메뉴 건너뛰기




Volumn 29, Issue 2, 2013, Pages 158-163

Critical path definition using multicriteria decision making: Promethee method

Author keywords

Critical path; Fuzzy PERT; Multicriteria; Preference ranking organization method for enrichment evaluation (PROMETHEE)

Indexed keywords

CONFLICTING OBJECTIVES; CRITICAL PATHS; ENRICHMENT EVALUATION; MULTI CRITERIA DECISION MAKING; MULTI-CRITERIA; MULTI-CRITERIA DECISION-MAKING METHODS; REAL WORLD SITUATIONS; UNCERTAIN ENVIRONMENTS;

EID: 84875032258     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000135     Document Type: Article
Times cited : (44)

References (28)
  • 1
    • 0035197791 scopus 로고    scopus 로고
    • Application of the AHP in project management
    • IPMAEL
    • Al-Harbi, K. M. A. S. (2001). " Application of the AHP in project management." Int. J. Project Manage., 19 (1), 19-27. IPMAEL
    • (2001) Int. J. Project Manage. , vol.19 , Issue.1 , pp. 19-27
    • Al-Harbi, K.M.A.S.1
  • 2
    • 79955646762 scopus 로고    scopus 로고
    • Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria
    • Amiri, M., and, Golozari, F. (2011). " Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria." Int. J. Adv. Manuf. Technol., 54 (1-4), 393-401.
    • (2011) Int. J. Adv. Manuf. Technol. , vol.54 , Issue.14 , pp. 393-401
    • Amiri, M.1    Golozari, F.2
  • 3
    • 33645892898 scopus 로고    scopus 로고
    • A multi-objective resource allocation problem in PERT networks
    • " EJORDT 0377-2217 10.1016/j.ejor.2004.11.018
    • Azaron, A., Katagiri, H., Sakawa, M., Kato, K., and, Memariani, A. (2006). " A multi-objective resource allocation problem in PERT networks." Eur. J. Oper. Res., 172 (3), 838-854. EJORDT 0377-2217 10.1016/j.ejor.2004.11.018
    • (2006) Eur. J. Oper. Res. , vol.172 , Issue.3 , pp. 838-854
    • Azaron, A.1    Katagiri, H.2    Sakawa, M.3    Kato, K.4    Memariani, A.5
  • 5
    • 0000372281 scopus 로고
    • A preference ranking organization method: The PROMETHEE method for multiple-criteria decision-making
    • MSCIAM 0025-1909 10.1287/mnsc.31.6.647
    • Brans, J. P., and, Vincke, P. H. (1985). " A preference ranking organization method: The PROMETHEE method for multiple-criteria decision-making." Manage. Sci., 31 (6), 647-656. MSCIAM 0025-1909 10.1287/mnsc.31.6.647
    • (1985) Manage. Sci. , vol.31 , Issue.6 , pp. 647-656
    • Brans, J.P.1    Vincke, P.H.2
  • 6
    • 77954101812 scopus 로고    scopus 로고
    • British Standards Institution. " " BS 6079, London.
    • British Standards Institution. (2002). " Guide to project management." BS 6079, London.
    • (2002) Guide to Project Management
  • 7
    • 0035426615 scopus 로고    scopus 로고
    • Multi-criteria assessment of the probability of winning in the competitive bidding process
    • " IPMAEL 10.1016/S0263-7863(00)00020-X
    • Cagno, E., Caron, F., and, Perego, A. (2001). " Multi-criteria assessment of the probability of winning in the competitive bidding process." Int. J. Project Manage., 19 (6), 313-324. IPMAEL 10.1016/S0263-7863(00)00020-X
    • (2001) Int. J. Project Manage. , vol.19 , Issue.6 , pp. 313-324
    • Cagno, E.1    Caron, F.2    Perego, A.3
  • 8
    • 0002146440 scopus 로고
    • The use of fuzzy variables in PERT
    • FSSYD8 0165-0114 10.1016/0165-0114(81)90030-0
    • Chanas, S., and, Kamburowski, J. (1981). " The use of fuzzy variables in PERT." Fuzzy Sets Syst., 5 (1), 11-19. FSSYD8 0165-0114 10.1016/0165-0114(81)90030-0
    • (1981) Fuzzy Sets Syst. , vol.5 , Issue.1 , pp. 11-19
    • Chanas, S.1    Kamburowski, J.2
  • 9
    • 0035670765 scopus 로고    scopus 로고
    • Finding multiple possible critical paths using fuzzy PERT
    • Chen, S. M., and, Chang, T. H. (2001). " Finding multiple possible critical paths using fuzzy PERT." IEEE Trans. Syst. Man Cybern. Part B Cybern., 31 (6), 930-937.
    • (2001) IEEE Trans. Syst. Man Cybern. Part B Cybern. , vol.31 , Issue.6 , pp. 930-937
    • Chen, S.M.1    Chang, T.H.2
  • 10
    • 34249099938 scopus 로고    scopus 로고
    • Analysis of critical paths in a project network with fuzzy activity times
    • EJORDT 0377-2217 10.1016/j.ejor.2006.06.053
    • Chen, S. P. (2007). " Analysis of critical paths in a project network with fuzzy activity times." Eur. J. Oper. Res., 183 (1), 442-459. EJORDT 0377-2217 10.1016/j.ejor.2006.06.053
    • (2007) Eur. J. Oper. Res. , vol.183 , Issue.1 , pp. 442-459
    • Chen, S.P.1
  • 11
    • 40749101569 scopus 로고    scopus 로고
    • A simple approach to fuzzy critical path analysis in project networks
    • AMMODL 0307-904X 10.1016/j.apm.2007.04.009
    • Chen, S. P., and, Hsueh, Y. J. (2008). " A simple approach to fuzzy critical path analysis in project networks." Appl. Math. Model., 32 (7), 1289-1297. AMMODL 0307-904X 10.1016/j.apm.2007.04.009
    • (2008) Appl. Math. Model. , vol.32 , Issue.7 , pp. 1289-1297
    • Chen, S.P.1    Hsueh, Y.J.2
  • 12
    • 34047265638 scopus 로고    scopus 로고
    • Applying fuzzy method for measuring criticality in project network
    • ISIJBC 0020-0255 10.1016/j.ins.2007.01.035
    • Chen, C. T., and, Huang, S. F. (2007). " Applying fuzzy method for measuring criticality in project network." Inf. Sci., 177 (12), 2448-2458. ISIJBC 0020-0255 10.1016/j.ins.2007.01.035
    • (2007) Inf. Sci. , vol.177 , Issue.12 , pp. 2448-2458
    • Chen, C.T.1    Huang, S.F.2
  • 13
    • 11944249373 scopus 로고    scopus 로고
    • Contractor selection using the analytical network process
    • 0144-6193 10.1080/0144619042000202852
    • Cheng, E. W. L., and, Li, H. (2004). " Contractor selection using the analytical network process." Constr. Manage. Econ., 22 (10), 1021-1032. 0144-6193 10.1080/0144619042000202852
    • (2004) Constr. Manage. Econ. , vol.22 , Issue.10 , pp. 1021-1032
    • Cheng, E.W.L.1    Li, H.2
  • 14
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • 0144-6193 10.1080/014461900407356
    • Fong, P. S. W., and, Choi, S. K. Y. (2000). " Final contractor selection using the analytical hierarchy process." Constr. Manage. Econ., 18 (5), 547-557. 0144-6193 10.1080/014461900407356
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.5 , pp. 547-557
    • Fong, P.S.W.1    Choi, S.K.Y.2
  • 15
    • 0002576968 scopus 로고    scopus 로고
    • Criteria for contractor selection
    • 0144-6193 10.1080/014461997373088
    • Hatush, Z., and, Skitmore, M. (1997). " Criteria for contractor selection." Constr. Manage. Econ., 15 (1), 19-38. 0144-6193 10.1080/014461997373088
    • (1997) Constr. Manage. Econ. , vol.15 , Issue.1 , pp. 19-38
    • Hatush, Z.1    Skitmore, M.2
  • 16
    • 33646078907 scopus 로고    scopus 로고
    • Critical determinants of project coordination
    • IPMAEL 10.1016/j.ijproman.2005.11.005
    • Jha, K. N., and, Iyer, K. C. (2006). " Critical determinants of project coordination." Int. J. Project Manage., 24 (4), 314-322. IPMAEL 10.1016/j.ijproman.2005.11.005
    • (2006) Int. J. Project Manage. , vol.24 , Issue.4 , pp. 314-322
    • Jha, K.N.1    Iyer, K.C.2
  • 17
    • 33748887245 scopus 로고    scopus 로고
    • The use of time and cost utility for construction contract award under European union legislation
    • BUSCBC 0360-1323 10.1016/j.buildenv.2005.08.002
    • Lambopoulos, S. (2007). " The use of time and cost utility for construction contract award under European union legislation." Build. Environ., 42 (1), 452-463. BUSCBC 0360-1323 10.1016/j.buildenv.2005.08.002
    • (2007) Build. Environ. , vol.42 , Issue.1 , pp. 452-463
    • Lambopoulos, S.1
  • 20
    • 84860498580 scopus 로고    scopus 로고
    • A multi-criteria approach to contractor selection
    • " 0969-9988 10.1108/eb021204
    • Madhi, I., Riley, M., Fereig, S., and, Alex, A. (2002). " A multi-criteria approach to contractor selection." Eng. Constr. Archit. Manage., 9 (1), 29-37. 0969-9988 10.1108/eb021204
    • (2002) Eng. Constr. Archit. Manage. , vol.9 , Issue.1 , pp. 29-37
    • Madhi, I.1    Riley, M.2    Fereig, S.3    Alex, A.4
  • 21
    • 32844463459 scopus 로고    scopus 로고
    • Multi-criteria evaluation of cooking devices with special reference to utility of parabolic solar cooker (PSC) in India
    • ENGYD4 0149-9386 10.1016/j.energy.2005.04.012
    • Pohekar, S. D., and, Ramachandran, M. (2006). " Multi-criteria evaluation of cooking devices with special reference to utility of parabolic solar cooker (PSC) in India." Energy, 31 (8-9), 1215-1227. ENGYD4 0149-9386 10.1016/j.energy.2005.04.012
    • (2006) Energy , vol.31 , Issue.89 , pp. 1215-1227
    • Pohekar, S.D.1    Ramachandran, M.2
  • 24
    • 77953486961 scopus 로고    scopus 로고
    • Fuzzy critical path method based on metric distance ranking of fuzzy numbers
    • "
    • Shankar, N. R., Sireesha, V., Rao, K., and, Vani, N. (2010). " Fuzzy critical path method based on metric distance ranking of fuzzy numbers." Int. J. Math. Anal., 4 (20), 995-1006.
    • (2010) Int. J. Math. Anal. , vol.4 , Issue.20 , pp. 995-1006
    • Shankar, N.R.1    Sireesha, V.2    Rao, K.3    Vani, N.4
  • 25
    • 10444281457 scopus 로고    scopus 로고
    • IT/IS project selection using multi-criteria utility theory
    • LINMEC 10.1108/09576050210436101
    • Stewart, R., and, Mohamed, S. (2002). " IT/IS project selection using multi-criteria utility theory." Log. Inf. Manage., 15 (4), 254-270. LINMEC 10.1108/09576050210436101
    • (2002) Log. Inf. Manage. , vol.15 , Issue.4 , pp. 254-270
    • Stewart, R.1    Mohamed, S.2
  • 26
    • 0942289097 scopus 로고    scopus 로고
    • A decision model proposal for construction contractor selection in Turkey
    • BUSCBC 0360-1323 10.1016/j.buildenv.2003.09.009
    • Topcu, Y. I. (2004). " A decision model proposal for construction contractor selection in Turkey." Build. Environ., 39 (4), 469-481. BUSCBC 0360-1323 10.1016/j.buildenv.2003.09.009
    • (2004) Build. Environ. , vol.39 , Issue.4 , pp. 469-481
    • Topcu, Y.I.1
  • 27
    • 70350070859 scopus 로고    scopus 로고
    • Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000092
    • Zahraie B., and, Tavakolan, M. (2009). ' Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets." J. Constr. Eng. Manage., 135 (11), 1162-1171. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000092
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.11 , pp. 1162-1171
    • Zahraie, B.1    Tavakolan, M.2
  • 28
    • 61549092460 scopus 로고    scopus 로고
    • A fuzzy multi-criteria approach for critical path definition
    • " IPMAEL 10.1061/(ASCE)CO.1943-7862.0000092
    • Zammori, F. A., Braglia, M., and, Frosolini, M. (2009). " A fuzzy multi-criteria approach for critical path definition." Int. J. Project Manage., 27 (3), 278-291. IPMAEL 10.1061/(ASCE)CO.1943-7862.0000092
    • (2009) Int. J. Project Manage. , vol.27 , Issue.3 , pp. 278-291
    • Zammori, F.A.1    Braglia, M.2    Frosolini, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.