메뉴 건너뛰기




Volumn 198, Issue 1, 2009, Pages 173-189

Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties

Author keywords

Damage failures; Imperfect repairs; Manufacturing systems; Numerical methods; Optimal control; Production planning; Replacement

Indexed keywords

DECISION MAKING; HIGHWAY BRIDGES; MACHINE SHOP PRACTICE; NUMBER THEORY; NUMERICAL METHODS; OPTIMAL CONTROL SYSTEMS; OPTIMIZATION; PLANNING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; PROJECT MANAGEMENT; SENSITIVITY ANALYSIS;

EID: 62549088275     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2008.09.001     Document Type: Article
Times cited : (33)

References (28)
  • 1
    • 3042640180 scopus 로고    scopus 로고
    • The elixir of life: Using a maintenance, repair and replacement model based on virtual and operating age in the water industry
    • Ansell J.I., Archibald T.W., and Thomas L.C. The elixir of life: Using a maintenance, repair and replacement model based on virtual and operating age in the water industry. IMA Journal of Management Mathematics 15 2 (2004) 151-160
    • (2004) IMA Journal of Management Mathematics , vol.15 , Issue.2 , pp. 151-160
    • Ansell, J.I.1    Archibald, T.W.2    Thomas, L.C.3
  • 3
    • 0025481509 scopus 로고
    • Manufacturing flow control and preventive maintenance: A stochastic control approach
    • Boukas E.-K., and Haurie A. Manufacturing flow control and preventive maintenance: A stochastic control approach. IEEE Transactions on Automatic Control 35 9 (1990) 1024-1031
    • (1990) IEEE Transactions on Automatic Control , vol.35 , Issue.9 , pp. 1024-1031
    • Boukas, E.-K.1    Haurie, A.2
  • 4
    • 0037115791 scopus 로고    scopus 로고
    • Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
    • Coudert T., Grabot B., and Archimede B. Production/maintenance cooperative scheduling using multi-agents and fuzzy logic. International Journal of Production Research 40 18 (2002) 4611-4632
    • (2002) International Journal of Production Research , vol.40 , Issue.18 , pp. 4611-4632
    • Coudert, T.1    Grabot, B.2    Archimede, B.3
  • 6
    • 0033737583 scopus 로고    scopus 로고
    • Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
    • Gharbi A., and Kenne J.P. Production and preventive maintenance rates control for a manufacturing system: An experimental design approach. International Journal of Production Economics 65 3 (2000) 275-287
    • (2000) International Journal of Production Economics , vol.65 , Issue.3 , pp. 275-287
    • Gharbi, A.1    Kenne, J.P.2
  • 7
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiple-machine manufacturing systems
    • Gharbi A., and Kenne J.-P. Maintenance scheduling and production control of multiple-machine manufacturing systems. Computers and Industrial Engineering 48 4 (2005) 693-707
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.4 , pp. 693-707
    • Gharbi, A.1    Kenne, J.-P.2
  • 8
    • 0037278646 scopus 로고    scopus 로고
    • Hierarchical control of production and maintenance rates in manufacturing systems
    • Kenne J.P., and Boukas E.K. Hierarchical control of production and maintenance rates in manufacturing systems. Journal of Quality in Maintenance Engineering 9 1 (2003) 66-82
    • (2003) Journal of Quality in Maintenance Engineering , vol.9 , Issue.1 , pp. 66-82
    • Kenne, J.P.1    Boukas, E.K.2
  • 9
    • 33750995575 scopus 로고    scopus 로고
    • Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
    • Kenne J.-P., Gharbi A., and Beit M. Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale. European Journal of Operational Research 178 2 (2007) 408-420
    • (2007) European Journal of Operational Research , vol.178 , Issue.2 , pp. 408-420
    • Kenne, J.-P.1    Gharbi, A.2    Beit, M.3
  • 10
    • 0002192597 scopus 로고
    • Some results for repairable systems with general repair
    • Kijima M. Some results for repairable systems with general repair. Journal of Applied Probability 26 (1989) 89-102
    • (1989) Journal of Applied Probability , vol.26 , pp. 89-102
    • Kijima, M.1
  • 13
    • 0037056107 scopus 로고    scopus 로고
    • A fuzzy logic approach to an integrated maintenance/production scheduling algorithm
    • Labib A.W., and Sudiarso A. A fuzzy logic approach to an integrated maintenance/production scheduling algorithm. International Journal of Production Research 40 13 (2002) 3121-3138
    • (2002) International Journal of Production Research , vol.40 , Issue.13 , pp. 3121-3138
    • Labib, A.W.1    Sudiarso, A.2
  • 14
    • 0031652274 scopus 로고    scopus 로고
    • SMDP approach to optimal repair/replacement decisions for systems experiencing imperfect repairs
    • Love C.E., Zitron M.A., and Zhang Z.G. SMDP approach to optimal repair/replacement decisions for systems experiencing imperfect repairs. Journal of Quality in Maintenance Engineering 4 2 (1998) 131-149
    • (1998) Journal of Quality in Maintenance Engineering , vol.4 , Issue.2 , pp. 131-149
    • Love, C.E.1    Zitron, M.A.2    Zhang, Z.G.3
  • 15
    • 0033701507 scopus 로고    scopus 로고
    • Discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs
    • Love C.E., Zhang Z.G., Zitron M.A., and Guo R. Discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs. European Journal of Operational Research 125 2 (2000) 398-409
    • (2000) European Journal of Operational Research , vol.125 , Issue.2 , pp. 398-409
    • Love, C.E.1    Zhang, Z.G.2    Zitron, M.A.3    Guo, R.4
  • 18
    • 0024935615 scopus 로고
    • Replacement policies for a cumulative damage model with minimal repair at failure
    • Nakagawa T., and Kijima M. Replacement policies for a cumulative damage model with minimal repair at failure. IEEE Transactions on Reliability 38 5 (1989) 581-584
    • (1989) IEEE Transactions on Reliability , vol.38 , Issue.5 , pp. 581-584
    • Nakagawa, T.1    Kijima, M.2
  • 20
    • 0016451588 scopus 로고
    • Control of systems with jump markov disturbances
    • June 18-21
    • Rishel, R., 1975. Control of systems with jump markov disturbances. In: Jt Automatic Control Conference, 15th, Proceedings, June 18-21, 1974, pp. 246-249.
    • (1974) Jt Automatic Control Conference, 15th, Proceedings , pp. 246-249
    • Rishel, R.1
  • 22
    • 0030259688 scopus 로고    scopus 로고
    • Estimating parameters of intensity function and maintenance effect for repairable unit
    • Shin I., Lim T.J., and Lie C.H. Estimating parameters of intensity function and maintenance effect for repairable unit. Reliability Engineering and System Safety 54 1 (1996) 1-10
    • (1996) Reliability Engineering and System Safety , vol.54 , Issue.1 , pp. 1-10
    • Shin, I.1    Lim, T.J.2    Lie, C.H.3
  • 23
    • 84930581460 scopus 로고
    • Feedback control of class of linear systems with jump parameters
    • Sworder D.D. Feedback control of class of linear systems with jump parameters. IEEE Transactions on Automatic Control 14 (1969) 8-14
    • (1969) IEEE Transactions on Automatic Control , vol.14 , pp. 8-14
    • Sworder, D.D.1
  • 24
    • 0024718118 scopus 로고
    • A survey of preventive maintenance models for stochastically deteriorating single-unit systems
    • Valdez-Flores C., and Feldman R. A survey of preventive maintenance models for stochastically deteriorating single-unit systems. Naval Research Logistics Quarterly 36 (1989) 419-446
    • (1989) Naval Research Logistics Quarterly , vol.36 , pp. 419-446
    • Valdez-Flores, C.1    Feldman, R.2
  • 25
    • 2942592614 scopus 로고    scopus 로고
    • Decision making in industrial production planning using fuzzy linear programming
    • Vasant P., Nagarajan R., and Yaacob S. Decision making in industrial production planning using fuzzy linear programming. IMA Journal Management Mathematics 15 1 (2004) 53-65
    • (2004) IMA Journal Management Mathematics , vol.15 , Issue.1 , pp. 53-65
    • Vasant, P.1    Nagarajan, R.2    Yaacob, S.3
  • 26
    • 0031259285 scopus 로고    scopus 로고
    • Numerical method in optimal production and setup scheduling of stochastic manufacturing systems
    • Yan H., and Zhang Q. Numerical method in optimal production and setup scheduling of stochastic manufacturing systems. IEEE Transactions on Automatic Control 42 10 (1997) 1452-1455
    • (1997) IEEE Transactions on Automatic Control , vol.42 , Issue.10 , pp. 1452-1455
    • Yan, H.1    Zhang, Q.2
  • 28
    • 56149097098 scopus 로고
    • Fuzzy Set
    • second ed. Kluwer Academic Publishers. ISBN 0-7923-9075-X
    • Zimmermann, H., 1990. Fuzzy Set. Theory and Its Applications, second ed. Kluwer Academic Publishers. ISBN 0-7923-9075-X.
    • (1990) Theory and Its Applications
    • Zimmermann, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.