Critical determinants of project coordination

Author keywords

Coordination activities; Coordination rating; Multinomial logistic regression; Project coordination; Project success; Questionnaire survey

Indexed keywords

EVALUATION; MATHEMATICAL MODELS; PERSONNEL RATING; PLANNING; REGRESSION ANALYSIS;

EID: 33646078907     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2005.11.005     Document Type: Article
Times cited : (80)

References (23)
  • 1
    • 0019044223 scopus 로고
    • Project management - pulling it all together
    • Lammie J.L., and Shah D.P. Project management - pulling it all together. J Transport Eng Div, ASCE 116 TE4 (1980) 437-451
    • (1980) J Transport Eng Div, ASCE , vol.116 , Issue.TE4 , pp. 437-451
    • Lammie, J.L.1    Shah, D.P.2
  • 2
    • 0019083707 scopus 로고
    • Coordinating tall building development
    • Ruchelman L. Coordinating tall building development. J Urban Plan Dev Div, ASCE 106 UP1 (1980) 89-101
    • (1980) J Urban Plan Dev Div, ASCE , vol.106 , Issue.UP1 , pp. 89-101
    • Ruchelman, L.1
  • 3
    • 33646120483 scopus 로고    scopus 로고
    • Low cost. India Today 1993;XVIII(10):95 [May 31].
  • 4
    • 0034322517 scopus 로고    scopus 로고
    • Coordination issues in Chinese large building projects
    • Wang Y. Coordination issues in Chinese large building projects. J Manage Eng, ASCE 16 6 (2000) 54-61
    • (2000) J Manage Eng, ASCE , vol.16 , Issue.6 , pp. 54-61
    • Wang, Y.1
  • 6
    • 0027787259 scopus 로고
    • New paradigm for coordination in water industry
    • Grigg N.S. New paradigm for coordination in water industry. J Water Resource Plan Manage, ASCE 119 5 (1993) 572-587
    • (1993) J Water Resource Plan Manage, ASCE , vol.119 , Issue.5 , pp. 572-587
    • Grigg, N.S.1
  • 9
    • 0018287340 scopus 로고
    • Delays in construction of nuclear power plant
    • Rad P.F. Delays in construction of nuclear power plant. J Energ Div, Proc of ASCE 105 EY/1 (1979) 33-46
    • (1979) J Energ Div, Proc of ASCE , vol.105 , Issue.EY1 , pp. 33-46
    • Rad, P.F.1
  • 10
    • 0026405694 scopus 로고
    • Hardwiring coordination among land use and transportation agencies
    • Lam E.L. Hardwiring coordination among land use and transportation agencies. J Urban Plan Dev, ASCE 117 4 (1991) 168-180
    • (1991) J Urban Plan Dev, ASCE , vol.117 , Issue.4 , pp. 168-180
    • Lam, E.L.1
  • 11
    • 0035482844 scopus 로고    scopus 로고
    • Construction coordination activities: what is important and what consumes time?
    • Saram D.D.D., and Ahmed S.M. Construction coordination activities: what is important and what consumes time?. J Manage Eng, ASCE 17 4 (2001) 202-213
    • (2001) J Manage Eng, ASCE , vol.17 , Issue.4 , pp. 202-213
    • Saram, D.D.D.1    Ahmed, S.M.2
  • 12
    • 33646112833 scopus 로고    scopus 로고
    • Iyer KC, Jha KN. Analysis of critical coordination activities of Indian construction projects. In: Proceedings of 19th annual conference of association of researchers in the construction management (ARCOM), University of Brighton, UK; 2003. p. 563-72.
  • 13
    • 33646118430 scopus 로고    scopus 로고
    • Iyer KC, Jha KN. Critical coordination activities: the evidence from Indian projects. In: Proceedings of 2nd international conference on construction technology (CONTEC 2003), Universiti Malaysia Sabah, Malaysia. p. 259-71.
  • 14
    • 0002978067 scopus 로고
    • Measuring project success
    • Freeman M., and Beale P. Measuring project success. Project Manage J 23 1 (1992) 8-17
    • (1992) Project Manage J , vol.23 , Issue.1 , pp. 8-17
    • Freeman, M.1    Beale, P.2
  • 15
    • 33646078740 scopus 로고    scopus 로고
    • Iyer KC. Identification and evaluation of dispute-prone clauses in Indian construction contracts. A Doctoral Thesis, submitted at Indian Institute of Technology, Madras; 1996.
  • 16
    • 18144374111 scopus 로고    scopus 로고
    • Factors affecting cost performance: evidence from Indian construction projects
    • Iyer K.C., and Jha K.N. Factors affecting cost performance: evidence from Indian construction projects. Int J Project Manage 23 2005 (2005) 283-295
    • (2005) Int J Project Manage , vol.23 , Issue.2005 , pp. 283-295
    • Iyer, K.C.1    Jha, K.N.2
  • 17
    • 33646083867 scopus 로고    scopus 로고
    • Jha KN, Iyer KC. Success of a construction project in Indian perspective. In: Proceedings of international conference and exposition on construction, Construction Industry Development Council, New Delhi, India; 2004. p. 90-8.
  • 18
    • 33646096174 scopus 로고    scopus 로고
    • Schwab AJ; 2003. Available from: http://www.utexas.edu/courses/schwab.
  • 19
    • 33646088306 scopus 로고    scopus 로고
    • SPSS 9.0.0. SPSS Inc., Headquarters, 233 S. Wacker Drive, 11th floor, Chicago, IL, 60606. Available from: http://www.spss.com.
  • 20
    • 33646115380 scopus 로고    scopus 로고
    • NCSS; 2003. Available from: http://www.ncss.com.
  • 21
    • 33646080989 scopus 로고    scopus 로고
    • Whitehead J; 1998. Available from: http://www.personal.ecu.edu/whiteheadj.
  • 22
    • 33646076877 scopus 로고    scopus 로고
    • Jha KN. Factors for the success of a construction project: an empirical study. A Doctoral Thesis, submitted at Indian Institute of Technology, Delhi; 2004.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.