-
1
-
-
34249669630
-
A review of some issues and identification of some barriers in the implementation of FMS
-
10.1007/s10696-007-9015-7 1170.91422 10.1007/s10696-007-9015-7
-
Raj T, Shankar R, Suhaib M (2007) A review of some issues and identification of some barriers in the implementation of FMS. Int J Flex Manuf Syst 19(1):1-40. doi: 10.1007/s10696-007-9015-7
-
(2007)
Int J Flex Manuf Syst
, vol.19
, Issue.1
, pp. 1-40
-
-
Raj, T.1
Shankar, R.2
Suhaib, M.3
-
2
-
-
44649188498
-
A parametric fuzzy logic approach to dynamic part routing under full routing flexibility
-
10.1016/j.cie.2007.11.013
-
Bilge Ü, FIrat M, Albey E (2008) A parametric fuzzy logic approach to dynamic part routing under full routing flexibility. Comput Ind Eng 55(1):15-33
-
(2008)
Comput Ind Eng
, vol.55
, Issue.1
, pp. 15-33
-
-
Bilge, Ü.1
Firat, M.2
Albey, E.3
-
3
-
-
67651021668
-
An operational measure of routing flexibility in a multi-stage multi-product production system
-
10.1007/s00170-008-1711-2
-
Yu MC, Greene TJ (2009) An operational measure of routing flexibility in a multi-stage multi-product production system. Int J Adv Manuf Technol 43(3-4):357-364
-
(2009)
Int J Adv Manuf Technol
, vol.43
, Issue.3-4
, pp. 357-364
-
-
Yu, M.C.1
Greene, T.J.2
-
5
-
-
26444479778
-
Optimization by simulated annealing
-
702485 1225.90162 10.1126/science.220.4598.671
-
Kirkpatrick S, Gelatt CD, Vecchi MP (1983) Optimization by simulated annealing. Science 220(4598):671-680
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
7
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
868908 10.1016/0305-0548(86)90048-1
-
Glover F (1986) Future paths for integer programming and links to artificial intelligence. Comput Oper Res 5(5):533-549
-
(1986)
Comput Oper Res
, vol.5
, Issue.5
, pp. 533-549
-
-
Glover, F.1
-
8
-
-
0002400184
-
Distributed optimization by ant colonies
-
Varela FJ, Bourgine P (eds) MIT Press, Cambridge
-
Colorni A, Dorigo M, Maniezzo V (1992) Distributed optimization by ant colonies. In: Varela FJ, Bourgine P (eds) Proceedings of the First European Conference on Artificial Life (pp. 134-142). MIT Press, Cambridge
-
(1992)
Proceedings of the First European Conference on Artificial Life
, pp. 134-142
-
-
Colorni, A.1
Dorigo, M.2
Maniezzo, V.3
-
11
-
-
84872486158
-
Meta-heuristics for real time routing selection in FMS. Book chapter
-
Benyoucef L, Grabot B (eds) 2010. ISBN 978-1-84996-118-9, Springer-Verlag
-
Souier M, Hassam A, Sari Z (2010) Meta-heuristics for real time routing selection in FMS. Book chapter in: Benyoucef L, Grabot B (eds) Artificial intelligence techniques for networked manufacturing enterprises management, ch. 8, pp 222-270, 2010. ISBN 978-1-84996-118-9, Springer-Verlag
-
(2010)
Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management, Ch. 8
, pp. 222-270
-
-
Souier, M.1
Hassam, A.2
Sari, Z.3
-
12
-
-
33745684417
-
Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm
-
Jerald J, Asokan P, Saravanan R, Delphin Carolina Rani A (2006) Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm. Int J Adv Manuf Technol 29(5-6):584-589
-
(2006)
Int J Adv Manuf Technol
, vol.29
, Issue.5-6
, pp. 584-589
-
-
Jerald, J.1
Asokan, P.2
Saravanan, R.3
Delphin Carolina Rani, A.4
-
13
-
-
1042300749
-
A comprehensive survey and future trend of simulation study on FMS scheduling
-
10.1023/B:JIMS.0000010077.27141.be
-
Chan FTS, Chan HK (2004) A comprehensive survey and future trend of simulation study on FMS scheduling. J Intell Manuf 15(1):87-102
-
(2004)
J Intell Manuf
, vol.15
, Issue.1
, pp. 87-102
-
-
Chan, F.T.S.1
Chan, H.K.2
-
14
-
-
6944224399
-
Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems
-
1138.90385 10.1023/B:FLEX.0000044839.27404.92
-
Saygin C, Kilic SE (2004) Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems. Int J Flex Manuf Syst 16(2):169-182
-
(2004)
Int J Flex Manuf Syst
, vol.16
, Issue.2
, pp. 169-182
-
-
Saygin, C.1
Kilic, S.E.2
-
15
-
-
0142216504
-
Real-time scheduling with deadlock avoidance in flexible manufacturing systems
-
10.1007/s00170-002-1468-y
-
ElMekkawy TY, ElMaraghy HA (2003) Real-time scheduling with deadlock avoidance in flexible manufacturing systems. Int J Adv Manuf Technol 22(3-4):259-270
-
(2003)
Int J Adv Manuf Technol
, vol.22
, Issue.3-4
, pp. 259-270
-
-
Elmekkawy, T.Y.1
Elmaraghy, H.A.2
-
16
-
-
0344443735
-
An evaluative study of operation grouping policies in an FMS
-
10.1023/A:1026369010026
-
Sabuncuoglu I, Lahmar M (2003) An evaluative study of operation grouping policies in an FMS. Int J Flex Manuf Syst 15(3):217-239
-
(2003)
Int J Flex Manuf Syst
, vol.15
, Issue.3
, pp. 217-239
-
-
Sabuncuoglu, I.1
Lahmar, M.2
-
17
-
-
0035371898
-
Scheduling of the optimal tool replacement times in a flexible manufacturing system
-
Liu PH, Makis V, Jardine AKS (2001) Scheduling of the optimal tool replacement times in a flexible manufacturing system. IIE Trans 33(6):487-495
-
(2001)
IIE Trans
, vol.33
, Issue.6
, pp. 487-495
-
-
Liu, P.H.1
Makis, V.2
Jardine, A.K.S.3
-
18
-
-
79960994342
-
Evaluation of routing flexibility of a flexible manufacturing system using simulation modelling and analysis
-
10.1007/s00170-011-3153-5
-
Joseph OA, Sridharan R (2011) Evaluation of routing flexibility of a flexible manufacturing system using simulation modelling and analysis. Int J Adv Manuf Technol 56(1-4):273-289
-
(2011)
Int J Adv Manuf Technol
, vol.56
, Issue.1-4
, pp. 273-289
-
-
Joseph, O.A.1
Sridharan, R.2
-
19
-
-
13544260531
-
A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: Threshold-based alternate routing
-
2136400 1064.90015 10.1016/j.ejor.2004.01.044
-
Ozmutlu S, Harmonosky CM (2005) A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: Threshold-based alternate routing. Eur J Oper Res 166(2):369-384
-
(2005)
Eur J Oper Res
, vol.166
, Issue.2
, pp. 369-384
-
-
Ozmutlu, S.1
Harmonosky, C.M.2
-
20
-
-
61749101177
-
Application of the analytical hierarchy process for real-time scheduling and part routing in advanced manufacturing systems
-
10.1016/j.jmsy.2008.08.002
-
Buyurgan N, Saygin C (2008) Application of the analytical hierarchy process for real-time scheduling and part routing in advanced manufacturing systems. J Manuf Syst 27(3):101-110
-
(2008)
J Manuf Syst
, vol.27
, Issue.3
, pp. 101-110
-
-
Buyurgan, N.1
Saygin, C.2
-
21
-
-
32644482372
-
A multi-objective scheduling framework for flexible manufacturing systems
-
10.1080/00207540500412016
-
Buyurgan N, Mendoza A (2006) A multi-objective scheduling framework for flexible manufacturing systems. Int J Prod Res 44(7):1273-1295
-
(2006)
Int J Prod Res
, vol.44
, Issue.7
, pp. 1273-1295
-
-
Buyurgan, N.1
Mendoza, A.2
-
22
-
-
31644449737
-
An integrated control framework for flexible manufacturing systems
-
10.1007/s00170-004-2311-4
-
Buyurgan N, Saygin C (2006) An integrated control framework for flexible manufacturing systems. Int J Adv Manuf Technol 27(11-12):1248-1259
-
(2006)
Int J Adv Manuf Technol
, vol.27
, Issue.11-12
, pp. 1248-1259
-
-
Buyurgan, N.1
Saygin, C.2
-
23
-
-
79961011457
-
Effects of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of a flexible manufacturing system
-
10.1007/s00170-011-3158-0
-
Joseph OA, Sridharan R (2011) Effects of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of a flexible manufacturing system. Int J Adv Manuf Technol 56(1-4):291-306
-
(2011)
Int J Adv Manuf Technol
, vol.56
, Issue.1-4
, pp. 291-306
-
-
Joseph, O.A.1
Sridharan, R.2
-
24
-
-
0032648655
-
Integrating flexible manufacturing systems with scheduling in flexible manufacturing system
-
10.1007/s001700050066
-
Saygin C, Kilic SE (1999) Integrating flexible manufacturing systems with scheduling in flexible manufacturing system. Int J Adv Manuf Technol 15(4):268-280
-
(1999)
Int J Adv Manuf Technol
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Kilic, S.E.2
-
25
-
-
0035195362
-
Real-time manipulation of alternative routings in flexible manufacturing systems: A simulation study
-
10.1007/s001700170019
-
Saygin C, Chen FF, Singh J (2001) Real-time manipulation of alternative routings in flexible manufacturing systems: a simulation study. Int J Adv Manuf Technol 18(10):755-763
-
(2001)
Int J Adv Manuf Technol
, vol.18
, Issue.10
, pp. 755-763
-
-
Saygin, C.1
Chen, F.F.2
Singh, J.3
-
26
-
-
56749095424
-
Variable neighborhood genetic algorithm for the flexible job shop scheduling problems
-
10.1007/978-3-540-88518-4-54
-
Zhang G, Gao L, Li X, Li P (2008) Variable neighborhood genetic algorithm for the flexible job shop scheduling problems. Lecture Notes in Computer Science 5315:503-512
-
(2008)
Lecture Notes in Computer Science
, vol.5315
, pp. 503-512
-
-
Zhang, G.1
Gao, L.2
Li, X.3
Li, P.4
-
27
-
-
38949091830
-
A genetic algorithm- based optimization model for scheduling flexible assembly lines
-
10.1007/s00170-006-0818-6
-
Guo ZX, Wong WK, Leung SYS, Fan JT, Chan SF (2008) A genetic algorithm- based optimization model for scheduling flexible assembly lines. Int J Adv Manuf Technol 36:156-168
-
(2008)
Int J Adv Manuf Technol
, vol.36
, pp. 156-168
-
-
Guo, Z.X.1
Wong, W.K.2
Leung, S.Y.S.3
Fan, J.T.4
Chan, S.F.5
-
28
-
-
55649092878
-
An effective hybrid genetic algorithm for the job shop scheduling problem
-
10.1007/s00170-007-1354-8
-
Zhang C, Rao Y, Li P (2008) An effective hybrid genetic algorithm for the job shop scheduling problem. Int J Adv Manuf Technol 39:965-974
-
(2008)
Int J Adv Manuf Technol
, vol.39
, pp. 965-974
-
-
Zhang, C.1
Rao, Y.2
Li, P.3
-
29
-
-
78650179774
-
A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
-
10.1007/s00170-010-2642-2
-
Wang X, Gao L, Zhang C, Shao X (2010) A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem. Int J Adv Manuf Technol 51(5-8):757-767
-
(2010)
Int J Adv Manuf Technol
, vol.51
, Issue.5-8
, pp. 757-767
-
-
Wang, X.1
Gao, L.2
Zhang, C.3
Shao, X.4
-
30
-
-
78650682362
-
An effective genetic algorithm for the flexible job shop scheduling problem
-
10.1016/j.eswa.2010.08.145
-
Zhang G, Gao L, Shi Y (2011) An effective genetic algorithm for the flexible job shop scheduling problem. Expert Syst Appl 38(4):3563-3573
-
(2011)
Expert Syst Appl
, vol.38
, Issue.4
, pp. 3563-3573
-
-
Zhang, G.1
Gao, L.2
Shi, Y.3
-
31
-
-
34047181443
-
A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem
-
2308718 1123.90041 10.1016/j.cor.2005.12.002
-
Zhang C, Li P, Guan Z, Rao Y (2007) A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem. Comput Oper Res 34:3229-3242
-
(2007)
Comput Oper Res
, vol.34
, pp. 3229-3242
-
-
Zhang, C.1
Li, P.2
Guan, Z.3
Rao, Y.4
-
32
-
-
41749104232
-
A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem
-
2412981 1146.90427 10.1016/j.ejor.2007.06.039
-
Vilcot G, Billaut J (2008) A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem. Eur J Oper Res 190:398-411
-
(2008)
Eur J Oper Res
, vol.190
, pp. 398-411
-
-
Vilcot, G.1
Billaut, J.2
-
33
-
-
33744540562
-
Pareto archived simulated annealing for job shop scheduling with multiple objectives
-
10.1007/s00170-004-2492-x
-
Suresh RK, Mohanasundaram KM (2006) Pareto archived simulated annealing for job shop scheduling with multiple objectives. Int J Adv Manuf Technol 29:184-196
-
(2006)
Int J Adv Manuf Technol
, vol.29
, pp. 184-196
-
-
Suresh, R.K.1
Mohanasundaram, K.M.2
-
34
-
-
38049071597
-
MAS equipped with ant colony applied into dynamic job shop scheduling, book chapter
-
Kang K, Zhang R, Yang Y (2007) MAS equipped with ant colony applied into dynamic job shop scheduling, book chapter In: Advanced intelligent computing theories and applications. With aspects of artificial intelligence, book series: Lecture Notes in Computer Science 4682: 823-835
-
(2007)
Advanced Intelligent Computing Theories and Applications. with Aspects of Artificial Intelligence, Book Series: Lecture Notes in Computer Science
, vol.4682
, pp. 823-835
-
-
Kang, K.1
Zhang, R.2
Yang, Y.3
-
35
-
-
59449087081
-
Hybridizing tabu search with ant colony optimization for solving job shop scheduling problems
-
10.1007/s00170-008-1404-x
-
Eswaramurthy VP, Tamilarasi A (2009) Hybridizing tabu search with ant colony optimization for solving job shop scheduling problems. Int J Adv Manuf Technol 40(9-10):1004-1015
-
(2009)
Int J Adv Manuf Technol
, vol.40
, Issue.9-10
, pp. 1004-1015
-
-
Eswaramurthy, V.P.1
Tamilarasi, A.2
-
36
-
-
41449114635
-
A Pareto archive particle swarm optimization for multi-objective job shop scheduling
-
10.1016/j.cie.2007.11.007
-
Lei D (2008) A Pareto archive particle swarm optimization for multi-objective job shop scheduling. Comput Ind Eng 54:960-971
-
(2008)
Comput Ind Eng
, vol.54
, pp. 960-971
-
-
Lei, D.1
-
37
-
-
67349174559
-
An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
-
10.1016/j.cie.2008.07.021
-
Zhang G, Shao X, Li P, Gao L (2009) An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem. Comput Ind Eng 56(4):1309-1318
-
(2009)
Comput Ind Eng
, vol.56
, Issue.4
, pp. 1309-1318
-
-
Zhang, G.1
Shao, X.2
Li, P.3
Gao, L.4
-
39
-
-
50849115206
-
An improved genetic algorithm for job shop scheduling problems using Taguchi-based crossover
-
10.1007/s00170-007-1142-5
-
Tsai J, Liu T, Ho W, Chou J (2008) An improved genetic algorithm for job shop scheduling problems using Taguchi-based crossover. Int J Adv Manuf Technol 38:987-994
-
(2008)
Int J Adv Manuf Technol
, vol.38
, pp. 987-994
-
-
Tsai, J.1
Liu, T.2
Ho, W.3
Chou, J.4
-
40
-
-
52649172737
-
Ant colony system for job shop scheduling with time windows
-
10.1007/s00170-007-1203-9
-
Huang R, Yang C (2008) Ant colony system for job shop scheduling with time windows. Int J Adv Manuf Technol 39:151-157
-
(2008)
Int J Adv Manuf Technol
, vol.39
, pp. 151-157
-
-
Huang, R.1
Yang, C.2
-
41
-
-
33847755451
-
Flexible job shop scheduling with tabu search algorithms
-
10.1007/s00170-005-0375-4
-
Saidi-Mehrabad M, Fattahi P (2007) Flexible job shop scheduling with tabu search algorithms. Int J Adv Manuf Technol 32:563-570
-
(2007)
Int J Adv Manuf Technol
, vol.32
, pp. 563-570
-
-
Saidi-Mehrabad, M.1
Fattahi, P.2
-
42
-
-
40249108426
-
An efficient simple metaheuristic for minimizing the makespan in two machine no-wait job shops
-
1139.90011 10.1016/j.cor.2007.02.017
-
Liaw C (2008) An efficient simple metaheuristic for minimizing the makespan in two machine no-wait job shops. Comput Oper Res 35:3276-3283
-
(2008)
Comput Oper Res
, vol.35
, pp. 3276-3283
-
-
Liaw, C.1
-
43
-
-
0035246266
-
A genetic algorithm approach to the scheduling of FMSs with multiple routes
-
10.1023/A:1008148313360
-
Zhao C, Wu Z (2001) A genetic algorithm approach to the scheduling of FMSs with multiple routes. Int J Flex Manuf Syst 13(1):71-88
-
(2001)
Int J Flex Manuf Syst
, vol.13
, Issue.1
, pp. 71-88
-
-
Zhao, C.1
Wu, Z.2
-
44
-
-
34247624966
-
Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimization method
-
10.1016/j.rcim.2006.06.004
-
Rossi A, Dini G (2007) Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimization method. Robotics and Computer-Integrated Manufacturing 23(5):503-516
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, Issue.5
, pp. 503-516
-
-
Rossi, A.1
Dini, G.2
-
45
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents
-
10.1109/3477.484436
-
Dorigo M, Maniezzo V, Colorni A (1996) Ant system: optimization by a colony of cooperating agents. The IEEE Transactions on Systems, Man and Cybernetics, Part B 26(1):29-41
-
(1996)
The IEEE Transactions on Systems, Man and Cybernetics, Part B.
, vol.26
, Issue.1
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
46
-
-
5744249209
-
Equations of state calculations by fast computing machines
-
10.1063/1.1699114
-
Metropolis N, Rosenbluth AW, Rosenbluth MN, Teller AH, Teller E (1953) Equations of state calculations by fast computing machines. J Chem Phys 21(6):1087-1091
-
(1953)
J Chem Phys
, vol.21
, Issue.6
, pp. 1087-1091
-
-
Metropolis, N.1
Rosenbluth, A.W.2
Rosenbluth, M.N.3
Teller, A.H.4
Teller, E.5
-
48
-
-
38849205466
-
A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem with makespan criterion
-
2586401 1144.90393 10.1016/j.cor.2006.12.030
-
Pan QK, Tasgetiren MF, Liang YC (2008) A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem with makespan criterion. Comput Oper Res 35(9):2807-2839
-
(2008)
Comput Oper Res
, vol.35
, Issue.9
, pp. 2807-2839
-
-
Pan, Q.K.1
Tasgetiren, M.F.2
Liang, Y.C.3
-
49
-
-
84867922216
-
An electromagnetism-like mechanism for global optimization
-
1961528 1047.90045 10.1023/A:1022452626305
-
Birbil SI, Fang S (2003) An electromagnetism-like mechanism for global optimization. J Glob Optim 25(3):263-282
-
(2003)
J Glob Optim
, vol.25
, Issue.3
, pp. 263-282
-
-
Birbil, S.I.1
Fang, S.2
-
50
-
-
38049009487
-
A hybrid electromagnetism-like algorithm for single machine scheduling problem
-
Huang D, Heutte L, Loog M (eds) Springer Berlin/Heidelberg
-
Chen S, Chang P, Chan C, Mani V (2007) A hybrid electromagnetism-like algorithm for single machine scheduling problem. In: Huang D, Heutte L, Loog M (eds) Advanced intelligent computing theories and applications. With Aspects of Artificial Intelligence (pp 543-552), Springer Berlin/Heidelberg
-
(2007)
Advanced Intelligent Computing Theories and Applications. with Aspects of Artificial Intelligence
, pp. 543-552
-
-
Chen, S.1
Chang, P.2
Chan, C.3
Mani, V.4
|