메뉴 건너뛰기




Volumn 54, Issue 1-4, 2011, Pages 393-401

Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria

Author keywords

Activity; Critical path; Fuzzy number; Linguistic variable; Multi attribute decision making; Quality

Indexed keywords

ACTIVITY; CRITICAL PATH; FUZZY NUMBER; LINGUISTIC VARIABLE; MULTI-ATTRIBUTE DECISION MAKING; QUALITY;

EID: 79955646762     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2928-4     Document Type: Article
Times cited : (38)

References (29)
  • 1
    • 34249099938 scopus 로고    scopus 로고
    • Analysis of critical paths in a project network with fuzzy activity times
    • Chen SP (2007) Analysis of critical paths in a project network with fuzzy activity times. Eur J Oper Res 183:442-459
    • (2007) Eur J Oper Res , vol.183 , pp. 442-459
    • Chen, S.P.1
  • 2
    • 0001620447 scopus 로고
    • Critical path planning and scheduling mathematical basis
    • Kelley JE (1961) Critical path planning and scheduling mathematical basis. Oper Res 9:296-320
    • (1961) Oper Res , vol.9 , pp. 296-320
    • Kelley, J.E.1
  • 4
    • 49349133217 scopus 로고
    • Fuzzy sets as basisfor a theory of possibility
    • Zadeh LA (1978) Fuzzy sets as basisfor a theory of possibility. Fuzzy Sets Syst 1:3-28
    • (1978) Fuzzy Sets Syst , vol.1 , pp. 3-28
    • Zadeh, L.A.1
  • 5
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • DOI 10.1016/S0165-0114(00)00076-2, PII S0165011400000762
    • Chanas S, Zielinski P (2001) Critical path analysis in the network with fuzzy activity times. Fuzzy Sets Syst 122:195-204 (Pubitemid 32590547)
    • (2001) Fuzzy Sets and Systems , vol.122 , Issue.2 , pp. 195-204
    • Chanas, S.1    Zielinski, P.2
  • 6
    • 34047265638 scopus 로고    scopus 로고
    • Applying fuzzy method for measuring criticality in project network
    • Chen CT, Huang SF (2007) Applying fuzzy method for measuring criticality in project network. Inf Sci 177:2448-2458
    • (2007) Inf Sci , vol.177 , pp. 2448-2458
    • Chen, C.T.1    Huang, S.F.2
  • 7
    • 0037410241 scopus 로고    scopus 로고
    • Fuzzy temporal characteristics of operations for project management on the network models basis
    • Slyeptsov AI, Tyshchuk TA (2003) Fuzzy temporal characteristics of operations for project management on the network models basis. Eur J Oper Res 147:253-265
    • (2003) Eur J Oper Res , vol.147 , pp. 253-265
    • Slyeptsov, A.I.1    Tyshchuk, T.A.2
  • 8
    • 61549092460 scopus 로고    scopus 로고
    • A fuzzy multicriteria approach for critical path definition
    • Zammori FA, Braglia M, Frosolini M (2009) A fuzzy multicriteria approach for critical path definition. Int J Project Manage 27:278-291
    • (2009) Int J Project Manage , vol.27 , pp. 278-291
    • Zammori, F.A.1    Braglia, M.2    Frosolini, M.3
  • 9
    • 11144288983 scopus 로고    scopus 로고
    • On computing the latest starting times and floats of activities in a network with imprecise durations
    • DOI 10.1016/j.fss.2004.08.007, PII S0165011404003550
    • Zielinski P (2005) On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Sets Syst 150:53-76 (Pubitemid 40034587)
    • (2005) Fuzzy Sets and Systems , vol.150 , Issue.1 , pp. 53-76
    • Zielinski, P.1
  • 10
    • 0031084308 scopus 로고    scopus 로고
    • BIFPET methodology versus PERT in project management: Fuzzy probability instead of the beta distribution
    • Shipley MF, Korvin A, Omer K (1997) BIFPET methodology versus PERT in project management: Fuzzy probability instead of the beta distribution. J Eng Tech Manage 14:46-65
    • (1997) J Eng Tech Manage , vol.14 , pp. 46-65
    • Shipley, M.F.1    Korvin, A.2    Omer, K.3
  • 12
    • 0036466460 scopus 로고    scopus 로고
    • The computational complexity of the criticality problems in a network with interval activity times
    • DOI 10.1016/S0377-2217(01)00048-0, PII S0377221701000480
    • Chanas S, Zielinski P (2002) The computational complexity of criticality problems in a network with interval activity times. Eur J Oper Res 136:541-550 (Pubitemid 33094120)
    • (2002) European Journal of Operational Research , vol.136 , Issue.3 , pp. 541-550
    • Chanas, S.1    Zielinski, P.2
  • 13
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria
    • Atkinson R (1999) Project management: Cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria. Int J Project Manage 17:337-342
    • (1999) Int J Project Manage , vol.17 , pp. 337-342
    • Atkinson, R.1
  • 14
    • 0003898887 scopus 로고    scopus 로고
    • PMI Standards Committee 3rd edition Project Management Institute
    • PMI Standards Committee (1996) A guide to the project management body of knowledge, 3rd edition. Project Management Institute.
    • (1996) A Guide to the Project Management Body of Knowledge
  • 15
    • 0035426615 scopus 로고    scopus 로고
    • Multi-criteria assessment of the probability of winning in the competitive bidding process
    • DOI 10.1016/S0263-7863(00)00020-X, PII S026378630000020X
    • Cagno E, Caron F, Perego A (2001) Multi-criteria assessment of the probability of winning in the competitive bidding process. Int J Project Manage 19:313-324 (Pubitemid 32646671)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 313-324
    • Cagno, E.1    Caron, F.2    Perego, A.3
  • 16
    • 3342977741 scopus 로고    scopus 로고
    • Bid no bid decision making, a fuzzy linguistic approach
    • Lin CT, Ying TC, Frosolini M (2004) Bid no bid decision making, a fuzzy linguistic approach. Int J Project Manage 22:585-593
    • (2004) Int J Project Manage , vol.22 , pp. 585-593
    • Lin, C.T.1    Ying, T.C.2    Frosolini, M.3
  • 17
    • 0035197791 scopus 로고    scopus 로고
    • Application of the AHP to project management
    • Kamal M, Al-Subhi AH (2001) Application of the AHP to project management. Int J Project Manage 19:19-27
    • (2001) Int J Project Manage , vol.19 , pp. 19-27
    • Kamal, M.1    Al-Subhi, A.H.2
  • 18
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for select the proper project delivery method using analytical hierarchy process (AHP)
    • Mahdi I, Alreshaid K (2005) Decision support system for select the proper project delivery method using analytical hierarchy process (AHP). Int J Project Manage 23:567-572
    • (2005) Int J Project Manage , vol.23 , pp. 567-572
    • Mahdi, I.1    Alreshaid, K.2
  • 19
    • 33749207989 scopus 로고    scopus 로고
    • R&D project selection using ANP
    • Meade LA, Presley A (2002) R&D project selection using ANP. IEEE Potential 21(2):22-28
    • (2002) IEEE Potential , vol.21 , Issue.2 , pp. 22-28
    • Meade, L.A.1    Presley, A.2
  • 20
    • 46549093655 scopus 로고
    • Fuzzy hierarchical analysis
    • Buckley JJ (1985) Fuzzy hierarchical analysis. Fuzzy Sets Syst 17:233-247
    • (1985) Fuzzy Sets Syst , vol.17 , pp. 233-247
    • Buckley, J.J.1
  • 21
    • 0002296389 scopus 로고    scopus 로고
    • Extensions of the TOPSIS for group decisionmaking under fuzzy environment
    • Chen CT (2000) Extensions of the TOPSIS for group decisionmaking under fuzzy environment. Fuzzy Sets Syst 114:1-9
    • (2000) Fuzzy Sets Syst , vol.114 , pp. 1-9
    • Chen, C.T.1
  • 24
    • 0016458950 scopus 로고
    • The concept of a linguistic variable and its application to approximate reasoning
    • 301-357(II)
    • Zadeh LA (1975) The concept of a linguistic variable and its application to approximate reasoning. Inform Sci 8(I):199-249, 301-357(II)
    • (1975) Inform Sci , vol.8 , Issue.1 , pp. 199-249
    • Zadeh, L.A.1
  • 26
    • 33646523595 scopus 로고    scopus 로고
    • A fuzzy approach for supplier evaluation and selection in supply chain management
    • Chen CT, Lin CT, Huang SF (2006) A fuzzy approach for supplier evaluation and selection in supply chain management. Int J Prod Econ 102:289-301
    • (2006) Int J Prod Econ , vol.102 , pp. 289-301
    • Chen, C.T.1    Lin, C.T.2    Huang, S.F.3
  • 29
    • 0019585325 scopus 로고
    • A procedure for ordering fuzzy subsets of the unit interval
    • Yager RR (1981) A procedure for ordering fuzzy subsets of the unit interval. Inf Sci 24:143-161
    • (1981) Inf Sci , vol.24 , pp. 143-161
    • Yager, R.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.