-
1
-
-
0034999406
-
Probabilistic service level guarantees in make-to -stock manufacturing systems
-
D. Bertsimas and I.C. Paschalidis, Probabilistic service level guarantees in make-to -stock manufacturing systems. Operations Research. 49, 1, 119-136, 2001.
-
(2001)
Operations Research
, vol.49
, Issue.1
, pp. 119-136
-
-
Bertsimas, D.1
Paschalidis, I.C.2
-
2
-
-
0035480433
-
Inventory models with minimal service level constraints
-
F.Y. Chen and D. Krass, Inventory models with minimal service level constraints. European Journal of Operational Research. 134, 1, 120-140, 2001.
-
(2001)
European Journal of Operational Research
, vol.134
, Issue.1
, pp. 120-140
-
-
Chen, F.Y.1
Krass, D.2
-
3
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Tran. 23, 23-28, 1991.
-
(1991)
IIE Tran.
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
4
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization. 35, 427-437, 2003.
-
(2003)
Engineering Optimization
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
5
-
-
31344439916
-
The finite production model with the reworking of defective items
-
Y.P. Chiu and S.W. Chiu, The finite production model with the reworking of defective items. Int. J. Ind. Eng. - Theory, Appl. & Prac. 12, 1, 15-20, 2005.
-
(2005)
Int. J. Ind. Eng. - Theory, Appl. & Prac.
, vol.12
, Issue.1
, pp. 15-20
-
-
Chiu, Y.P.1
Chiu, S.W.2
-
6
-
-
0022076008
-
Approximations for a lost-sales production/inventory control model with service level constraints
-
A.G. de Kok, Approximations for a lost-sales production/inventory control model with service level constraints. Management Science. 31, 6, 729-737, 1985.
-
(1985)
Management Science
, vol.31
, Issue.6
, pp. 729-737
-
-
De Kok, A.G.1
-
7
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Cont. 12, 584-590, 2001.
-
(2001)
Prod. Plan. Cont.
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
8
-
-
0031146058
-
Easily implementable inventory control policies
-
W.J. Hopp, M.L. Spearman, and R.Q. Zhang, Easily implementable inventory control policies. Operations Research, 45, 3, 327-340, 1997.
-
(1997)
Operations Research
, vol.45
, Issue.3
, pp. 327-340
-
-
Hopp, W.J.1
Spearman, M.L.2
Zhang, R.Q.3
-
9
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
H.L. Lee and M. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Manag. Sci. 33, 1125-1136, 1987.
-
(1987)
Manag. Sci.
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.2
-
10
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
J.J. Liu and P. Yang, Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. Euro. J. Oper. Res. 91, 517-527, 1996.
-
(1996)
Euro. J. Oper. Res.
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
11
-
-
0006038152
-
A comparison of production scheduling policies on costs, service level, and schedule changes
-
R. Metters and V. Vargas, A comparison of production scheduling policies on costs, service level, and schedule changes. Production&Operations Management. 8, 1, 76-91, 1999.
-
(1999)
Production&Operations Management
, vol.8
, Issue.1
, pp. 76-91
-
-
Metters, R.1
Vargas, V.2
-
13
-
-
0031232606
-
Mixture inventory model involving variable lead time with a service level constraint
-
L-Y. Ouyang and K-S. Wu, Mixture inventory model involving variable lead time with a service level constraint Computers&Operations Research.24,9,875-882, 1997.
-
(1997)
Computers&Operations Research
, vol.24
, Issue.9
, pp. 875-882
-
-
Ouyang, L.-Y.1
Wu, K.-S.2
-
15
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Tran. 18, 48-55, 1986.
-
(1986)
IIE Tran.
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
|