메뉴 건너뛰기




Volumn 15, Issue 1, 2004, Pages 87-102

A comprehensive survey and future trend of simulation study on FMS scheduling

Author keywords

Artificial intelligence (AI); Flexible manufacturing systems; Multi criteria; Scheduling; Simulation

Indexed keywords

ARTIFICIAL INTELLIGENCE; COMPUTER SIMULATION; CONTROL SYSTEMS; INDUSTRIAL RESEARCH; MANUFACTURE; PRODUCT DEVELOPMENT; SCHEDULING; SURVEYS;

EID: 1042300749     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/B:JIMS.0000010077.27141.be     Document Type: Review
Times cited : (116)

References (125)
  • 1
    • 0022604509 scopus 로고
    • Solution of scheduling problems of job shop type FMS with alternative machine tools
    • Abdin, M. F. (1986) Solution of scheduling problems of job shop type FMS with alternative machine tools. Computers and Industrial Engineering, 11, 241-245.
    • (1986) Computers and Industrial Engineering , vol.11 , pp. 241-245
    • Abdin, M.F.1
  • 2
    • 0028407980 scopus 로고
    • An integrated decision support system for FMS: Using intelligent simulation
    • Baid, N. K. and Nagarur, N. N. (1994) An integrated decision support system for FMS: Using intelligent simulation. International Journal of Production Research, 32(4), 951-965.
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 951-965
    • Baid, N.K.1    Nagarur, N.N.2
  • 8
    • 0022757590 scopus 로고
    • Flexible manufacturing systems: A review of analytical models
    • Buzacott, J. A. and Yao, D. D. (1986) Flexible manufacturing systems: A review of analytical models. Management Science, 32, 890-905.
    • (1986) Management Science , vol.32 , pp. 890-905
    • Buzacott, J.A.1    Yao, D.D.2
  • 9
    • 0024140244 scopus 로고
    • Integrating flexible manufacturing systems with traditional manufacturing, planning, and control
    • Byrkett, D. L., Ozden, M. H. and Patton, J. M. (1988) Integrating flexible manufacturing systems with traditional manufacturing, planning, and control. Journal of Production and Inventory Management, 29, 15-21.
    • (1988) Journal of Production and Inventory Management , vol.29 , pp. 15-21
    • Byrkett, D.L.1    Ozden, M.H.2    Patton, J.M.3
  • 12
    • 0032131027 scopus 로고    scopus 로고
    • Hybrid genetic algorithms for a multiple-objective scheduling problem
    • Cavalieri, S. and Gaiardelli, P. (1998) Hybrid genetic algorithms for a multiple-objective scheduling problem. Journal of Intelligent Manufacturing, 9, 361-367.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 361-367
    • Cavalieri, S.1    Gaiardelli, P.2
  • 13
    • 0034802653 scopus 로고    scopus 로고
    • Dynamic scheduling for a flexible manufacturing system - The pre-emptive approach
    • Chan, F. T. S. and Chan, H. K. (2001) Dynamic scheduling for a flexible manufacturing system - the pre-emptive approach. International Journal of Advanced Manufacturing Technology, 17(10), 760-768.
    • (2001) International Journal of Advanced Manufacturing Technology , vol.17 , Issue.10 , pp. 760-768
    • Chan, F.T.S.1    Chan, H.K.2
  • 14
    • 0035300673 scopus 로고    scopus 로고
    • The applications of flexible manufacturing technologies in business process reengineering
    • Chan, F. T. S. and Jiang, B. (2001) The applications of flexible manufacturing technologies in business process reengineering. International Journal of Flexible Manufacturing Systems, 13, 131-144.
    • (2001) International Journal of Flexible Manufacturing Systems , vol.13 , pp. 131-144
    • Chan, F.T.S.1    Jiang, B.2
  • 17
    • 0003371570 scopus 로고
    • A simulation model for planning and scheduling a complex warehousing operation
    • Thailand, November 1994
    • Chan, S. P. S. and Koh, P. H. (1994) A simulation model for planning and scheduling a complex warehousing operation. Proceedings of International Conference WORKSIMS '94, Thailand, November 1994, pp. 267-272.
    • (1994) Proceedings of International Conference WORKSIMS '94 , pp. 267-272
    • Chan, S.P.S.1    Koh, P.H.2
  • 19
    • 0000098624 scopus 로고
    • Experimental investigation of real-time scheduling in flexible manufacturing systems
    • Chang, Y. L., Sullivan, R. S., Bagchi, U. and Wilson, J. R. (1985) Experimental investigation of real-time scheduling in flexible manufacturing systems. Annals of Operations Research, 3, 355-377.
    • (1985) Annals of Operations Research , vol.3 , pp. 355-377
    • Chang, Y.L.1    Sullivan, R.S.2    Bagchi, U.3    Wilson, J.R.4
  • 20
    • 0033221999 scopus 로고    scopus 로고
    • Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system
    • Chen, F. F., Huang, J. and Centeno, M. A. (1999) Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system. Journal of Intelligent Manufacturing, 10, 405-421.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 405-421
    • Chen, F.F.1    Huang, J.2    Centeno, M.A.3
  • 21
    • 0023824587 scopus 로고
    • Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator
    • Choi, R. H. and Malstrom, E. M. (1988) Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator. Journal of Manufacturing Systems, 7(1), 33-45.
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.1 , pp. 33-45
    • Choi, R.H.1    Malstrom, E.M.2
  • 23
    • 0035360038 scopus 로고    scopus 로고
    • Dynamic scheduling of manufacturing job shops using genetic algorithms
    • Chryssolouris, G. and Subramaniam, V. (2001) Dynamic scheduling of manufacturing job shops using genetic algorithms. Journal of Intelligent Manufacturing, 12, 281-293.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 281-293
    • Chryssolouris, G.1    Subramaniam, V.2
  • 24
    • 0023868981 scopus 로고
    • Sequencing in flexible manufacturing system and other short queue-length systems
    • Co, H. C., Jaw, T. J. and Chen, S. K. (1988) Sequencing in flexible manufacturing system and other short queue-length systems. Journal of Manufacturing Systems, 7(1), 1-9.
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.1 , pp. 1-9
    • Co, H.C.1    Jaw, T.J.2    Chen, S.K.3
  • 26
    • 0023385665 scopus 로고
    • Experimental investigation of flexible manufacturing system scheduling rules
    • Denzler, D. R. and Boe, W. J. (1987) Experimental investigation of flexible manufacturing system scheduling rules. International Journal of Production Research, 25(7), 979-994.
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 979-994
    • Denzler, D.R.1    Boe, W.J.2
  • 27
    • 0020388158 scopus 로고
    • Simulation and graphical animation of advanced manufacturing systems
    • ElMaraghy, H. A. (1981) Simulation and graphical animation of advanced manufacturing systems. Journal of Manufacturing Systems, 1, 53-63.
    • (1981) Journal of Manufacturing Systems , vol.1 , pp. 53-63
    • ElMaraghy, H.A.1
  • 29
    • 0030676526 scopus 로고    scopus 로고
    • A rolling horizon job ship rescheduling strategy in the dynamic environment
    • Fang, J. and Xi, Y. (1997) A rolling horizon job ship rescheduling strategy in the dynamic environment. International Journal of Advanced Manufacturing Technology, 13, 227-232.
    • (1997) International Journal of Advanced Manufacturing Technology , vol.13 , pp. 227-232
    • Fang, J.1    Xi, Y.2
  • 30
    • 0030130032 scopus 로고    scopus 로고
    • An evaluation of group scheduling heuristic in a flow-line manufacturing cell
    • Frazier, G. V. (1996) An evaluation of group scheduling heuristic in a flow-line manufacturing cell. International Journal of Production Research, 34(4), 959-976.
    • (1996) International Journal of Production Research , vol.34 , Issue.4 , pp. 959-976
    • Frazier, G.V.1
  • 32
    • 0001695607 scopus 로고
    • Single machine scheduling to minimize mean absolute lateness: A heuristic solution
    • Fry, T. D., Armstrong, R. D. and Rosen, L. D. (1990) Single machine scheduling to minimize mean absolute lateness: A heuristic solution. Computers and Operations Research, 17(1), 105-112.
    • (1990) Computers and Operations Research , vol.17 , Issue.1 , pp. 105-112
    • Fry, T.D.1    Armstrong, R.D.2    Rosen, L.D.3
  • 33
    • 0032093108 scopus 로고    scopus 로고
    • A decision support system for material and manufacturing process selection
    • Giachetti, R. E. (1998) A decision support system for material and manufacturing process selection. Journal of Intelligent Manufacturing, 9, 265-276.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 265-276
    • Giachetti, R.E.1
  • 36
    • 0031997813 scopus 로고    scopus 로고
    • Fuzzy set theory applications in production management research: A literature survey
    • Guiffrida, A. L. and Nagi, R. (1998) Fuzzy set theory applications in production management research: A literature survey. Journal of Intelligent Manufacturing, 9, 39-56.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 39-56
    • Guiffrida, A.L.1    Nagi, R.2
  • 39
    • 0028466353 scopus 로고
    • A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix
    • Gyampah, K. A. (1994) A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix. International Journal of Flexible Manufacturing Systems, 6, 179-207.
    • (1994) International Journal of Flexible Manufacturing Systems , vol.6 , pp. 179-207
    • Gyampah, K.A.1
  • 41
    • 0031076549 scopus 로고    scopus 로고
    • Improving job shop performance by coordinating dispatching rules
    • Holthhaus, O. and Ziegler, H. (1997) Improving job shop performance by coordinating dispatching rules. International Journal of Production Research, 35(3), 335-351.
    • (1997) International Journal of Production Research , vol.35 , Issue.3 , pp. 335-351
    • Holthhaus, O.1    Ziegler, H.2
  • 43
    • 0035417661 scopus 로고    scopus 로고
    • Automated knowledge acquisition for design and manufacturing: The case of micromachined atomizer
    • Huang, S. H., Hao, X., Benjamin, M. (2001) Automated knowledge acquisition for design and manufacturing: The case of micromachined atomizer. Journal of Intelligent Manufacturing, 12, 377-391
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 377-391
    • Huang, S.H.1    Hao, X.2    Benjamin, M.3
  • 44
    • 38249019026 scopus 로고
    • Scheduling random flexible manufacturing systems with dynamic environments
    • Hutchison, J. and Khumavala, B. (1990) Scheduling random flexible manufacturing systems with dynamic environments. Journal of Operations Management, 9(3), 335-351.
    • (1990) Journal of Operations Management , vol.9 , Issue.3 , pp. 335-351
    • Hutchison, J.1    Khumavala, B.2
  • 46
  • 50
    • 0034286617 scopus 로고    scopus 로고
    • A comparative analysis of two different approaches to scheduling in flexible flow shops
    • Jayamohan, M. S. and Rajendran C. (2000) A comparative analysis of two different approaches to scheduling in flexible flow shops. Production Planning and Control, 11(6), 572-580.
    • (2000) Production Planning and Control , vol.11 , Issue.6 , pp. 572-580
    • Jayamohan, M.S.1    Rajendran, C.2
  • 52
    • 0027625055 scopus 로고
    • An evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling
    • Kannan, V. R. and Ghosh, S. (1993) An evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling. International Journal of Production Research, 31(7), 1637-1654.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1637-1654
    • Kannan, V.R.1    Ghosh, S.2
  • 58
    • 0031365101 scopus 로고    scopus 로고
    • Real-time operation selection in an FMS using simulation -A fuzzy approach
    • Kazerooni, A., Chan, F. T. S. and Abhary, K. (1997b) Real-time operation selection in an FMS using simulation -A fuzzy approach. Production Planning and Control, 8(8), 771-779.
    • (1997) Production Planning and Control , vol.8 , Issue.8 , pp. 771-779
    • Kazerooni, A.1    Chan, F.T.S.2    Abhary, K.3
  • 59
    • 0032163501 scopus 로고    scopus 로고
    • Integration of inductive learning and neural networks for multi-objective FMS scheduling
    • Kim, C. O., Min, H. S. and Yih, Y. (1998) Integration of inductive learning and neural networks for multi-objective FMS scheduling. International Journal of Production Research, 36, 2497-2509.
    • (1998) International Journal of Production Research , vol.36 , pp. 2497-2509
    • Kim, C.O.1    Min, H.S.2    Yih, Y.3
  • 60
    • 0028462998 scopus 로고
    • Impact of sequence-dependent setup time on job shop scheduling performance
    • Kim, S. C. and Bobrowski, P. M. (1994) Impact of sequence-dependent setup time on job shop scheduling performance. International Journal of Production Research, 32(7), 1503-1520.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 61
    • 0025430088 scopus 로고
    • A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings
    • Kim, Y. D. (1990) A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings. International Journal of Production Research, 28(5), 953-962.
    • (1990) International Journal of Production Research , vol.28 , Issue.5 , pp. 953-962
    • Kim, Y.D.1
  • 64
    • 0032644993 scopus 로고    scopus 로고
    • Structured intelligence for self-organizing manufacturing systems
    • Kubota, N. and Fukuda, T. (1999) Structured intelligence for self-organizing manufacturing systems. Journal of Intelligent Manufacturing, 10, 121-133.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 121-133
    • Kubota, N.1    Fukuda, T.2
  • 65
    • 0022160824 scopus 로고
    • Flexible manufacturing systems: A structural approach
    • Kusiak, A. (1985) Flexible manufacturing systems: A structural approach. International Journal of Production Research, 23, 1057-1073.
    • (1985) International Journal of Production Research , vol.23 , pp. 1057-1073
    • Kusiak, A.1
  • 67
    • 0023416625 scopus 로고
    • A new formulation of operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience
    • Lashkari, R. S., Dutta, S. P. and Padhye, A. M. (1987) A new formulation of operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience. International Journal of Production Research, 25(9), 1267-1283.
    • (1987) International Journal of Production Research , vol.25 , Issue.9 , pp. 1267-1283
    • Lashkari, R.S.1    Dutta, S.P.2    Padhye, A.M.3
  • 68
    • 0024771924 scopus 로고
    • A multi-objective production planning model in a flexible manufacturing environment
    • Lee, S. M. and Jung, H. J. (1989) A multi-objective production planning model in a flexible manufacturing environment. International Journal of Production Research, 27(11), 1981-1992.
    • (1989) International Journal of Production Research , vol.27 , Issue.11 , pp. 1981-1992
    • Lee, S.M.1    Jung, H.J.2
  • 70
    • 0027675515 scopus 로고
    • A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility
    • Linn, R. J. and Xie, X. (1993) A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility. International Journal of Production Research, 31(10), 2355-2367.
    • (1993) International Journal of Production Research , vol.31 , Issue.10 , pp. 2355-2367
    • Linn, R.J.1    Xie, X.2
  • 71
    • 0035482726 scopus 로고    scopus 로고
    • A hybrid approach for integer programming combining genetic algorithms, linear programming and ordinal optimization
    • Luo, Y. C., Guignard, M. and Chen, C. H. (2001) A hybrid approach for integer programming combining genetic algorithms, linear programming and ordinal optimization. Journal of Intelligent Manufacturing, 12, 509-519.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 509-519
    • Luo, Y.C.1    Guignard, M.2    Chen, C.H.3
  • 72
    • 0027541129 scopus 로고
    • A new classification scheme for flexible manufacturing systems
    • Maccarthy, B. L. and Liu, J. (1993) A new classification scheme for flexible manufacturing systems. International Journal of Production Research, 31(2), 299-309.
    • (1993) International Journal of Production Research , vol.31 , Issue.2 , pp. 299-309
    • Maccarthy, B.L.1    Liu, J.2
  • 73
    • 84946307098 scopus 로고
    • Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling systems in FMS
    • Maheshwari, S. K. and Khator, S. K. (1995) Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling systems in FMS. International Journal of Computer Integrated Manufacturing, 8(5), 340-356.
    • (1995) International Journal of Computer Integrated Manufacturing , vol.8 , Issue.5 , pp. 340-356
    • Maheshwari, S.K.1    Khator, S.K.2
  • 75
    • 0033320202 scopus 로고    scopus 로고
    • The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
    • Mahmoodi, F., Mosier, C. T. and Morgan, J. R. (1999) The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system. International Journal of Flexible Manufacturing Systems, 11, 271-289.
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 271-289
    • Mahmoodi, F.1    Mosier, C.T.2    Morgan, J.R.3
  • 77
    • 0032121915 scopus 로고    scopus 로고
    • A competitive neural network approach to multi-objective FMS scheduling
    • Min, H. S., Yih, Y. and Kim, C. O. (1998) A competitive neural network approach to multi-objective FMS scheduling. International Journal of Production Research, 36(7), 1749-1765.
    • (1998) International Journal of Production Research , vol.36 , Issue.7 , pp. 1749-1765
    • Min, H.S.1    Yih, Y.2    Kim, C.O.3
  • 78
    • 0034694482 scopus 로고    scopus 로고
    • An intelligent hybrid system for initial process parameter setting of injection moulding
    • Mok, S. L., Kwong, C. K. and Lau, W. S. (2000) An intelligent hybrid system for initial process parameter setting of injection moulding. International Journal of Production Research, 38(17), 4565-4576.
    • (2000) International Journal of Production Research , vol.38 , Issue.17 , pp. 4565-4576
    • Mok, S.L.1    Kwong, C.K.2    Lau, W.S.3
  • 80
    • 0026819312 scopus 로고
    • Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool
    • Nakasuka, S. and Yoshida, T. (1992) Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool. International Journal of Production Research, 30(2), 411-431.
    • (1992) International Journal of Production Research , vol.30 , Issue.2 , pp. 411-431
    • Nakasuka, S.1    Yoshida, T.2
  • 81
    • 0034292136 scopus 로고    scopus 로고
    • A knowledge-based system for reactive scheduling decision-making in FMS
    • O'Kane, J. F. (2000) A knowledge-based system for reactive scheduling decision-making in FMS. Journal of Intelligent Manufacturing, 11, 461-474.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 461-474
    • O'Kane, J.F.1
  • 82
    • 0026907894 scopus 로고
    • Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system
    • O'Keefe, R. M. and Kasirajan, T. (1992) Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research, 30(8), 1753-1772.
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1753-1772
    • O'Keefe, R.M.1    Kasirajan, T.2
  • 83
    • 0001377662 scopus 로고
    • Part input into a flexible input flow system: An evaluation of look-ahead simulation and a fuzzy rule base
    • O'Keefe, R. M. and Rao, R. (1992) Part input into a flexible input flow system: an evaluation of look-ahead simulation and a fuzzy rule base. International Journal of Flexible Manufacturing Systems, 4, 113-127.
    • (1992) International Journal of Flexible Manufacturing Systems , vol.4 , pp. 113-127
    • O'Keefe, R.M.1    Rao, R.2
  • 84
    • 0015727327 scopus 로고
    • Evaluation of the shortest processing time scheduling rule with transaction process
    • Oral, M. and Malouin, J. L. (1973) Evaluation of the shortest processing time scheduling rule with transaction process. AIIE Transactions, 5(4), 357-365.
    • (1973) AIIE Transactions , vol.5 , Issue.4 , pp. 357-365
    • Oral, M.1    Malouin, J.L.2
  • 86
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling procedures
    • Rachamadugu, R. and Stecke, K. E. (1994) Classification and review of FMS scheduling procedures. Production Planning and Control, 5(1), 2-20.
    • (1994) Production Planning and Control , vol.5 , Issue.1 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 89
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasesh, R. (1990) Dynamic job shop scheduling: A survey of simulation research. Omega International Journal of Management Science, 18(1), 43-57.
    • (1990) Omega International Journal of Management Science , vol.18 , Issue.1 , pp. 43-57
    • Ramasesh, R.1
  • 90
    • 0032598803 scopus 로고    scopus 로고
    • Artificial intelligence and expert systems applications in new product development - A survey
    • Rao, S. S., Nahm, A., Shi, Z., Deng, X. and Syamil, A. (1999) Artificial intelligence and expert systems applications in new product development - a survey. Journal of Intelligent Manufacturing, 10, 231-244.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 231-244
    • Rao, S.S.1    Nahm, A.2    Shi, Z.3    Deng, X.4    Syamil, A.5
  • 91
    • 0025262878 scopus 로고
    • Multi-criteria operational control rules in flexible manufacturing systems (FMSs)
    • Ro, I. K. and Kim, J. I. (1990) Multi-criteria operational control rules in flexible manufacturing systems (FMSs). International Journal of Production Research, 28(1), 47-63.
    • (1990) International Journal of Production Research , vol.28 , Issue.1 , pp. 47-63
    • Ro, I.K.1    Kim, J.I.2
  • 92
    • 0026692325 scopus 로고
    • Scheduling rule selection for the forbiden early shipment environment: A comparison of economic objectives
    • Rohleder, T. R. and Scudder, G. D. (1992) Scheduling rule selection for the forbiden early shipment environment: a comparison of economic objectives. International Journal of Production Research, 30(1), 129-140.
    • (1992) International Journal of Production Research , vol.30 , Issue.1 , pp. 129-140
    • Rohleder, T.R.1    Scudder, G.D.2
  • 93
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • Sabuncuoglu, I. and Hommertzheim, D. L. (1992a) Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 30, 1057-1079.
    • (1992) International Journal of Production Research , vol.30 , pp. 1057-1079
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 94
    • 0026898533 scopus 로고
    • Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
    • Sabuncuoglu, I. and Hommertzheim, D. L. (1992b) Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research, 30(7), 1617-1635.
    • (1992) International Journal of Production Research , vol.30 , Issue.7 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 95
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • Sabuncuoglu, I. (1998) A study of scheduling rules of flexible manufacturing systems: a simulation approach. International Journal of Production Research, 36(2), 527-546.
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 96
    • 0023384747 scopus 로고
    • The machine loading and toll allocation problem in a flexible manufacturing system
    • Sarin, S. C. and Chen, C. S. (1987) The machine loading and toll allocation problem in a flexible manufacturing system. International Journal of Production Research, 25, 1081-1094.
    • (1987) International Journal of Production Research , vol.25 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 97
    • 0000389987 scopus 로고
    • Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness
    • Sarper, H. (1994) Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness. Production Planning and Control, 5(2), 185-192.
    • (1994) Production Planning and Control , vol.5 , Issue.2 , pp. 185-192
    • Sarper, H.1
  • 98
    • 0005743984 scopus 로고
    • Simulation through simulation
    • Schnur, J. A. (1987) Simulation through simulation. CIM Review, 3(2), 3-5.
    • (1987) CIM Review , vol.3 , Issue.2 , pp. 3-5
    • Schnur, J.A.1
  • 99
    • 0347666640 scopus 로고
    • Machine utilizations and production rates achieved by using balanced aggregate FMS production ratios in a simulated setting
    • Elsevier, Amsterdam
    • Schriber, T. J. and Stecke, K. E. (1986) Machine utilizations and production rates achieved by using balanced aggregate FMS production ratios in a simulated setting. Proceedings of the Second ORSA/TIMS Conference on FMS, Elsevier, Amsterdam.
    • (1986) Proceedings of the Second ORSA/TIMS Conference on FMS
    • Schriber, T.J.1    Stecke, K.E.2
  • 101
    • 0022161686 scopus 로고
    • Composite cost-based rules for priority scheduling in a randomly routed job shop
    • Scudder, D. G. and Hoffmann, T. R. (1985) Composite cost-based rules for priority scheduling in a randomly routed job shop. International Journal of Production Research, 23(6), 1185-1195.
    • (1985) International Journal of Production Research , vol.23 , Issue.6 , pp. 1185-1195
    • Scudder, D.G.1    Hoffmann, T.R.2
  • 103
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • Shanker, K. and Tzen, Y. J. (1985) A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23(3), 579-595.
    • (1985) International Journal of Production Research , vol.23 , Issue.3 , pp. 579-595
    • Shanker, K.1    Tzen, Y.J.2
  • 104
    • 0023997981 scopus 로고
    • Quasi on-line scheduling procedures for flexible manufacturing systems
    • Slomp, J. and Gaalman, G. J. C. (1988) Quasi on-line scheduling procedures for flexible manufacturing systems. International Journal of Production Research, 26, 585-598.
    • (1988) International Journal of Production Research , vol.26 , pp. 585-598
    • Slomp, J.1    Gaalman, G.J.C.2
  • 106
    • 0001357568 scopus 로고
    • Variation in flexible manufacturing systems according to the relevant types of automated materials handling
    • Stecke, K. E. and Browne, J. (1985) Variation in flexible manufacturing systems according to the relevant types of automated materials handling. Material Flow, 2, 179-185.
    • (1985) Material Flow , vol.2 , pp. 179-185
    • Stecke, K.E.1    Browne, J.2
  • 107
    • 84952242943 scopus 로고
    • Loading and control policies for flexible manufacturing systems
    • Stecke, K. E. and Solberg, J. (1981) Loading and control policies for flexible manufacturing systems. International Journal of Production Research, 19(5), 481-490.
    • (1981) International Journal of Production Research , vol.19 , Issue.5 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.2
  • 109
    • 0027609316 scopus 로고
    • A study on decision rules of scheduling model in an FMS
    • Tang, L. L., Yih, Y. and Liu, C. Y. (1993) A study on decision rules of scheduling model in an FMS. Computers in Industry, 22, 1-13.
    • (1993) Computers in Industry , vol.22 , pp. 1-13
    • Tang, L.L.1    Yih, Y.2    Liu, C.Y.3
  • 111
    • 0031118685 scopus 로고    scopus 로고
    • Evaluation of alternate routing policies in scheduling a job-shop type FMS
    • Tunali, S. (1997) Evaluation of alternate routing policies in scheduling a job-shop type FMS. Computers in Industrial Engineering, 32(2), 243-250.
    • (1997) Computers in Industrial Engineering , vol.32 , Issue.2 , pp. 243-250
    • Tunali, S.1
  • 112
    • 0033204393 scopus 로고    scopus 로고
    • Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems
    • Tung, L. F., Lin, L. and Rakesh, N. (1999) Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 11, 379-409.
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 379-409
    • Tung, L.F.1    Lin, L.2    Rakesh, N.3
  • 113
    • 0035836310 scopus 로고    scopus 로고
    • Application of AI to AGV control - Agent control of AGVs
    • Wallace, A. (2001) Application of AI to AGV control - agent control of AGVs. International Journal of Production Research, 39(8), 709-726.
    • (2001) International Journal of Production Research , vol.39 , Issue.8 , pp. 709-726
    • Wallace, A.1
  • 114
  • 116
    • 0030216417 scopus 로고    scopus 로고
    • Formation and dynamic routeing of part families among flexible manufacturing cells
    • Wen, H. J., Smith, C. H. and Minr, E. D. (1996) Formation and dynamic routeing of part families among flexible manufacturing cells. International Journal of Production Research, 34(8), 2229-2245.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2229-2245
    • Wen, H.J.1    Smith, C.H.2    Minr, E.D.3
  • 117
    • 0021898921 scopus 로고
    • Effectiveness of alternate operations in a flexible manufacturing system
    • Wilhelm, W. E. and Shin, H. M. (1985) Effectiveness of alternate operations in a flexible manufacturing system. International Journal of Production Research, 23(1), 65-79.
    • (1985) International Journal of Production Research , vol.23 , Issue.1 , pp. 65-79
    • Wilhelm, W.E.1    Shin, H.M.2
  • 118
    • 0023868237 scopus 로고
    • Multi-pass expert control system - A control/scheduling structure for flexible manufacturing cells
    • Wu, S. Y. D. and Wysk, R. A. (1988) Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells. Journal of Manufacturing Systems, 7(2), 107-120.
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.2 , pp. 107-120
    • Wu, S.Y.D.1    Wysk, R.A.2
  • 119
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, S. Y. D. and Wysk, R. A. (1989) An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27(9), 1603-1623.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.Y.D.1    Wysk, R.A.2
  • 120
    • 0028408210 scopus 로고
    • A comparison of job dispatching rules using a total cost criterion
    • Yang, K. K. and Sum, C. C. (1994) A comparison of job dispatching rules using a total cost criterion. International Journal of Production Research 32(4), 807-820.
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 807-820
    • Yang, K.K.1    Sum, C.C.2
  • 123
    • 0016458950 scopus 로고
    • The concepts of linguistic variable and its application to approximate reasoning
    • Zadeh, L. A. (1975) The concepts of linguistic variable and its application to approximate reasoning. Information Science, 8(1), 199-249.
    • (1975) Information Science , vol.8 , Issue.1 , pp. 199-249
    • Zadeh, L.A.1
  • 124
    • 0032093824 scopus 로고    scopus 로고
    • Integrated knowledge-based Petri net intelligent flexible assembly planning
    • Zha, X. F., Lim, S. Y. E. and Fok, S. C. (1998) Integrated knowledge-based Petri net intelligent flexible assembly planning. Journal of Intelligent Manufacturing, 9, 235-250.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 235-250
    • Zha, X.F.1    Lim, S.Y.E.2    Fok, S.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.