-
1
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
Ben-Daya, M. (2002) The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics, 76, pp. 257-264.
-
(2002)
International Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
2
-
-
0039029278
-
The impact of imperfect processes on production run times
-
Boone, T., Ganeshan, R., Guo, Y. M. and Ord, J. K. (2000) The impact of imperfect processes on production run times. Decision Sciences, 31, pp. 773-787.
-
(2000)
Decision Sciences
, vol.31
, pp. 773-787
-
-
Boone, T.1
Ganeshan, R.2
Guo, Y.M.3
Ord, J.K.4
-
3
-
-
0003935148
-
-
McGraw-Hill, New York, NY
-
Heyman, D. P. and Sobel, M. J. (1984) Stochastic Models in Operations Research, Volume II: Stochastic Optimization, McGraw-Hill, New York, NY
-
(1984)
Stochastic Models in Operations Research, Volume II: Stochastic Optimization
-
-
Heyman, D.P.1
Sobel, M.J.2
-
5
-
-
0015682809
-
Optimal replacement rules when changes of state are semi-Markovian
-
Kao, E. P. C. (1973) Optimal replacement rules when changes of state are semi-Markovian. Operations Research, 21, pp. 1231-1249.
-
(1973)
Operations Research
, vol.21
, pp. 1231-1249
-
-
Kao, E.P.C.1
-
6
-
-
0035340520
-
Optimal production run length and inspection schedules in a deteriorating production process
-
Kim, C. H., Hong, Y. S. and Chang, S. Y. (2001) Optimal production run length and inspection schedules in a deteriorating production process. IIE Transactions, 33, pp. 421-426.
-
(2001)
IIE Transactions
, vol.33
, pp. 421-426
-
-
Kim, C.H.1
Hong, Y.S.2
Chang, S.Y.3
-
7
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee, H. L. and Rosenblatt, M. J. (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33, pp. 1125-1136.
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
8
-
-
0024914068
-
A production and maintenance planning model with restoration cost dependent on detection delay
-
Lee, H. L. and Rosenblatt, M. J. (1989) A production and maintenance planning model with restoration cost dependent on detection delay. IIE Transactions, 21, pp. 368-375.
-
(1989)
IIE Transactions
, vol.21
, pp. 368-375
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
9
-
-
0026220964
-
Joint determination of production cycle and inspection intervals in a deteriorating production system
-
Lee, J. S. and Park, K. S. (1991) Joint determination of production cycle and inspection intervals in a deteriorating production system. Journal of the Operational Research Society, 42, pp. 775-783.
-
(1991)
Journal of the Operational Research Society
, vol.42
, pp. 775-783
-
-
Lee, J.S.1
Park, K.S.2
-
10
-
-
0031699435
-
An EMQ model with inspections and random machine failures
-
Makis, V. and Fung, J. (1998) An EMQ model with inspections and random machine failures. Journal of the Operational Research Society, 49, pp. 66-76.
-
(1998)
Journal of the Operational Research Society
, vol.49
, pp. 66-76
-
-
Makis, V.1
Fung, J.2
-
11
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus, E. L. (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, pp. 137-144.
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
12
-
-
0000312965
-
The impact of inspection delay on process and inspection lot sizing
-
Porteus, E. L. (1990) The impact of inspection delay on process and inspection lot sizing. Management Science, 36, pp. 999-1007.
-
(1990)
Management Science
, vol.36
, pp. 999-1007
-
-
Porteus, E.L.1
-
14
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt, M. J. and Lee, H. L. (1986) Economic production cycles with imperfect production processes. IIE Transactions, 18, pp. 48-54.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-54
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
15
-
-
0008193301
-
Combined production and maintenance scheduling for a multiple-product, single-machine production system
-
Sloan, T. W. and Shanthikumar, J. G. (2000) Combined production and maintenance scheduling for a multiple-product, single-machine production system. Production and Operations Management, 9, pp. 379-399.
-
(2000)
Production and Operations Management
, vol.9
, pp. 379-399
-
-
Sloan, T.W.1
Shanthikumar, J.G.2
-
16
-
-
0036468407
-
Using in-line equipment and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs
-
Sloan, T. W. and Shanthikumar, J. G. (2002) Using in-line equipment and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs. IIE Transactions, 34, pp. 191-209.
-
(2002)
IIE Transactions
, vol.34
, pp. 191-209
-
-
Sloan, T.W.1
Shanthikumar, J.G.2
-
18
-
-
0001198301
-
Lot sizing with random yields: A review
-
Yano, C. A. and Lee, H. L. (1995) Lot sizing with random yields: A review. Operations Research, 43, pp. 311-334.
-
(1995)
Operations Research
, vol.43
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.L.2
-
19
-
-
1342308593
-
Optimal buffer inventory and preventive maintenance for an imperfect production process
-
Zequeira, R. I., Prida, B. and Valdes, J. E. (2004) Optimal buffer inventory and preventive maintenance for an imperfect production process. International Journal of Production Research, 42, pp. 959-974.
-
(2004)
International Journal of Production Research
, vol.42
, pp. 959-974
-
-
Zequeira, R.I.1
Prida, B.2
Valdes, J.E.3
|