메뉴 건너뛰기




Volumn 15, Issue 1, 1997, Pages 19-38

Criteria for contractor selection

Author keywords

Bid evaluation; Criteria assessment; Information; Prequalification

Indexed keywords

SCREENING;

EID: 0002576968     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/014461997373088     Document Type: Article
Times cited : (229)

References (41)
  • 5
    • 0019552530 scopus 로고
    • Cost-plus contractor selection: A case study
    • Diekmann, J.E. (1981) Cost-plus contractor selection: a case study. Journal of the Technical Councils, ASCE, 107(TC1), 13-25.
    • (1981) Journal of the Technical Councils, ASCE , vol.107 , Issue.TC1 , pp. 13-25
    • Diekmann, J.E.1
  • 6
    • 0038588608 scopus 로고
    • Cost-time bidding concept: An innovative approach
    • Ellis, R.D. and Herbsman, Z.J. (1991) Cost-time bidding concept: an innovative approach. Transportation Research Record, 1282, 89-94.
    • (1991) Transportation Research Record , vol.1282 , pp. 89-94
    • Ellis, R.D.1    Herbsman, Z.J.2
  • 8
    • 0041949611 scopus 로고
    • University of Manchester Institute of Science and Technology, UK
    • Hardy, S.C. (1978) Bid Evaluation Study for the World Bank, Vol 1. University of Manchester Institute of Science and Technology, UK.
    • (1978) Bid Evaluation Study for the World Bank , vol.1
    • Hardy, S.C.1
  • 11
    • 0017416667 scopus 로고
    • The evaluation of contractor management during source selection
    • Helmer, F.T. and Taylor, R.M. (1977) The evaluation of contractor management during source selection, in Proceedings of AIIE Annual Conference, Spring, pp. 3-12.
    • (1977) Proceedings of AIIE Annual Conference , vol.SPRING , pp. 3-12
    • Helmer, F.T.1    Taylor, R.M.2
  • 12
    • 0027698346 scopus 로고
    • Kingsford Smith Airport, Sydney: Planning and tendering the new parallel runway
    • November 93
    • Herbert, C.P. and Biggart, T.P. (1993) Kingsford Smith Airport, Sydney: planning and tendering the new parallel runway. Proceedings of the Institution of Civil Engineers, November 93, 182-9.
    • (1993) Proceedings of the Institution of Civil Engineers , pp. 182-189
    • Herbert, C.P.1    Biggart, T.P.2
  • 13
    • 0026838162 scopus 로고
    • Multiparameter bidding system-innovation in contract administration
    • Herbsman, Z. and Ellis, R. (1992) Multiparameter bidding system-innovation in contract administration. Journal of Construction Engineering and Management, 118(1), 142-50.
    • (1992) Journal of Construction Engineering and Management , vol.118 , Issue.1 , pp. 142-150
    • Herbsman, Z.1    Ellis, R.2
  • 15
    • 0038618183 scopus 로고
    • Factors influencing UK construction clients' choice of contractor
    • Holt, G.D., Olomolaiye, P.O. and Frank, C.H. (1994) Factors influencing UK construction clients' choice of contractor. Building and Environment, 29(2), 241-8.
    • (1994) Building and Environment , vol.29 , Issue.2 , pp. 241-248
    • Holt, G.D.1    Olomolaiye, P.O.2    Frank, C.H.3
  • 19
    • 0004178374 scopus 로고
    • Final Report of the Government/Industry Review of Procurement and contractual Arrangements in the UK Construction Industry, HMSO, London
    • Latham, M. (1994) Constructing The Team. Final Report of the Government/Industry Review of Procurement and contractual Arrangements in the UK Construction Industry, HMSO, London.
    • (1994) Constructing the Team
    • Latham, M.1
  • 22
    • 0025385269 scopus 로고
    • Bid evaluation for UK public sector construction contracts
    • Feb.
    • Merna, A. and Smith, N. J. (1990) Bid evaluation for UK public sector construction contracts in Proceedings of the Institution of Civil Engineers, Pt. 1 88, Feb., 91-105.
    • (1990) Proceedings of the Institution of Civil Engineers , vol.88 , Issue.1 PART , pp. 91-105
    • Merna, A.1    Smith, N.J.2
  • 23
    • 0022129458 scopus 로고
    • Selecting a contractor for fast-track projects, Pt II. Quantitative evaluation method
    • Moore, M.J. (1985) Selecting a contractor for fast-track projects, Pt II. Quantitative evaluation method. Plant Engineering, 39(18), 54-6.
    • (1985) Plant Engineering , vol.39 , Issue.18 , pp. 54-56
    • Moore, M.J.1
  • 28
    • 85033307960 scopus 로고    scopus 로고
    • NJCC (1994) Letter from Alan Turner, Chairman, NJCC, 31st March, 1994
    • NJCC (1994) Letter from Alan Turner, Chairman, NJCC, 31st March, 1994.
  • 29
    • 0004582101 scopus 로고
    • A comparison of contractual arrangements for building projects
    • Nahapiet, H. and Nahapiet, J. (1985) A comparison of contractual arrangements for building projects. Construction Management and Economics, 3, 217-31.
    • (1985) Construction Management and Economics , vol.3 , pp. 217-231
    • Nahapiet, H.1    Nahapiet, J.2
  • 32
    • 85033286634 scopus 로고    scopus 로고
    • RICS, The Royal Institution of Chartered Surveyors (1993) Geographical directory, RICS
    • RICS, The Royal Institution of Chartered Surveyors (1993) Geographical directory, RICS.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.