메뉴 건너뛰기




Volumn 27, Issue 3, 2009, Pages 278-291

A fuzzy multi-criteria approach for critical path definition

Author keywords

Critical path; Fuzzy PERT; MCDM; TOPSIS

Indexed keywords

AIRFOILS; FUZZY SETS; PERT;

EID: 61549092460     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2008.03.006     Document Type: Article
Times cited : (81)

References (44)
  • 2
    • 0001501655 scopus 로고
    • Application of a technique for research and development project evaluation
    • Malcolm D.G., Roseboom J.H., Clark C.E., and Fazar W. Application of a technique for research and development project evaluation. Oper Res 7 (1959) 646-669
    • (1959) Oper Res , vol.7 , pp. 646-669
    • Malcolm, D.G.1    Roseboom, J.H.2    Clark, C.E.3    Fazar, W.4
  • 3
    • 0023314577 scopus 로고
    • Some results concerning the estimation of beta distribution parameters in PERT
    • Farnum N.R., and Stanton L. Some results concerning the estimation of beta distribution parameters in PERT. J Oper Res Soc 38 3 (1987) 287-290
    • (1987) J Oper Res Soc , vol.38 , Issue.3 , pp. 287-290
    • Farnum, N.R.1    Stanton, L.2
  • 4
    • 0036683729 scopus 로고    scopus 로고
    • On the sure criticality of asks in activity networks with imprecise durations
    • Chanas S., Dubois D., and Zielinski P. On the sure criticality of asks in activity networks with imprecise durations. IEEE Trans Syst Man Cybernet 32 4 (2002) 393-407
    • (2002) IEEE Trans Syst Man Cybernet , vol.32 , Issue.4 , pp. 393-407
    • Chanas, S.1    Dubois, D.2    Zielinski, P.3
  • 5
    • 0018467641 scopus 로고
    • Probabilistic PERT
    • Nadas A. Probabilistic PERT. IBM J Res Develop 23 3 (1979) 339-347
    • (1979) IBM J Res Develop , vol.23 , Issue.3 , pp. 339-347
    • Nadas, A.1
  • 6
    • 61549115011 scopus 로고    scopus 로고
    • Fargier H, Galvagnon V, Dubois D. Fuzzy PERT in series-parallel graphs. In: Proceeding of the 9th IEEE international conference on fuzzy systems; 2000. p. 1074-7.
    • Fargier H, Galvagnon V, Dubois D. Fuzzy PERT in series-parallel graphs. In: Proceeding of the 9th IEEE international conference on fuzzy systems; 2000. p. 1074-7.
  • 7
    • 0000738834 scopus 로고
    • Monte Carlo method and the PERT problem
    • Van Slyke R.M. Monte Carlo method and the PERT problem. Oper Res 11 5 (1963) 839-860
    • (1963) Oper Res , vol.11 , Issue.5 , pp. 839-860
    • Van Slyke, R.M.1
  • 8
    • 0034559444 scopus 로고    scopus 로고
    • On criticality and sensitivity in activity networks
    • Elmaghraby S. On criticality and sensitivity in activity networks. Int J Production Res 127 (2000) 220-238
    • (2000) Int J Production Res , vol.127 , pp. 220-238
    • Elmaghraby, S.1
  • 9
    • 0026854670 scopus 로고
    • Criticality in stochastic networks
    • Williams T.M. Criticality in stochastic networks. Oper Res 43 (1992) 353-357
    • (1992) Oper Res , vol.43 , pp. 353-357
    • Williams, T.M.1
  • 10
    • 0031257870 scopus 로고    scopus 로고
    • An uncertainty importance measure of activities in PERT networks
    • Cho J.G., and Yum B.J. An uncertainty importance measure of activities in PERT networks. Int J Production Res 35 (1997) 237-2770
    • (1997) Int J Production Res , vol.35 , pp. 237-2770
    • Cho, J.G.1    Yum, B.J.2
  • 11
    • 0032646635 scopus 로고    scopus 로고
    • On the sensitivity of project variability to activity mean duration
    • Elmaghraby S., Fathi Y., and Taner M.R. On the sensitivity of project variability to activity mean duration. Int J Production Econom 62 (1999) 219-232
    • (1999) Int J Production Econom , vol.62 , pp. 219-232
    • Elmaghraby, S.1    Fathi, Y.2    Taner, M.R.3
  • 12
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: modelling flexible constraints vs. coping with incomplete knowledge
    • Dubois D., Fargier H., and Fortemps P. Fuzzy scheduling: modelling flexible constraints vs. coping with incomplete knowledge. Eur J Oper Res 147 (2003) 231-252
    • (2003) Eur J Oper Res , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 13
    • 0002146440 scopus 로고
    • The use of fuzzy variables in PERT
    • Chanas S., and Kamburowski J. The use of fuzzy variables in PERT. Fuzzy Set Syst 5 (1981) 11-19
    • (1981) Fuzzy Set Syst , vol.5 , pp. 11-19
    • Chanas, S.1    Kamburowski, J.2
  • 14
    • 0031997813 scopus 로고    scopus 로고
    • Fuzzy set theory applications in production management research: a literature survey
    • Guiffrida A.L., and Nagi R. Fuzzy set theory applications in production management research: a literature survey. J Intelligent Manufact 9 (1998) 39-56
    • (1998) J Intelligent Manufact , vol.9 , pp. 39-56
    • Guiffrida, A.L.1    Nagi, R.2
  • 15
    • 13944250291 scopus 로고    scopus 로고
    • Where do we stand with fuzzy project scheduling?
    • Bonnal P., Gourc D., and Lacoste G. Where do we stand with fuzzy project scheduling?. J Construct Eng Manage 130 1 (2004) 114-123
    • (2004) J Construct Eng Manage , vol.130 , Issue.1 , pp. 114-123
    • Bonnal, P.1    Gourc, D.2    Lacoste, G.3
  • 18
    • 0035670765 scopus 로고    scopus 로고
    • Finding multiple possible critical paths using fuzzy PERT
    • Chen S.M., and Chao T.H. Finding multiple possible critical paths using fuzzy PERT. IEEE Trans Syst Man Cybernet 31 6 (2001) 930-937
    • (2001) IEEE Trans Syst Man Cybernet , vol.31 , Issue.6 , pp. 930-937
    • Chen, S.M.1    Chao, T.H.2
  • 19
    • 38249030792 scopus 로고
    • Project network analysis with fuzzy activities times
    • McCahon C.S., and Lee E.S. Project network analysis with fuzzy activities times. Comput Math Appl 15 (1988) 829-838
    • (1988) Comput Math Appl , vol.15 , pp. 829-838
    • McCahon, C.S.1    Lee, E.S.2
  • 21
    • 0028524436 scopus 로고
    • Fuzzy project-scheduling system for software development
    • Hapke M., Jaszkiewicz A., and Slowinski R. Fuzzy project-scheduling system for software development. Fuzzy Set Syst 67 (1994) 101-117
    • (1994) Fuzzy Set Syst , vol.67 , pp. 101-117
    • Hapke, M.1    Jaszkiewicz, A.2    Slowinski, R.3
  • 22
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis with fuzzy activity times
    • Chanas S., and Zielinski P. Critical path analysis with fuzzy activity times. Fuzzy Set Syst 122 (2001) 195-204
    • (2001) Fuzzy Set Syst , vol.122 , pp. 195-204
    • Chanas, S.1    Zielinski, P.2
  • 23
    • 0027592830 scopus 로고
    • Using PERT as an approximation of fuzzy project-network analysis
    • McCahon C.S. Using PERT as an approximation of fuzzy project-network analysis. IEEE Trans Eng Manage 40 2 (1993) 146-153
    • (1993) IEEE Trans Eng Manage , vol.40 , Issue.2 , pp. 146-153
    • McCahon, C.S.1
  • 24
    • 3342977741 scopus 로고    scopus 로고
    • Bid no bid decision making, a fuzzy linguistic approach
    • Lin C.T., and Ying T.C. Bid no bid decision making, a fuzzy linguistic approach. Int J Project Manage 22 (2004) 585-593
    • (2004) Int J Project Manage , vol.22 , pp. 585-593
    • Lin, C.T.1    Ying, T.C.2
  • 25
    • 0035426615 scopus 로고    scopus 로고
    • Multi-criteria assessment of the probability of winning in the competitive bidding process
    • Cagno E., Caron F., and Perego A. Multi-criteria assessment of the probability of winning in the competitive bidding process. Int J Project Manage 19 (2001) 313-324
    • (2001) Int J Project Manage , vol.19 , pp. 313-324
    • Cagno, E.1    Caron, F.2    Perego, A.3
  • 26
    • 0035197791 scopus 로고    scopus 로고
    • Application of the AHP to project management
    • Kamal M., and Al-Subhi A.H. Application of the AHP to project management. Int J Project Manage 19 (2001) 19-27
    • (2001) Int J Project Manage , vol.19 , pp. 19-27
    • Kamal, M.1    Al-Subhi, A.H.2
  • 27
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for select the proper project delivery method using analytical hierarchy process (AHP)
    • Mahdi I., and Alreshaid K. Decision support system for select the proper project delivery method using analytical hierarchy process (AHP). Int J Project Manage 23 (2005) 564-572
    • (2005) Int J Project Manage , vol.23 , pp. 564-572
    • Mahdi, I.1    Alreshaid, K.2
  • 28
    • 33749207989 scopus 로고    scopus 로고
    • R&D project selection using ANP
    • Meade L.A., and Presley A. R&D project selection using ANP. IEEE Potential 21 2 (2002) 22-28
    • (2002) IEEE Potential , vol.21 , Issue.2 , pp. 22-28
    • Meade, L.A.1    Presley, A.2
  • 32
    • 0020798185 scopus 로고
    • Fuzzy network planning
    • Gazdik I. Fuzzy network planning. IEEE Trans Reliab 32 3 (1983) 304-313
    • (1983) IEEE Trans Reliab , vol.32 , Issue.3 , pp. 304-313
    • Gazdik, I.1
  • 33
    • 0019909393 scopus 로고
    • Generalized CPM time cost tradeoff algorithm
    • Goyal S.K. Generalized CPM time cost tradeoff algorithm. J Inst Engrs (India), Mech Div 62 (1982) 135-138
    • (1982) J Inst Engrs (India), Mech Div , vol.62 , pp. 135-138
    • Goyal, S.K.1
  • 34
    • 0030286425 scopus 로고    scopus 로고
    • Fuzzy priority heuristic for project scheduling
    • Hapke M., and Slowinski R. Fuzzy priority heuristic for project scheduling. Fuzzy Set Syst 83 (1996) 291-299
    • (1996) Fuzzy Set Syst , vol.83 , pp. 291-299
    • Hapke, M.1    Slowinski, R.2
  • 37
    • 0036457204 scopus 로고    scopus 로고
    • Selecting plant location via a fuzzy TOPSIS approach
    • Chu T.C. Selecting plant location via a fuzzy TOPSIS approach. Int J Adv Manufact Technol 20 (2002) 859-864
    • (2002) Int J Adv Manufact Technol , vol.20 , pp. 859-864
    • Chu, T.C.1
  • 38
    • 0037274844 scopus 로고    scopus 로고
    • A fuzzy TOPSIS Method for robot selection
    • Chu T.C., and Lin Y.C. A fuzzy TOPSIS Method for robot selection. Int J Adv Manufact Technol 21 (2003) 284-290
    • (2003) Int J Adv Manufact Technol , vol.21 , pp. 284-290
    • Chu, T.C.1    Lin, Y.C.2
  • 39
    • 33748090609 scopus 로고    scopus 로고
    • Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment
    • Wang Y.M., and Elhang T.M. Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment. Export Syst Appl 31 (2006) 309-319
    • (2006) Export Syst Appl , vol.31 , pp. 309-319
    • Wang, Y.M.1    Elhang, T.M.2
  • 40
    • 33645566484 scopus 로고    scopus 로고
    • Plant location selection based on fuzzy TOPSIS
    • Yong D. Plant location selection based on fuzzy TOPSIS. Int J Adv Manufact Technol 28 (2006) 839-844
    • (2006) Int J Adv Manufact Technol , vol.28 , pp. 839-844
    • Yong, D.1
  • 41
    • 0030623301 scopus 로고    scopus 로고
    • Fuzzy credibility relation method for multiple criteria decision making
    • Hsu H.M., and Chen C.T. Fuzzy credibility relation method for multiple criteria decision making. Inform Sci 96 (1997) 79-91
    • (1997) Inform Sci , vol.96 , pp. 79-91
    • Hsu, H.M.1    Chen, C.T.2
  • 43
    • 33748969213 scopus 로고    scopus 로고
    • Parameterized defuzzification with maximum entropy weighting function - another view of the weighting function expectation method
    • Liu X. Parameterized defuzzification with maximum entropy weighting function - another view of the weighting function expectation method. Math Comput Modell 45 (2007) 177-188
    • (2007) Math Comput Modell , vol.45 , pp. 177-188
    • Liu, X.1