-
2
-
-
84859059479
-
Reassessing tradeoffs inherent to simultaneous maintenance and production planning
-
S. Batun, and L.M. Maillart Reassessing tradeoffs inherent to simultaneous maintenance and production planning Production and Operations Management 21 2012 396 403
-
(2012)
Production and Operations Management
, vol.21
, pp. 396-403
-
-
Batun, S.1
Maillart, L.M.2
-
3
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
M. Ben-Daya The economic production lot-sizing problem with imperfect production processes and imperfect maintenance International Journal of Production Economics 76 2002 257 264
-
(2002)
International Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
4
-
-
0039029278
-
The impact of imperfect processes on production run times
-
T. Boone, R. Ganeshan, Y.M. Guo, and J.K. Ord The impact of imperfect processes on production run times Decision Sciences 31 2000 773 787
-
(2000)
Decision Sciences
, vol.31
, pp. 773-787
-
-
Boone, T.1
Ganeshan, R.2
Guo, Y.M.3
Ord, J.K.4
-
5
-
-
22444439337
-
Integrating preventive maintenance planning and production scheduling for a single machine
-
C.R. Cassady, and E. Kutanoglu Integrating preventive maintenance planning and production scheduling for a single machine IEEE Transactions on Reliability 54 2005 304 309
-
(2005)
IEEE Transactions on Reliability
, vol.54
, pp. 304-309
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
7
-
-
62549088275
-
Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties
-
F. Dehayem Nodem, J. Kenne, and A. Gharbi Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties European Journal of Operational Research 198 2009 173 189
-
(2009)
European Journal of Operational Research
, vol.198
, pp. 173-189
-
-
Dehayem Nodem, F.1
Kenne, J.2
Gharbi, A.3
-
8
-
-
35348992049
-
Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy
-
S. El-Ferik Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy European Journal of Operational Research 186 2008 150 163
-
(2008)
European Journal of Operational Research
, vol.186
, pp. 150-163
-
-
El-Ferik, S.1
-
9
-
-
0032678956
-
The value of observing the condition of a deteriorating machine
-
S.M. Gilbert, and H.M. Bar The value of observing the condition of a deteriorating machine Naval Research Logistics 46 1999 790 808
-
(1999)
Naval Research Logistics
, vol.46
, pp. 790-808
-
-
Gilbert, S.M.1
Bar, H.M.2
-
10
-
-
0029291051
-
Managing a deteriorating process in a batch production environment
-
S.M. Gilbert, and H. Emmons Managing a deteriorating process in a batch production environment IIE Transactions 27 1995 233 243
-
(1995)
IIE Transactions
, vol.27
, pp. 233-243
-
-
Gilbert, S.M.1
Emmons, H.2
-
11
-
-
0026927270
-
Production batching with machine breakdowns and safety stocks
-
H. Groenevelt, L. Pintelon, and A. Seidmann Production batching with machine breakdowns and safety stocks Operations Research 40 1992 959 971
-
(1992)
Operations Research
, vol.40
, pp. 959-971
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
14
-
-
0032096710
-
The economic manufacturing lot-sizing problem with imperfect manufacturing processes: Bounds and optimal solutions
-
M. Hariga, and M. Ben-Daya The economic manufacturing lot-sizing problem with imperfect manufacturing processes: bounds and optimal solutions Naval Research Logistics 45 1998 423 433
-
(1998)
Naval Research Logistics
, vol.45
, pp. 423-433
-
-
Hariga, M.1
Ben-Daya, M.2
-
15
-
-
84989665786
-
Multiaction maintenance under Markovian deterioration and incomplete state information
-
W.J. Hopp, and S.-C. Wu Multiaction maintenance under Markovian deterioration and incomplete state information Naval Research Logistics 35 1988 447 462
-
(1988)
Naval Research Logistics
, vol.35
, pp. 447-462
-
-
Hopp, W.J.1
Wu, S.-C.2
-
16
-
-
0025494698
-
Machine maintenance with multiple maintenance actions
-
W.J. Hopp, and S.-C. Wu Machine maintenance with multiple maintenance actions IIE Transactions 22 1990 226 232
-
(1990)
IIE Transactions
, vol.22
, pp. 226-232
-
-
Hopp, W.J.1
Wu, S.-C.2
-
17
-
-
0036568125
-
Integrated maintenance and production control of a deteriorating production system
-
S.M.R. Iravani, and I. Duenyas Integrated maintenance and production control of a deteriorating production system IIE Transactions 34 2002 423 435
-
(2002)
IIE Transactions
, vol.34
, pp. 423-435
-
-
Iravani, S.M.R.1
Duenyas, I.2
-
18
-
-
77953869584
-
Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer
-
C. Karamatsoukis, and E. Kyriakidis Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer European Journal of Operational Research 207 2010 297 308
-
(2010)
European Journal of Operational Research
, vol.207
, pp. 297-308
-
-
Karamatsoukis, C.1
Kyriakidis, E.2
-
19
-
-
38049004960
-
Production policies for multi-product systems with deteriorating process condition
-
B. Kazaz, and T. Sloan Production policies for multi-product systems with deteriorating process condition IIE Transactions 40 2008 187 205
-
(2008)
IIE Transactions
, vol.40
, pp. 187-205
-
-
Kazaz, B.1
Sloan, T.2
-
20
-
-
0035340520
-
Optimal production run length and inspection schedules in a deteriorating production process
-
C.H. Kim, Y. Hong, and S.Y. Chang Optimal production run length and inspection schedules in a deteriorating production process IIE Transactions 33 2001 421 426
-
(2001)
IIE Transactions
, vol.33
, pp. 421-426
-
-
Kim, C.H.1
Hong, Y.2
Chang, S.Y.3
-
21
-
-
29144471680
-
Machine scheduling with an availability constraint
-
J.Y.-T. Leung, Models, and Performance Analysis CRC Press Boca Raton, FL
-
C.Y. Lee Machine scheduling with an availability constraint J.Y.-T. Leung, Handbook of Scheduling: Algorithms Models, and Performance Analysis 2004 CRC Press Boca Raton, FL
-
(2004)
Handbook of Scheduling: Algorithms
-
-
Lee, C.Y.1
-
22
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
H.L. Lee, and M.J. Rosenblatt Simultaneous determination of production cycle and inspection schedules in a production system Management Science 33 1987 1125 1136
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
23
-
-
0024914068
-
A production and maintenance planning model with restoration cost dependent on detection delay
-
H.L. Lee, and M.J. Rosenblatt A production and maintenance planning model with restoration cost dependent on detection delay IIE Transactions 21 1989 368 375
-
(1989)
IIE Transactions
, vol.21
, pp. 368-375
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
24
-
-
0026220964
-
Joint determination of production cycle and inspection intervals in a deteriorating production system
-
J.S. Lee, and K.S. Park Joint determination of production cycle and inspection intervals in a deteriorating production system Journal of the Operational Research Society 42 1991 775 783
-
(1991)
Journal of the Operational Research Society
, vol.42
, pp. 775-783
-
-
Lee, J.S.1
Park, K.S.2
-
25
-
-
56249098653
-
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
-
G. Liao, Y.H. Chen, and S. Sheu Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance European Journal of Operational Research 195 2009 348 357
-
(2009)
European Journal of Operational Research
, vol.195
, pp. 348-357
-
-
Liao, G.1
Chen, Y.H.2
Sheu, S.3
-
26
-
-
0032021393
-
Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections
-
V. Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections Naval Research Logistics 45 1998 165 186
-
(1998)
Naval Research Logistics
, vol.45
, pp. 165-186
-
-
Makis, V.1
-
28
-
-
79952698290
-
Service level robustness in stochastic production planning under random machine breakdowns
-
M. Nourelfath Service level robustness in stochastic production planning under random machine breakdowns European Journal of Operational Research 212 2011 81 88
-
(2011)
European Journal of Operational Research
, vol.212
, pp. 81-88
-
-
Nourelfath, M.1
-
29
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
E.L. Porteus Optimal lot sizing, process quality improvement and setup cost reduction Operations Research 34 1986 137 144
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
30
-
-
0000312965
-
The impact of inspection delay on process and inspection lot sizing
-
E.L. Porteus The impact of inspection delay on process and inspection lot sizing Management Science 36 1990 999 1007
-
(1990)
Management Science
, vol.36
, pp. 999-1007
-
-
Porteus, E.L.1
-
32
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1986 48 54
-
(1986)
IIE Transactions
, vol.18
, pp. 48-54
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
33
-
-
70249126214
-
An economic production lot size model in an imperfect production system
-
S.S. Sana An economic production lot size model in an imperfect production system European Journal of Operational Research 201 2010 158 170
-
(2010)
European Journal of Operational Research
, vol.201
, pp. 158-170
-
-
Sana, S.S.1
-
34
-
-
69249219084
-
A production-inventory model in an imperfect production process
-
S.S. Sana A production-inventory model in an imperfect production process European Journal of Operational Research 200 2010 451 464
-
(2010)
European Journal of Operational Research
, vol.200
, pp. 451-464
-
-
Sana, S.S.1
-
35
-
-
3042555850
-
A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield
-
T.W. Sloan A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield Journal of the Operational Research Society 55 2004 647 656
-
(2004)
Journal of the Operational Research Society
, vol.55
, pp. 647-656
-
-
Sloan, T.W.1
-
36
-
-
41049093115
-
Simultaneous determination of production and maintenance schedules using inline equipment condition and yield information
-
T.W. Sloan Simultaneous determination of production and maintenance schedules using inline equipment condition and yield information Naval Research Logistics 55 2008 116 129
-
(2008)
Naval Research Logistics
, vol.55
, pp. 116-129
-
-
Sloan, T.W.1
-
37
-
-
0008193301
-
Combined production and maintenance scheduling for a multiple-product, single-machine production system
-
T.W. Sloan, and J.G. Shanthikumar Combined production and maintenance scheduling for a multiple-product, single-machine production system Production and Operations Management 9 2000 379 399
-
(2000)
Production and Operations Management
, vol.9
, pp. 379-399
-
-
Sloan, T.W.1
Shanthikumar, J.G.2
-
38
-
-
0036468407
-
Using in-line equipment and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs
-
T.W. Sloan, and J.G. Shanthikumar Using in-line equipment and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs IIE Transactions 34 2002 191 209
-
(2002)
IIE Transactions
, vol.34
, pp. 191-209
-
-
Sloan, T.W.1
Shanthikumar, J.G.2
-
39
-
-
0033701964
-
Multiaction maintenance subject to action-dependent risk and stochastic failure
-
C.-T. Su, S.-C. Wu, and C.-C. Chang Multiaction maintenance subject to action-dependent risk and stochastic failure European Journal of Operational Research 125 2000 133 148
-
(2000)
European Journal of Operational Research
, vol.125
, pp. 133-148
-
-
Su, C.-T.1
Wu, S.-C.2
Chang, C.-C.3
-
40
-
-
0037118559
-
A survey of maintenance policies of deteriorating systems
-
H. Wang A survey of maintenance policies of deteriorating systems European Journal of Operational Research 139 2002 469 489
-
(2002)
European Journal of Operational Research
, vol.139
, pp. 469-489
-
-
Wang, H.1
-
41
-
-
0001198301
-
Lot sizing with random yields: A review
-
C.A. Yano, and H.L. Lee Lot sizing with random yields: a review Operations Research 43 1995 311 334
-
(1995)
Operations Research
, vol.43
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.L.2
|