-
1
-
-
0029513501
-
-
" Can. J. Civ. Eng. CJCEB8 0315-1468, (6).
-
Abou-Zeid, A., Russell, J. S., Hanna, A. S., and Park, S. C. (1995). " Data flow model for communications between project participants in a highway bridge project.." Can. J. Civ. Eng. CJCEB8 0315-1468, 22 (6), 1224-1234.
-
(1995)
Data Flow Model for Communications between Project Participants in A Highway Bridge Project
, vol.22
, pp. 1224-1234
-
-
Abou-Zeid, A.1
Russell, J.S.2
Hanna, A.S.3
Park, S.C.4
-
2
-
-
38149094450
-
-
aexXML.. "." 〈 www.aexxml.org 〉 (Jan. 2003).
-
aexXML. (2003). " Use case template.." 〈 www.aexxml.org 〉 (Jan. 2003).
-
(2003)
Use Case Template
-
-
-
4
-
-
0001641644
-
-
" Constr. Manage. Econom. CMECF3 0144-6193 10.1080/014461999371655.
-
Baldwin, A. N., Austin, S. A., Hassan, T. M., and Thorpe, A. (1999). " Modeling information flow during the conceptual and schematic stages of building design.." Constr. Manage. Econom. CMECF3 0144-6193 10.1080/014461999371655, 17, 155-167.
-
(1999)
Modeling Information Flow during the Conceptual and Schematic Stages of Building Design
, vol.17
, pp. 155-167
-
-
Baldwin, A.N.1
Austin, S.A.2
Hassan, T.M.3
Thorpe, A.4
-
5
-
-
3242706628
-
-
" Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, (1).
-
Ballard, G., Harper, N., and Zabelle, T. (2003). " Learning to see work flow: An application of lean concepts to precast concrete fabrication.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 10 (1), 6-14.
-
(2003)
Learning to See Work Flow: An Application of Lean Concepts to Precast Concrete Fabrication
, vol.10
, pp. 6-14
-
-
Ballard, G.1
Harper, N.2
Zabelle, T.3
-
6
-
-
38149008318
-
-
The unified modeling language user's guide, 1st Ed., Addison-Wesley, Sydney.
-
Booch, G., Rumbaugh, J., and Jacobson, I. (1998). The unified modeling language user's guide, 1st Ed., Addison-Wesley, Sydney.
-
(1998)
-
-
Booch, G.1
Rumbaugh, J.2
Jacobson, I.3
-
8
-
-
4344714947
-
-
" Autom. Constr. AUCOES 0926-5805, (6).
-
Chen, P. H., Wan, C., Tiong, R. L. K., Ting, S. K., and Yang, Q. (2004). " Augmented IDEF 1-based process-oriented information modeling.." Autom. Constr. AUCOES 0926-5805, 13 (6), 735-750.
-
(2004)
Augmented IDEF 1-based Process-oriented Information Modeling
, vol.13
, pp. 735-750
-
-
Chen, P.H.1
Wan, C.2
Tiong, R.L.K.3
Ting, S.K.4
Yang, Q.5
-
9
-
-
0032073196
-
-
Autom. Constr. AUCOES 0926-5805 10.1016/S0926-5805(98)00050-8, (4).
-
de la Garza, J., and Howitt, I. (1998). " Wireless communication and computing at the construction jobsite.." Autom. Constr. AUCOES 0926-5805 10.1016/S0926-5805(98)00050-8, 7 (4), 327-347.
-
(1998)
Wireless Communication and Computing at the Construction Jobsite
, vol.7
, pp. 327-347
-
-
De La Garza, J.1
Howitt, I.2
-
10
-
-
38149054247
-
-
Building product models: Computer environments, supporting design and construction, CRC, Boca Raton, Fla.
-
Eastman, C. M. (1999). Building product models: Computer environments, supporting design and construction, CRC, Boca Raton, Fla.
-
(1999)
-
-
Eastman, C.M.1
-
11
-
-
38149112930
-
-
" Proc. of CIB W78, Int. Council for Research and Innovation in Building and Construction.
-
Eastman, C. M., Lee, G., and Sacks, R. (2002). " A new formal and analytical approach to modeling engineering project information processes.." Proc. of CIB W78, Int. Council for Research and Innovation in Building and Construction, 125-132.
-
(2002)
A New Formal and Analytical Approach to Modeling Engineering Project Information Processes
, pp. 125-132
-
-
Eastman, C.M.1
Lee, G.2
Sacks, R.3
-
12
-
-
38149031064
-
-
" 10th Annual Conf. of the Int. Groufor Lean Construction (IGLC-10), Gramado, Brazil.
-
Elfving, J., Tommelein, I. D., and Ballard, G. (2002). " Reducing lead time for electrical switchgear.." 10th Annual Conf. of the Int. Group for Lean Construction (IGLC-10), Gramado, Brazil, 237-249.
-
(2002)
Reducing Lead Time for Electrical Switchgear
, pp. 237-249
-
-
Elfving, J.1
Tommelein, I.D.2
Ballard, G.3
-
13
-
-
38149073438
-
-
" Proc. of the 11th Annual Conf. of the Int. Groufor Lean Construction (IGLC 11).
-
Elfving, J., Tommelein, I. D., and Ballard, G. (2003). " An Int. comparison of the delivery process of power distribution equipment.." Proc. of the 11th Annual Conf. of the Int. Group for Lean Construction (IGLC 11), 357-368.
-
(2003)
An Int. Comparison of the Delivery Process of Power Distribution Equipment
, pp. 357-368
-
-
Elfving, J.1
Tommelein, I.D.2
Ballard, G.3
-
15
-
-
38149086227
-
-
" EIA-9, E-Activities and Intelligent Support in Design and the Built Environment, 9th EuropIA Int. Conf., Istanbul, Turkey.
-
Ergen, E., Akinci, B., and Sacks, R. (2003). " Formalization and automation of effective tracking and locating of precast components in a storage yard.." EIA-9, E-Activities and Intelligent Support in Design and the Built Environment, 9th EuropIA Int. Conf., Istanbul, Turkey, 31-37.
-
(2003)
Formalization and Automation of Effective Tracking and Locating of Precast Components in A Storage Yard
, pp. 31-37
-
-
Ergen, E.1
Akinci, B.2
Sacks, R.3
-
16
-
-
38149039571
-
-
Fully Integrated and Automated Technology (FIATECH).. "." 〈 http://www.Fiatech.Org/Projects/Idim/Aex.Htm 〉 (May 2005).
-
Fully Integrated and Automated Technology (FIATECH). (2005). " Automating Equipment Information Exchange (AEX).." 〈 http://www.Fiatech.Org/Projects/Idim/Aex.Htm 〉 (May 2005).
-
(2005)
Automating Equipment Information Exchange (AEX)
-
-
-
17
-
-
38149026479
-
-
Galliers, R., ed.. Information analysis: Selected readings, Addison-Wesley, Sydney
-
Galliers, R., ed. (1987). Information analysis: Selected readings, Addison-Wesley, Sydney.
-
(1987)
-
-
-
19
-
-
18144426836
-
-
J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2005)19: 2(172), (2).
-
Halfawy, M., and Froese, T. (2005). " Building integrated architecture/engineering/construction systems using smart objects: Methodology and implementation.." J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(2005)19:2(172), 19 (2), 172-181.
-
(2005)
Building Integrated Architecture/engineering/construction Systems Using Smart Objects: Methodology and Implementation
, vol.19
, pp. 172-181
-
-
Halfawy, M.1
Froese, T.2
-
20
-
-
38149078987
-
-
Project management for construction, 〈 http://www.ce.cmu.edu/pmbook/ 〉 (September 2005).
-
Hendrickson, C. (2003). " Organization and use of project information.." Project management for construction, 〈 http://www.ce.cmu.edu/pmbook/ 〉 (September 2005).
-
(2003)
Organization and Use of Project Information
-
-
Hendrickson, C.1
-
21
-
-
2642540222
-
-
Autom. Constr. AUCOES 0926-5805 10.1016/j.autcon.2003.09.011, (4).
-
Hiremath, H., and Skibniewski, M. J. (2004). " Object-oriented modeling of construction processes by unified modeling language.." Autom. Constr. AUCOES 0926-5805 10.1016/j.autcon.2003.09.011, 13 (4), 447-468.
-
(2004)
Object-oriented Modeling of Construction Processes by Unified Modeling Language
, vol.13
, pp. 447-468
-
-
Hiremath, H.1
Skibniewski, M.J.2
-
22
-
-
38149056691
-
-
Int. Alliance for Interoperability (IAI).. 〈 http://www.iai- international.org 〉 (September 2005).
-
Int. Alliance for Interoperability (IAI). (2003). 〈 http://www.iai-international.org 〉 (September 2005).
-
(2003)
-
-
-
24
-
-
2942724236
-
-
" ITcon, 8 (Special issue: eWork and eBusiness).
-
Meissner, A., Mathes, I., Baxevanaki, L., Dore, G., and Branki, C. (2003). " The cosmos integrated IT solution at railway and motorway construction sites: Two case studies.." ITcon, 8 (Special issue: eWork and eBusiness), 283-291.
-
(2003)
The Cosmos Integrated IT Solution at Railway and Motorway Construction Sites: Two Case Studies
, pp. 283-291
-
-
Meissner, A.1
Mathes, I.2
Baxevanaki, L.3
Dore, G.4
Branki, C.5
-
26
-
-
4644233582
-
-
" Civ. Eng. Environ. Syst. ZZZZZZ 1028-6628, (2).
-
Oloufa, A. A., Yasser, A. H., Fayez, M., and Axelsson, P. (2004). " Using DSM for modeling information flow in construction design projects.." Civ. Eng. Environ. Syst. ZZZZZZ 1028-6628, 21 (2), 105-125.
-
(2004)
Using DSM for Modeling Information Flow in Construction Design Projects
, vol.21
, pp. 105-125
-
-
Oloufa, A.A.1
Yasser, A.H.2
Fayez, M.3
Axelsson, P.4
-
27
-
-
38149062927
-
-
" 3rd Int. Conf. on Concurrent Engineering, Berkeley, Calif.
-
Sacks, R., Eastman, C. M., and Lee, G. (2002). " Information and process flow in models of precast concrete design and construction.." 3rd Int. Conf. on Concurrent Engineering, Berkeley, Calif, 51-62.
-
(2002)
Information and Process Flow in Models of Precast Concrete Design and Construction
, pp. 51-62
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
28
-
-
20444489509
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2005)131:6(723), (6).
-
Song, J., Fagerlund, W. R., Haas, C. T., Tatum, C. B., and Vanegas, J. A. (2005). " Considering prework on industrial projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:6(723), 131 (6), 723-733.
-
(2005)
Considering Prework on Industrial Projects
, vol.131
, pp. 723-733
-
-
Song, J.1
Fagerlund, W.R.2
Haas, C.T.3
Tatum, C.B.4
Vanegas, J.A.5
-
31
-
-
38149009827
-
-
Proc. of the 7th Annual Conf. of Int. Groufor Lean Construction (IGLC-7), Berkeley, Calif., 〈 http://www.ce.berkeley.edu/~tommelein/IGLC-7/ 〉 (September 2005).
-
Tommelein, I. D., and Weissenberger, M. (1999). " More just-in-time: Location of buffers in structural steel supply and construction processes.." Proc. of the 7th Annual Conf. of Int. Group for Lean Construction (IGLC-7), Berkeley, Calif., 〈 http://www.ce.berkeley.edu/ ~tommelein/IGLC-7/ 〉 (September 2005).
-
(1999)
More Just-in-time: Location of Buffers in Structural Steel Supply and Construction Processes
-
-
Tommelein, I.D.1
Weissenberger, M.2
-
33
-
-
1442269235
-
-
Deliverable 4, EU Project-IST-1999-11508, Intelligent Services and Tools for Concurrent Engineering.
-
Wix, J., and Liebich, T. (2000). " Information Flow Scenario.." Deliverable 4, EU Project-IST-1999-11508, Intelligent Services and Tools for Concurrent Engineering.
-
(2000)
Information Flow Scenario
-
-
Wix, J.1
Liebich, T.2
-
34
-
-
38149138805
-
-
Case study research, 3rd Ed., Sage Publications, Thousand Oaks, Calif.
-
Yin, R. K. (2003). Case study research, 3rd Ed., Sage Publications, Thousand Oaks, Calif.
-
(2003)
-
-
Yin, R.K.1
|