메뉴 건너뛰기




Volumn 166, Issue 2, 2005, Pages 369-384

A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: Threshold-based alternate routing

Author keywords

Alternate machine selection; Alternate routings; Flexible manufacturing systems; Routing flexibility; Scheduling

Indexed keywords

CONTROL SYSTEM ANALYSIS; COSTS; OPTIMIZATION; REAL TIME SYSTEMS; REGRESSION ANALYSIS; SCHEDULING;

EID: 13544260531     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.01.044     Document Type: Article
Times cited : (22)

References (43)
  • 1
    • 0022604509 scopus 로고
    • Solution of scheduling problems of job-shop type FMS with alternative machine tools
    • Abdin M.F. Solution of scheduling problems of job-shop type FMS with alternative machine tools. Computers and Industrial Engineering. 11(1):1986;19-21
    • (1986) Computers and Industrial Engineering , vol.11 , Issue.1 , pp. 19-21
    • Abdin, M.F.1
  • 2
    • 0032311652 scopus 로고    scopus 로고
    • Some effects of flexibility and dependability on cellular manufacturing system performance
    • Albino V., Garavelli A.C. Some effects of flexibility and dependability on cellular manufacturing system performance. Computers and Industrial Engineering. 35(4):1998;491-494
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.4 , pp. 491-494
    • Albino, V.1    Garavelli, A.C.2
  • 4
    • 0031248431 scopus 로고    scopus 로고
    • An approach to developing multi-level fractional factorial designs
    • Bingham T.C. An approach to developing multi-level fractional factorial designs. Journal of Quality Technology. 29(4):1997;370-380
    • (1997) Journal of Quality Technology , vol.29 , Issue.4 , pp. 370-380
    • Bingham, T.C.1
  • 5
    • 0025644101 scopus 로고
    • Machine loading and alternate routing in a flexible manufacturing system
    • Bretthauer K.M., Venkataramanan M.A. Machine loading and alternate routing in a flexible manufacturing system. Computers and Industrial Engineering. 18(3):1990;341-350
    • (1990) Computers and Industrial Engineering , vol.18 , Issue.3 , pp. 341-350
    • Bretthauer, K.M.1    Venkataramanan, M.A.2
  • 6
    • 0031210787 scopus 로고    scopus 로고
    • Real-time operational control of an FMS with full routing flexibility
    • Bryne M.D., Chutima P. Real-time operational control of an FMS with full routing flexibility. International Journal of Production Economics. 51(1-2):1997;109-113
    • (1997) International Journal of Production Economics , vol.51 , Issue.1-2 , pp. 109-113
    • Bryne, M.D.1    Chutima, P.2
  • 8
  • 9
    • 0033115993 scopus 로고    scopus 로고
    • Evaluations of operational control rules in scheduling a flexible manufacturing system
    • Chan F.T.S. Evaluations of operational control rules in scheduling a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing. 15(2):1999;121-132
    • (1999) Robotics and Computer-Integrated Manufacturing , vol.15 , Issue.2 , pp. 121-132
    • Chan, F.T.S.1
  • 13
    • 0023824587 scopus 로고
    • Evaluation of traditional work scheduling rules in a FMS with a physical simulator
    • Choi R.H., Malstrom E.M. Evaluation of traditional work scheduling rules in a FMS with a physical simulator. Journal of Manufacturing Systems. 24:1988;33-45
    • (1988) Journal of Manufacturing Systems , vol.24 , pp. 33-45
    • Choi, R.H.1    Malstrom, E.M.2
  • 16
    • 0027675841 scopus 로고
    • Investigations into the impact of flexibility on manufacturing performance
    • Das S.K., Nagendra P. Investigations into the impact of flexibility on manufacturing performance. International Journal of Production Research. 31(10):1993;2337-2354
    • (1993) International Journal of Production Research , vol.31 , Issue.10 , pp. 2337-2354
    • Das, S.K.1    Nagendra, P.2
  • 20
    • 0026904594 scopus 로고
    • Routing flexibility and production scheduling in a flexible manufacturing system
    • Ghosh S., Gaimon C. Routing flexibility and production scheduling in a flexible manufacturing system. European Journal of Operational Research. 60:1992;344-364
    • (1992) European Journal of Operational Research , vol.60 , pp. 344-364
    • Ghosh, S.1    Gaimon, C.2
  • 22
    • 0024608478 scopus 로고
    • Effects of alternate routings under variable lot size conditions
    • Hancock T.M. Effects of alternate routings under variable lot size conditions. International Journal of Production Research. 27(2):1989;247-259
    • (1989) International Journal of Production Research , vol.27 , Issue.2 , pp. 247-259
    • Hancock, T.M.1
  • 27
    • 0032162529 scopus 로고    scopus 로고
    • Analysing the trade-off between efficiency and flexibility in cellular manufacturing systems
    • Kannan V.R. Analysing the trade-off between efficiency and flexibility in cellular manufacturing systems. Production Planning and Control. 9(6):1998;572-579
    • (1998) Production Planning and Control , vol.9 , Issue.6 , pp. 572-579
    • Kannan, V.R.1
  • 28
    • 0031103522 scopus 로고    scopus 로고
    • A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
    • Logendran R., Sonthinen A. A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems. Journal of the Operational Research Society. 48:1997;246-277
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 246-277
    • Logendran, R.1    Sonthinen, A.2
  • 30
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • Morad N., Zalzala A. Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing. 10(2):1999;169-179
    • (1999) Journal of Intelligent Manufacturing , vol.10 , Issue.2 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 31
    • 0027046206 scopus 로고
    • An expert system for real-time scheduling in flexible manufacturing systems
    • Naidu E.B., Viswanadham N. An expert system for real-time scheduling in flexible manufacturing systems. Information and Decision Technologies. 18:1992;151-170
    • (1992) Information and Decision Technologies , vol.18 , pp. 151-170
    • Naidu, E.B.1    Viswanadham, N.2
  • 33
    • 0037657912 scopus 로고    scopus 로고
    • Managing the job shop: Simulating the effects of flexibility, order release mechanisms and sequencing rules
    • Newman W.R., Maffei M.J. Managing the job shop: Simulating the effects of flexibility, order release mechanisms and sequencing rules. Integrated Manufacturing Systems. 10(5):1999;266-275
    • (1999) Integrated Manufacturing Systems , vol.10 , Issue.5 , pp. 266-275
    • Newman, W.R.1    Maffei, M.J.2
  • 35
    • 0032311540 scopus 로고    scopus 로고
    • Real-time control and scheduling of flexible manufacturing systems: An ordinal optimization based approach
    • Peng C., Chen F.F. Real-time control and scheduling of flexible manufacturing systems: An ordinal optimization based approach. International Journal of Advanced Manufacturing Technology. 14(10):1998;775-786
    • (1998) International Journal of Advanced Manufacturing Technology , vol.14 , Issue.10 , pp. 775-786
    • Peng, C.1    Chen, F.F.2
  • 37
    • 0033078813 scopus 로고    scopus 로고
    • Accommodating FMS operational contingencies through routing flexibility
    • Reveliotis S.A. Accommodating FMS operational contingencies through routing flexibility. IEEE Transactions on Robotics and Automation. 15(1):1999;3-19
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , Issue.1 , pp. 3-19
    • Reveliotis, S.A.1
  • 38
    • 0025262878 scopus 로고
    • Multi-criteria operational control rules in flexible manufacturing systems (FMSs)
    • Ro I.K., Kim J.I. Multi-criteria operational control rules in flexible manufacturing systems (FMSs). International Journal of Production Research. 28(1):1990;47-63
    • (1990) International Journal of Production Research , vol.28 , Issue.1 , pp. 47-63
    • Ro, I.K.1    Kim, J.I.2
  • 39
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin C., Kilic S.E. Integrating flexible process plans with scheduling in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology. 15(4):1999;268-280
    • (1999) International Journal of Advanced Manufacturing Technology , vol.15 , Issue.4 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 40
    • 0028517614 scopus 로고
    • A hierarchical model for control of flexible manufacturing systems
    • Sodhi M.S., Askin R.G., Sen S. A hierarchical model for control of flexible manufacturing systems. Journal of Operational Research Society. 45(10):1994;1185-1196
    • (1994) Journal of Operational Research Society , vol.45 , Issue.10 , pp. 1185-1196
    • Sodhi, M.S.1    Askin, R.G.2    Sen, S.3
  • 42
    • 0033341387 scopus 로고    scopus 로고
    • Scheduling with alternatives: A link between process planning and scheduling
    • Weintraub A., Cormier D., Hodgson T., King R., Wilson J., Zozom A. Scheduling with alternatives: A link between process planning and scheduling. IIE Transactions. 31(11):1999;1093-1102
    • (1999) IIE Transactions , vol.31 , Issue.11 , pp. 1093-1102
    • Weintraub, A.1    Cormier, D.2    Hodgson, T.3    King, R.4    Wilson, J.5    Zozom, A.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.