메뉴 건너뛰기




Volumn 16, Issue 2, 2004, Pages 169-182

Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems

Author keywords

Alternative routings; Flexible manufacturing systems; Real time control; Routing flexibility

Indexed keywords

COMPUTER CONTROL; CONTROL SYSTEM ANALYSIS; OBJECT ORIENTED PROGRAMMING; RANDOM PROCESSES; REAL TIME SYSTEMS; ROUTERS;

EID: 6944224399     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1023/B:FLEX.0000044839.27404.92     Document Type: Review
Times cited : (11)

References (54)
  • 3
    • 0033750053 scopus 로고    scopus 로고
    • Design of flexible assembly line to minimize equipment cost
    • Bukchin, J. and Tzur, M., "Design of Flexible Assembly Line to Minimize Equipment Cost," IIE Transactions, Vol. 32, No. 7, pp. 585-598 (2000).
    • (2000) IIE Transactions , vol.32 , Issue.7 , pp. 585-598
    • Bukchin, J.1    Tzur, M.2
  • 4
    • 0022812077 scopus 로고
    • Work scheduling in FMS under tool availability constraints
    • Carrie, A. S. and Perera, D. T. S., "Work Scheduling in FMS Under Tool Availability Constraints," International Journal of Production Research, Vol. 24, No. 6, pp. 1299-1308 (1986).
    • (1986) International Journal of Production Research , vol.24 , Issue.6 , pp. 1299-1308
    • Carrie, A.S.1    Perera, D.T.S.2
  • 5
    • 0033904532 scopus 로고    scopus 로고
    • Cell formation with alternative process plans and machine capacity constraints: A new combined approach
    • Caux, C., Bruniaux, R., and Pierreval, H., "Cell Formation with Alternative Process Plans and Machine Capacity Constraints: A New Combined Approach," International Journal of Production Economics, Vol. 64, Nos. 1-3, pp. 279-284 (2000).
    • (2000) International Journal of Production Economics , vol.64 , Issue.1-3 , pp. 279-284
    • Caux, C.1    Bruniaux, R.2    Pierreval, H.3
  • 6
    • 0033115993 scopus 로고    scopus 로고
    • Evaluations of operational control rules in scheduling a flexible manufacturing system
    • Chan, F. T. S., "Evaluations of Operational Control Rules in Scheduling a Flexible Manufacturing System," Robotics and Computer-Integrated Manufacturing, Vol. 15, No. 2, pp. 121-132 (1999).
    • (1999) Robotics and Computer-integrated Manufacturing , vol.15 , Issue.2 , pp. 121-132
    • Chan, F.T.S.1
  • 7
    • 0037274883 scopus 로고    scopus 로고
    • Effects of dispatching and routing decisions on the performance of a flexible manufacturing system
    • Chan, F. T. S., "Effects of Dispatching and Routing Decisions on the Performance of a Flexible Manufacturing System," International Journal of Advanced Manufacturing Technology, Vol. 21, No. 5, pp. 328-338 (2003).
    • (2003) International Journal of Advanced Manufacturing Technology , vol.21 , Issue.5 , pp. 328-338
    • Chan, F.T.S.1
  • 8
    • 0036069575 scopus 로고    scopus 로고
    • The state of the art in simulation study on FMS scheduling: A comprehensive survey
    • Chan, F. T. S., Chan, H. K., and Lau, H. C. W., "The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey," International Journal of Advanced Manufacturing Technology, Vol. 19, No. 11, pp. 830-849 (2002).
    • (2002) International Journal of Advanced Manufacturing Technology , vol.19 , Issue.11 , pp. 830-849
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3
  • 9
    • 0031245602 scopus 로고    scopus 로고
    • A genetic-based vision system for cross functional integration in flexible manufacturing: A tutorial and application
    • Chen, J.-M., "A Genetic-Based Vision System for Cross Functional Integration in Flexible Manufacturing: A Tutorial and Application," International Journal of Flexible Manufacturing Systems, Vol. 9, No. 4, pp. 343-365 (1997).
    • (1997) International Journal of Flexible Manufacturing Systems , vol.9 , Issue.4 , pp. 343-365
    • Chen, J.-M.1
  • 10
    • 0003195198 scopus 로고
    • Concurrent design of manufacturing cell and control functions: A neural network approach
    • Chen, F. F. and Sagi, S. R., "Concurrent Design of Manufacturing Cell and Control Functions: A Neural Network Approach," International Journal of Advanced Manufacturing Technology, Vol. 10, pp. 118-130 (1995).
    • (1995) International Journal of Advanced Manufacturing Technology , vol.10 , pp. 118-130
    • Chen, F.F.1    Sagi, S.R.2
  • 11
    • 0029404744 scopus 로고
    • A learning-based methodology for dynamic scheduling in distributed manufacturing systems
    • Chiu, C. and Yih, Y., "A Learning-Based Methodology for Dynamic Scheduling in Distributed Manufacturing Systems," International Journal of Production Research, Vol. 33, No. 11, pp. 3217-3232 (1995).
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3217-3232
    • Chiu, C.1    Yih, Y.2
  • 12
    • 0031673320 scopus 로고    scopus 로고
    • Petri Net models for message manipulation and event monitoring in an FMS cell
    • Cho, H., "Petri Net Models for Message Manipulation and Event Monitoring in an FMS Cell," International Journal of Production Research, Vol. 36, No. 1, pp. 231-250 (1998).
    • (1998) International Journal of Production Research , vol.36 , Issue.1 , pp. 231-250
    • Cho, H.1
  • 14
    • 0024048527 scopus 로고
    • A framework for the design of cellular manufacturing systems
    • Choobineh, F., "A Framework for the Design of Cellular Manufacturing Systems," International Journal of Production Research, Vol. 26, No. 7, pp. 1161-1172 (1988).
    • (1988) International Journal of Production Research , vol.26 , Issue.7 , pp. 1161-1172
    • Choobineh, F.1
  • 16
    • 0031246898 scopus 로고    scopus 로고
    • Using an unsupervised neural network and decision tree as knowledge acquisition tools for FMS scheduling
    • Der-Chiang, L., Chihsen, W., and Kuan-Yeh, T., "Using an Unsupervised Neural Network and Decision Tree as Knowledge Acquisition Tools for FMS Scheduling," International Journal of Systems Science, Vol. 28, No. 10, pp. 977-985 (1997).
    • (1997) International Journal of Systems Science , vol.28 , Issue.10 , pp. 977-985
    • Der-Chiang, L.1    Chihsen, W.2    Kuan-Yeh, T.3
  • 17
    • 0035546139 scopus 로고    scopus 로고
    • Manufacturing cells design with flexible routing capability in presence of unreliable machines
    • Diallo, M., Pierreval, H., and Quilliot, A., "Manufacturing Cells Design with Flexible Routing Capability in Presence of Unreliable Machines," International Journal of Production Economics, Vol. 74, Nos. 1-3, pp. 175-182 (2001).
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 175-182
    • Diallo, M.1    Pierreval, H.2    Quilliot, A.3
  • 18
  • 20
    • 0025462618 scopus 로고
    • Production data based similarity coefficient for machine-component grouping decisions in the design of a cellular manufacturing system
    • Gupta, T. and Seifoddini, H., "Production Data Based Similarity Coefficient for Machine-Component Grouping Decisions in the Design of a Cellular Manufacturing System," International Journal of Production Research, Vol. 28, No. 7, pp. 1247-1269 (1990).
    • (1990) International Journal of Production Research , vol.28 , Issue.7 , pp. 1247-1269
    • Gupta, T.1    Seifoddini, H.2
  • 21
    • 0027608088 scopus 로고
    • Design of manufacturing cells for flexible environment considering alternative routeing
    • Gupta, T., "Design of Manufacturing Cells for Flexible Environment Considering Alternative Routeing," International Journal of Production Research, Vol. 31, No. 6, pp. 1259-1273 (1993).
    • (1993) International Journal of Production Research , vol.31 , Issue.6 , pp. 1259-1273
    • Gupta, T.1
  • 24
    • 0028401319 scopus 로고
    • Flexible process plans: Their value in flexible automation systems
    • Hutchinson, G. K. and Pflughoeft, K. A., "Flexible Process Plans: Their Value in Flexible Automation Systems," International Journal of Production Research, Vol. 32, No. 3, pp. 707-719 (1994).
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 707-719
    • Hutchinson, G.K.1    Pflughoeft, K.A.2
  • 25
    • 0024715676 scopus 로고
    • Modelling and solving an FMS part selection problem
    • Hwang, S. S. and Shogan, A. W., "Modelling and Solving an FMS Part Selection Problem "International Journal of Production Research, Vol. 27, No. 8, pp. 1349-1366 (1989).
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1349-1366
    • Hwang, S.S.1    Shogan, A.W.2
  • 26
    • 0031628095 scopus 로고    scopus 로고
    • A cellular manufacturing system based on new similarity coefficient which considers alternative routes during machine failure
    • Jeon, G., Leep, H. R., and Parsaei, H. R., "A Cellular Manufacturing System based on New Similarity Coefficient which Considers Alternative Routes during Machine Failure," Computers and Industrial Engineering, Vol. 34, No. 1, pp. 21-36 (1998).
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.1 , pp. 21-36
    • Jeon, G.1    Leep, H.R.2    Parsaei, H.R.3
  • 28
    • 0027073047 scopus 로고
    • A CAPP system for nonlinear process plans
    • Kruth, J. P. and Detand, J., "A CAPP System for Nonlinear Process Plans," Annals of the CIRP, Vol. 41, No. 1 pp. 489-492 (1992).
    • (1992) Annals of the CIRP , vol.41 , Issue.1 , pp. 489-492
    • Kruth, J.P.1    Detand, J.2
  • 30
    • 0026955031 scopus 로고
    • Similarity coefficient algorithms for solving the group technology problem
    • Kusiak, A. and Cho, M., "Similarity Coefficient Algorithms for Solving the Group Technology Problem," International Journal of Production Research, Vol. 30, No. 11, pp. 2633-2646 (1992).
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2633-2646
    • Kusiak, A.1    Cho, M.2
  • 31
    • 0027187518 scopus 로고
    • Concurrent part assignment and tool allocation in FMS with material handling considerations
    • Leung, L. C., Maheshwari, S. K., and Miller, W. A., "Concurrent Part Assignment and Tool Allocation in FMS with Material Handling Considerations," International Journal of Production Research, Vol. 31, No. 1, pp. 117-138 (1993).
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 117-138
    • Leung, L.C.1    Maheshwari, S.K.2    Miller, W.A.3
  • 32
    • 0035371898 scopus 로고    scopus 로고
    • Scheduling of the optimal tool replacement times in a flexible manufacturing system
    • Liu, P. H., Makis, V., and Jardine, A. K. S., "Scheduling of the Optimal Tool Replacement Times in a Flexible Manufacturing System," IIE Transactions, Vol. 33, No. 6, pp. 487-495 (2001).
    • (2001) IIE Transactions , vol.33 , Issue.6 , pp. 487-495
    • Liu, P.H.1    Makis, V.2    Jardine, A.K.S.3
  • 33
    • 0027641963 scopus 로고
    • A cellular similarity coefficient algorithm for the design of manufacturing cells
    • Luong, L. H. S., "A Cellular Similarity Coefficient Algorithm for the Design of Manufacturing Cells," International Journal of Production Research, Vol. 31, No. 8, pp. 1757-1766 (1992).
    • (1992) International Journal of Production Research , vol.31 , Issue.8 , pp. 1757-1766
    • Luong, L.H.S.1
  • 35
    • 0033320202 scopus 로고    scopus 로고
    • The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
    • Mahmoodi, F., Mosier, C. T., and Morgan, J. R., "The Effects of Scheduling Rules and Routing Flexibility on the Performance of a Random Flexible Manufacturing System," International Journal of Flexible Manufacturing Systems, Vol. 11, No. 3, pp. 271-289 (1999).
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , Issue.3 , pp. 271-289
    • Mahmoodi, F.1    Mosier, C.T.2    Morgan, J.R.3
  • 36
    • 3543147321 scopus 로고    scopus 로고
    • The impact of machine flexibility on the performance of flexible manufacturing systems
    • Mohamed, Z. M., Youssef, M. A., and Huq, F., "The Impact of Machine Flexibility on the Performance of Flexible Manufacturing Systems," International Journal of Operations and Production Management, Vol. 21, Nos. 5/6, pp. 707-727 (2001).
    • (2001) International Journal of Operations and Production Management , vol.21 , Issue.5-6 , pp. 707-727
    • Mohamed, Z.M.1    Youssef, M.A.2    Huq, F.3
  • 37
    • 0031697851 scopus 로고    scopus 로고
    • The effect of process flexibility on productivity for gasses of similar job shops
    • Pflughoeft, K. A. and Hutchinson, G. K., "The Effect of Process Flexibility on Productivity for Gasses of Similar Job Shops," International Journal of Production Research, Vol. 36, No. 1, pp. 1-12 (1998).
    • (1998) International Journal of Production Research , vol.36 , Issue.1 , pp. 1-12
    • Pflughoeft, K.A.1    Hutchinson, G.K.2
  • 38
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling procedures
    • Rachamadugu, R. and Stecke, K. E., "Classification and Review of FMS Scheduling Procedures," Production Planning and Control, Vol. 5, No. 1, pp. 2-20 (1994).
    • (1994) Production Planning and Control , vol.5 , Issue.1 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 43
    • 0035254377 scopus 로고    scopus 로고
    • Cooperative dispatching-exploiting the flexibility of an FMS by means of incremental optimization
    • Seifert, R. W. and Morito, S., "Cooperative Dispatching-Exploiting the Flexibility of an FMS by Means of Incremental Optimization," European Journal of Operational Research, Vol. 129, No. 1, pp. 116-133 (2001).
    • (2001) European Journal of Operational Research , vol.129 , Issue.1 , pp. 116-133
    • Seifert, R.W.1    Morito, S.2
  • 45
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random FMS
    • Shanker, K. and Tzen, Y. J., "A Loading and Dispatching Problem in a Random FMS, "International Journal of Production Research, Vol. 23, No. 3, pp. 579-595 (1985).
    • (1985) International Journal of Production Research , vol.23 , Issue.3 , pp. 579-595
    • Shanker, K.1    Tzen, Y.J.2
  • 46
    • 0030399084 scopus 로고    scopus 로고
    • The state-of-the-art in intelligent real-time FMS control: A comprehensive survey
    • Shukla, C. S. and Chen, F. F., "The State-of-the-Art in Intelligent Real-time FMS Control: A Comprehensive Survey," Journal of Intelligent Manufacturing, Vol. 7, No. 6, pp. 441-455 (1996).
    • (1996) Journal of Intelligent Manufacturing , vol.7 , Issue.6 , pp. 441-455
    • Shukla, C.S.1    Chen, F.F.2
  • 47
    • 0030270156 scopus 로고    scopus 로고
    • On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems
    • Smith, T. M. and Stecke, K. E., "On the Robustness of Using Balanced Part Mix Ratios to Determine Cyclic Part Input Sequences into Flexible Flow Systems," International Journal of Production Research, Vol. 34, No. 10, pp. 2925-2941 (1996).
    • (1996) International Journal of Production Research , vol.34 , Issue.10 , pp. 2925-2941
    • Smith, T.M.1    Stecke, K.E.2
  • 48
    • 0025701543 scopus 로고
    • A concept for planning and scheduling in an FMS
    • Solot, P., "A Concept for Planning and Scheduling in an FMS," European Journal of Operational Research, Vol. 45, No. 1, pp. 85-95 (1990).
    • (1990) European Journal of Operational Research , vol.45 , Issue.1 , pp. 85-95
    • Solot, P.1
  • 49
    • 0027542572 scopus 로고
    • The design of flexible manufacturing systems
    • Spano, M. R., O'Grady, P., and Young, R. E., "The Design of Flexible Manufacturing Systems," Computers in Industry, Vol. 21, pp. 185-198 (1993).
    • (1993) Computers in Industry , vol.21 , pp. 185-198
    • Spano, M.R.1    O'Grady, P.2    Young, R.E.3
  • 50
    • 34250111322 scopus 로고
    • Design, planning, scheduling, and control problems of flexible manufacturing systems
    • Stecke, K. E., "Design, Planning, Scheduling, and Control Problems of Flexible Manufacturing Systems," Annals of Operations Research, Vol. 3, pp. 3-12 (1985).
    • (1985) Annals of Operations Research , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 51
    • 84952242943 scopus 로고
    • Loading and control policies for a flexible manufacturing system
    • Stecke, K. E. and Solberg, J. J., "Loading and Control Policies for a Flexible Manufacturing System," International Journal of Production Research, Vol. 19, No. 5, pp. 481-490 (1981).
    • (1981) International Journal of Production Research , vol.19 , Issue.5 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.J.2
  • 53
    • 0008774739 scopus 로고
    • A process description concept for process planning, scheduling and job shop control
    • Toenshoff, H. K., Beckendorf, U., Anders, N., and Detand, J., "A Process Description Concept for Process Planning, Scheduling and Job Shop Control," Manufacturing Systems, Vol. 20, No. 1, pp. 53-60 (1991).
    • (1991) Manufacturing Systems , vol.20 , Issue.1 , pp. 53-60
    • Toenshoff, H.K.1    Beckendorf, U.2    Anders, N.3    Detand, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.