Y-S. P. Chiu, The effect of service level constraint on EPQ model with random defective rate, Mathematical Problems in Engineering, 2006, Article ID 98502, 13 pages, 2006.
-
(2006)
Mathematical Problems in Engineering
-
-
Chiu, Y.-S.P.1
-
21
-
-
0032299489
-
Minimal repair policies for an economic manufacturing process
-
T. Dohi, N. Kaio, and S. Osaki, Minimal repair policies for an economic manufacturing process, Journal of Quality in Maintenance Engineering 4, 248-262, 1998.
-
(1998)
Journal of Quality in Maintenance Engineering
, vol.4
, pp. 248-262
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
22
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
DOI 10.1080/095372801750397707
-
P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced, Production Planning and Control 12, 584-590, 2001. (Pubitemid 35395061)
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
23
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Y. P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engineering Optimization 35, 427-437, 2003.
-
(2003)
Engineering Optimization
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
24
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
A. M. M. Jamal, B. R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system, Computers & Industrial Engineering 47, 77-89, 2004.
-
(2004)
Computers & Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
25
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
S. W. Chiu and Y-S. P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research, 65, 499-506, 2006. (Pubitemid 43942050)
-
(2006)
Journal of Scientific and Industrial Research
, vol.65
, Issue.6
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
26
-
-
34247097459
-
Optimal production lot sizing with backlogging random defective rate
-
and rework derived without derivatives, P I Mech E Part B
-
Y-S. P. Chiu, H-D. Lin, and F-T. Cheng, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives, P I Mech E Part B: Journal of Engineering Manufacture 220, 9, 1559-1563, 2006.
-
(2006)
Journal of Engineering Manufacture
, vol.220
, Issue.9
, pp. 1559-1563
-
-
Chiu, Y.-S.P.1
Lin, H.-D.2
Cheng, F.-T.3
-
27
-
-
67649826546
-
Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy
-
P I Mech E Part B
-
Y-S. P. Chiu, C-Y. Tseng, W-C. Liu, and C-K. Ting, Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy, P I Mech E Part B: Journal of Engineering Manufacture 223, 2, 183-194, 2009.
-
(2009)
Journal of Engineering Manufacture
, vol.223
, Issue.2
, pp. 183-194
-
-
Chiu, Y.-S.P.1
Tseng, C.-Y.2
Liu, W.-C.3
Ting, C.-K.4
-
28
-
-
30344488182
-
Economic lot sizing for an imperfect production system subject to random breakdowns
-
DOI 10.1080/03052150500270578, PII N2902005662
-
G. C. Lin and D. E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns, Engineering Optimization 38, 73-92, 2006. (Pubitemid 43065364)
-
(2006)
Engineering Optimization
, vol.38
, Issue.1
, pp. 73-92
-
-
Lin, G.C.1
Kroll, D.E.2
-
29
-
-
31344465116
-
Solving an EPQ model with rework and service level constraint
-
Y-S. P. Chiu, S.W. Chiu, and H-D. Lin, Solving an EPQ model with rework and service level constraint, Mathematical & Computational Applications 11, 1, 75-84, 2006. (Pubitemid 43143818)
-
(2006)
Mathematical and Computational Applications
, vol.11
, Issue.1
, pp. 75-84
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Lin, H.-D.3
|