메뉴 건너뛰기




Volumn 44, Issue 7, 2006, Pages 1273-1295

Performance-based dynamic scheduling model for flexible manufacturing systems

Author keywords

Discrete event systems; Finite state machines; Flexible manufacturing systems; Performance based scheduling

Indexed keywords

ALGORITHMS; DATABASE SYSTEMS; MATHEMATICAL MODELS; SCHEDULING; SOFTWARE ENGINEERING;

EID: 32644482372     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540500412016     Document Type: Article
Times cited : (8)

References (36)
  • 1
    • 0031644146 scopus 로고    scopus 로고
    • A state variable model for the fluid approximation of flexible manufacturing systems
    • Balduzzi, F. and Menga, G., A state variable model for the fluid approximation of flexible manufacturing systems, in IEEE International Conference on Robotics and Automation, 1998, 1172-1178.
    • (1998) IEEE International Conference on Robotics and Automation , pp. 1172-1178
    • Balduzzi, F.1    Menga, G.2
  • 2
    • 0000312362 scopus 로고
    • Scheduling and control of flexible manufacturing systems: A critical review
    • Basnet, C. and Mize, J.H., Scheduling and control of flexible manufacturing systems: A critical review. Int. J. Comp. Integ. Manuf., 1994, 7, 340-355.
    • (1994) Int. J. Comp. Integ. Manuf. , vol.7 , pp. 340-355
    • Basnet, C.1    Mize, J.H.2
  • 3
    • 0028369288 scopus 로고
    • Supervisory control of timed discrete event systems
    • Brandin, B.A. and Wonham, W.M., Supervisory control of timed discrete event systems. IEEE Trans, on Auto. Cont., 1994, 39, 329-342.
    • (1994) IEEE Trans, on Auto. Cont. , vol.39 , pp. 329-342
    • Brandin, B.A.1    Wonham, W.M.2
  • 4
    • 0030081902 scopus 로고    scopus 로고
    • The real-time supervisory control of an experimental manufacturing cell
    • Brandin, B. A., The real-time supervisory control of an experimental manufacturing cell. IEEE Trans, on Robot. & Autom., 1996, 12, 1-14.
    • (1996) IEEE Trans, on Robot. & Autom. , vol.12 , pp. 1-14
    • Brandin, B.A.1
  • 5
    • 2642567726 scopus 로고    scopus 로고
    • Tool allocation in flexible manufacturing systems with tool alternatives
    • Buyurgan, N., Saygin, C. and Kilic, S.E., Tool allocation in flexible manufacturing systems with tool alternatives. Robot. Comp. Integ. Manuf., 2004, 20, 341-349.
    • (2004) Robot. Comp. Integ. Manuf. , vol.20 , pp. 341-349
    • Buyurgan, N.1    Saygin, C.2    Kilic, S.E.3
  • 6
    • 32644468681 scopus 로고    scopus 로고
    • An integrated control framework for flexible manufacturing systems
    • (accessed 12 May 2005)
    • Buyurgan, N. and Saygin, C., An integrated control framework for flexible manufacturing systems. Int. J. Adv. Manuf. Tech., 2005. Available online at: www.springeronline.com (accessed 12 May 2005).
    • (2005) Int. J. Adv. Manuf. Tech.
    • Buyurgan, N.1    Saygin, C.2
  • 7
    • 0034802653 scopus 로고    scopus 로고
    • Dynamic scheduling for a flexible manufacturing system. the pre-emptive approach
    • Chan, F.T.S. and Chan, H.K., Dynamic scheduling for a flexible manufacturing system. The pre-emptive approach. Int. J. Adv. Manuf. Tech., 2001, 17, 760-768.
    • (2001) Int. J. Adv. Manuf. Tech. , vol.17 , pp. 760-768
    • Chan, F.T.S.1    Chan, H.K.2
  • 8
    • 1042300749 scopus 로고    scopus 로고
    • A comprehensive survey and future trend of simulation study on FMS scheduling
    • Chan, F.T.S. and Chan, H.K., A comprehensive survey and future trend of simulation study on FMS scheduling. J. Intel. Manuf., 2004, 15, 87-102.
    • (2004) J. Intel. Manuf. , vol.15 , pp. 87-102
    • Chan, F.T.S.1    Chan, H.K.2
  • 10
    • 0024716540 scopus 로고
    • Real-time tool control and job dispatching in flexible manufacturing systems
    • Han, M., Na, Y.K. and Hogg, G.L., Real-time tool control and job dispatching in flexible manufacturing systems. Int. J. Prod. Res., 1989, 27, 1257-1267.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1257-1267
    • Han, M.1    Na, Y.K.2    Hogg, G.L.3
  • 11
    • 0029505630 scopus 로고
    • Simulation-based real-time scheduling: Review of recent developments
    • Harmonosky, C.M., Simulation-based real-time scheduling: review of recent developments, in Winter Simulation Conference, 1995, 220-225.
    • (1995) Winter Simulation Conference , pp. 220-225
    • Harmonosky, C.M.1
  • 12
    • 0027698798 scopus 로고
    • Multiple-pass heuristic rule for job scheduling with due dates
    • He, Z., Yang, T. and Deal, D.E., Multiple-pass heuristic rule for job scheduling with due dates. Int. J. Prod. Res., 1993, 31, 2677-2692.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 2677-2692
    • He, Z.1    Yang, T.2    Deal, D.E.3
  • 14
    • 0034477824 scopus 로고    scopus 로고
    • The synthesis of controllers to handle safety and liveness for timed discrete-event systems. An example in nuclear reactor systems
    • Ho, T.J., The synthesis of controllers to handle safety and liveness for timed discrete-event systems. An example in nuclear reactor systems, in IEEE International Conference onn Control Applications, 2000, 604-609.
    • (2000) IEEE International Conference Onn Control Applications , pp. 604-609
    • Ho, T.J.1
  • 15
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jain, A.K. and Elmaraghy, H.A., Production scheduling/rescheduling in flexible manufacturing. Int. J. Prod. Res., 1997, 35, 281-309.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 281-309
    • Jain, A.K.1    Elmaraghy, H.A.2
  • 17
    • 0037116761 scopus 로고    scopus 로고
    • Multi-objective meta-heuristics: An overview of the current state-of-the art
    • Jones, D., Mirrazavi, S. and Tamiz, M., Multi-objective meta-heuristics: An overview of the current state-of-the art. Euro. J. Op. Res., 2002, 137, 1-9.
    • (2002) Euro. J. Op. Res. , vol.137 , pp. 1-9
    • Jones, D.1    Mirrazavi, S.2    Tamiz, M.3
  • 18
    • 0029354474 scopus 로고
    • Formal models for control of flexible manufacturing cells: Physical and system model
    • Joshi, S.B., Mettala, E.G., Smith, J.S. and Wysk, R.A., Formal models for control of flexible manufacturing cells: physical and system model. IEEE Trans. on Robot. &Autom., 1995, 11, 558-570.
    • (1995) IEEE Trans. on Robot. &Autom. , vol.11 , pp. 558-570
    • Joshi, S.B.1    Mettala, E.G.2    Smith, J.S.3    Wysk, R.A.4
  • 19
    • 0035246622 scopus 로고    scopus 로고
    • A supervisory control approach for execution control of an FMC
    • Kim, S., Park, J. and Leachman, R.C., A supervisory control approach for execution control of an FMC. Int. J. Flex. Manuf. Syst., 2001, 13, 5-13.
    • (2001) Int. J. Flex. Manuf. Syst. , vol.13 , pp. 5-13
    • Kim, S.1    Park, J.2    Leachman, R.C.3
  • 21
    • 32644466110 scopus 로고
    • Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling systems in FMS
    • Maheshwari, S.K. and Khator, S.K., Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling systems in FMS. Int. J. Prod. Res., 1995, 31, 299-309.
    • (1995) Int. J. Prod. Res. , vol.31 , pp. 299-309
    • Maheshwari, S.K.1    Khator, S.K.2
  • 22
    • 0037942166 scopus 로고    scopus 로고
    • Selecting manufacturing system configurations based on performance using AHP
    • Maier-Speredelozzi, V. and Hu, S.J., Selecting manufacturing system configurations based on performance using AHP. Trans, of NAMRI, 2002, 30, 637-644.
    • (2002) Trans, of NAMRI , vol.30 , pp. 637-644
    • Maier-Speredelozzi, V.1    Hu, S.J.2
  • 23
    • 0036681717 scopus 로고    scopus 로고
    • Expert systems in production planning and scheduling: A state-of-the-art survey
    • Metaxiotis, K.S., Askounis, D. and Psarras, J., Expert systems in production planning and scheduling: A state-of-the-art survey. J. Intel. Manuf., 2002, 13, 253-260.
    • (2002) J. Intel. Manuf. , vol.13 , pp. 253-260
    • Metaxiotis, K.S.1    Askounis, D.2    Psarras, J.3
  • 25
    • 0023104549 scopus 로고
    • Supervisory control of a class of discrete event process
    • Ramadge, P.J. and Wonham, W.M., Supervisory control of a class of discrete event process. Siam Cont. & Opt., 1987, 25, 206-230.
    • (1987) Siam Cont. & Opt. , vol.25 , pp. 206-230
    • Ramadge, P.J.1    Wonham, W.M.2
  • 27
    • 0035195362 scopus 로고    scopus 로고
    • Real-time manipulation of alternate routings in flexible manufacturing systems: A simulation study
    • Saygin, C., Chen, F.F. and Singh, J., Real-time manipulation of alternate routings in flexible manufacturing systems: A simulation study. Int. J. Adv. Manuf. Tech., 2001, 18, 755-763.
    • (2001) Int. J. Adv. Manuf. Tech. , vol.18 , pp. 755-763
    • Saygin, C.1    Chen, F.F.2    Singh, J.3
  • 28
    • 32644483250 scopus 로고    scopus 로고
    • Agent-based cooperative manufacturing scheduling: An overview
    • (accessed 11 May 2005)
    • Shen, W., Agent-based cooperative manufacturing scheduling: An overview. COVE Newsletter, 2, 2001. Available online at: www.lcmi.ufsc.br (accessed 11 May 2005).
    • (2001) COVE Newsletter , vol.2
    • Shen, W.1
  • 29
    • 0012258315 scopus 로고    scopus 로고
    • Multiobjective dynamic scheduling using discrete event simulation
    • Sivakumar, A.I., Multiobjective dynamic scheduling using discrete event simulation. Int. J. Comp. Integ. Manuf., 2001, 14, 154-167.
    • (2001) Int. J. Comp. Integ. Manuf. , vol.14 , pp. 154-167
    • Sivakumar, A.I.1
  • 30
    • 1342287300 scopus 로고    scopus 로고
    • Auction-based distributed scheduling scheme for flexible manufacturing systems
    • Siwamogsatham, T. and Saygin, C., Auction-based distributed scheduling scheme for flexible manufacturing systems. Int. J. Prod. Res., 2004, 42, 547-572.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 547-572
    • Siwamogsatham, T.1    Saygin, C.2
  • 32
    • 0027542572 scopus 로고
    • The design of flexible manufacturing systems
    • Spano, M.R., O'Grady, P.J. and Young, R.E., The design of flexible manufacturing systems. Comp. in Ind., 1993, 21, 185-198.
    • (1993) Comp. in Ind. , vol.21 , pp. 185-198
    • Spano, M.R.1    O'Grady, P.J.2    Young, R.E.3
  • 35
    • 0027872654 scopus 로고
    • A two-stage heuristic procedure for scheduling job shops
    • Vancheeswaan, R. and Townsend, M.A., A two-stage heuristic procedure for scheduling job shops. J. Manuf. Syst., 1993, 12, 315-325.
    • (1993) J. Manuf. Syst. , vol.12 , pp. 315-325
    • Vancheeswaan, R.1    Townsend, M.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.