메뉴 건너뛰기




Volumn 132, Issue 4, 2006, Pages 393-407

Developing a resource supply chain planning system for construction projects

Author keywords

Construction management; Construction materials; Optimization models; Resource management

Indexed keywords

COSTS; DECISION SUPPORT SYSTEMS; INDUSTRIAL MANAGEMENT; OPTIMIZATION; PROBLEM SOLVING; PROJECT MANAGEMENT; STRATEGIC PLANNING;

EID: 33645150497     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:4(393)     Document Type: Article
Times cited : (63)

References (22)
  • 2
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 3
    • 0003242265 scopus 로고
    • Coordinated, orderless inventory replenishment for a single supplier and multiple buyers through electronic data exchange
    • Banerjee, A., and Banerjee, S. (1992). "Coordinated, orderless inventory replenishment for a single supplier and multiple buyers through electronic data exchange." Int. J. Technol. Manage., 7, 328-336.
    • (1992) Int. J. Technol. Manage. , vol.7 , pp. 328-336
    • Banerjee, A.1    Banerjee, S.2
  • 5
    • 0033338820 scopus 로고    scopus 로고
    • Constraint satisfaction problems: Algorithms and applications
    • Brailsford, S. C., Potts, C. N., and Smith, B. M. (1999). "Constraint satisfaction problems: Algorithms and applications." Eur. J. Oper. Res., 119, 557-581.
    • (1999) Eur. J. Oper. Res. , vol.119 , pp. 557-581
    • Brailsford, S.C.1    Potts, C.N.2    Smith, B.M.3
  • 6
    • 1842782301 scopus 로고    scopus 로고
    • Applicability of e-work models for automation of construction materials management systems
    • Castro-Lacouture, D., and Skibniewski, M. J. (2003). "Applicability of e-work models for automation of construction materials management systems." Prod. Plan. Control, 14(8), 789-797.
    • (2003) Prod. Plan. Control , vol.14 , Issue.8 , pp. 789-797
    • Castro-Lacouture, D.1    Skibniewski, M.J.2
  • 8
    • 0032593166 scopus 로고    scopus 로고
    • Improving the materials supply system in small-sized building firms
    • Formoso, C. T., and Revelo, V. H. (1999). "Improving the materials supply system in small-sized building firms." Autom. Constr., 8, 663-670.
    • (1999) Autom. Constr. , vol.8 , pp. 663-670
    • Formoso, C.T.1    Revelo, V.H.2
  • 9
    • 23044488934 scopus 로고    scopus 로고
    • Role of inventory buffers in construction labor performance
    • Horman, M. J., and Thomas, H. R. (2005). "Role of inventory buffers in construction labor performance." J. Constr. Eng. Manage., 131(7), 834-843.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.7 , pp. 834-843
    • Horman, M.J.1    Thomas, H.R.2
  • 12
    • 0347269130 scopus 로고    scopus 로고
    • Enabling information sharing between E-commerce systems for construction material procurement
    • Kong, S. C. W., Li, H., Hung, T. P. L., Shi, J. W. Z., Castro-Lacouture, D., and Skibniewski, M. (2004). "Enabling information sharing between E-commerce systems for construction material procurement." Autom. Constr., 13, 261-276.
    • (2004) Autom. Constr. , vol.13 , pp. 261-276
    • Kong, S.C.W.1    Li, H.2    Hung, T.P.L.3    Shi, J.W.Z.4    Castro-Lacouture, D.5    Skibniewski, M.6
  • 13
    • 0035509405 scopus 로고    scopus 로고
    • Just-in-time management of precast concrete components
    • Low, S. P., and Choong, J. C. (2001). "Just-in-time management of precast concrete components." J. Constr. Eng. Manage., 127(6), 494-501.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 494-501
    • Low, S.P.1    Choong, J.C.2
  • 14
    • 0022108507 scopus 로고
    • Materials management: Practical application in the construction industry
    • Marsh, J. W. (1985). "Materials management: Practical application in the construction industry." Cost Eng., 27(1), 18-28.
    • (1985) Cost Eng. , vol.27 , Issue.1 , pp. 18-28
    • Marsh, J.W.1
  • 15
    • 0021439741 scopus 로고
    • A quantity discount pricing model to increase vendor's profits
    • Monahan, J. P. (1984). "A quantity discount pricing model to increase vendor's profits." Manage. Sci., 30(6), 720-726.
    • (1984) Manage. Sci. , vol.30 , Issue.6 , pp. 720-726
    • Monahan, J.P.1
  • 16
    • 0034271361 scopus 로고    scopus 로고
    • Importance of capacity constraints to construction cost and schedule
    • O'Brien, W. J., and Fisher, M. A. (2000). "Importance of capacity constraints to construction cost and schedule." J. Constr. Eng. Manage., 126(5), 366-373.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 366-373
    • O'Brien, W.J.1    Fisher, M.A.2
  • 17
    • 13944281790 scopus 로고    scopus 로고
    • Reliability buffering for construction projects
    • Park, M., and Peña-Mora, F. (2004). "Reliability buffering for construction projects." J. Constr. Eng. Manage., 130(5), 626-637.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.5 , pp. 626-637
    • Park, M.1    Peña-Mora, F.2
  • 18
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as lean construction principle
    • Thomas, H. R., Horman, M. J., Minchin, E., Jr., and Chen, D. (2003). "Improving labor flow reliability for better productivity as lean construction principle."J. Constr. Eng. Manage., 129(3), 251-261.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Horman, M.J.2    Minchin Jr., E.3    Chen, D.4
  • 19
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
    • Tommelein, I. D. (1998). "Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique." J. Constr. Eng. Manage., 124(4), 279-288.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 20
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3
  • 21
    • 0036028123 scopus 로고    scopus 로고
    • An accelerated subcontracting and procuring model for construction projects
    • Tserng, H. P., and Lin, P. H. (2002). "An accelerated subcontracting and procuring model for construction projects." Autom. Constr., 11, 105-125.
    • (2002) Autom. Constr. , vol.11 , pp. 105-125
    • Tserng, H.P.1    Lin, P.H.2
  • 22
    • 0037208776 scopus 로고    scopus 로고
    • Developing an electronic acquisition model for project scheduling using XML-based information standard
    • Tserng, H. P., and Lin, W. Y. (2003). "Developing an electronic acquisition model for project scheduling using XML-based information standard." Autom. Constr., 12, 67-95.
    • (2003) Autom. Constr. , vol.12 , pp. 67-95
    • Tserng, H.P.1    Lin, W.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.