Dynamic construction site layout using ant colony optimization
-
Transportation Research Board, Washington DC
-
AbdelRazig, Y., El-Gafy, M., and Ghanem, A. (2006). Dynamic construction site layout using ant colony optimization. 85th Annual Meeting, 06-1715, Transportation Research Board, Washington DC
-
(2006)
85th Annual Meeting, 06-1715
-
-
Abdelrazig, Y.1
El-Gafy, M.2
Ghanem, A.3
-
2
-
-
0001009963
-
Just-in-time application and implementation for building material management
-
0733-9364 10.1061/(ASCE)0733-9364(1987)113:2(222)
-
Akintoye, A. (1995). Just-in-time application and implementation for building material management. Constr. Manage. Econ., 13 (2), 105-113. 0733-9364 10.1061/(ASCE)0733-9364(1987)113:2(222)
-
(1995)
Constr. Manage. Econ.
, vol.13
, Issue.2
, pp. 105-113
-
-
Akintoye, A.1
-
5
-
-
33751362815
-
A case study of IFC and CIS/2 support for steel supply chain processes
-
Weimar, Germany
-
Danso-Amoako, M., O'Brien, W., and Issa, R. (2004). A case study of IFC and CIS/2 support for steel supply chain processes. Proc., 10th Int. Conf. Computing in Civil and Building Engineering (ICCCBE-10), Weimar, Germany, 12.
-
(2004)
Proc., 10th Int. Conf. Computing in Civil and Building Engineering (ICCCBE-10)
, pp. 12
-
-
Danso-Amoako, M.1
O'Brien, W.2
Issa, R.3
-
6
-
-
0004095338
-
-
KanGAL Re 200001, Indian Institute of Technology, Kanpur, India
-
Deb, K., Agrawal, S., Pratab, A., and Meyarivan, T. (2000). A fast elitist no-dominated sorting genetic algorithm for multiobjective optimization: NSGA-II. KanGAL Rep. 200001, Indian Institute of Technology, Kanpur, India.
-
(2000)
A Fast Elitist No-dominated Sorting Genetic Algorithm for Multiobjective Optimization: NSGA-II
-
-
Deb, K.1
Agrawal, S.2
Pratab, A.3
Meyarivan, T.4
-
7
-
-
13944281386
-
Dynamic layout of construction temporary facilities considering safety
-
DOI 10.1061/(ASCE)0733-9364(2004)130:4(534)
-
Elbeltagi, E., Hegazy, T., and Eldosouky, A. (2004). Dynamic layout of construction temporary facilities considering safety. J. Constr. Eng. Manage., 130 (4), 534-541. 0733-9364 10.1061/(ASCE)0733-9364(2004)130:4(534) (Pubitemid 40265350)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.4
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
Eldosouky, A.3
-
8
-
-
60449095441
-
Dynamic site layout planning using approximate dynamic programming
-
0887-3801, 10.1061/(ASCE)0887-3801(2009)23:2(119)
-
El-Rayes, K., and Said, H. (2009). Dynamic site layout planning using approximate dynamic programming. J. Comput. Civ. Eng. 0887-3801, 23 (2) 119-127. 10.1061/(ASCE)0887-3801(2009)23:2(119)
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.2
, pp. 119-127
-
-
El-Rayes, K.1
Said, H.2
-
10
-
-
33847198334
-
Optimization of floor-level construction material layout using genetic algorithms
-
0926-5805 10.1016/j.autcon.2006.09.006
-
Jang, H., Lee, S., and Choi, S. (2007). Optimization of floor-level construction material layout using genetic algorithms. Autom. Constr., 16 (4), 531-545. 0926-5805 10.1016/j.autcon.2006.09.006
-
(2007)
Autom. Constr.
, vol.16
, Issue.4
, pp. 531-545
-
-
Jang, H.1
Lee, S.2
Choi, S.3
-
11
-
-
79959439105
-
Modelling an inventory management in construction operations involving on-site fabrication of raw materials
-
International Grouof Lean Construction, East Lansing, MI
-
Jung, D. Y., Han, S. H., Im, K. S., and Ryu, C. K. (2007). Modelling an inventory management in construction operations involving on-site fabrication of raw materials. Proc., IGLC Conf., International Group of Lean Construction, East Lansing, MI, 367-379.
-
(2007)
Proc., IGLC Conf.
, pp. 367-379
-
-
Jung, D.Y.1
Han, S.H.2
Im, K.S.3
Ryu, C.K.4
-
12
-
-
23244452976
-
Parallel computing framework for optimizing construction planning in large-scale projects
-
DOI 10.1061/(ASCE)0887-3801(2005)19:3(304)
-
Kandil, A., El-Rayes, K. (2005). Parallel computing framework for optimizing construction planning in large scale projects. J. Comput. Civ. Eng. 0887-3801, 19 (3), 304-312. 10.1061/(ASCE)0887-3801(2005)19:3(304) (Pubitemid 41092942)
-
(2005)
Journal of Computing in Civil Engineering
, vol.19
, Issue.3
, pp. 304-312
-
-
Kandil, A.1
El-Rayes, K.2
-
13
-
-
37249037472
-
Minimizing construction-related security risks during airport expansion projects
-
DOI 10.1061/(ASCE)0733-9364(2008)134:1(40)
-
Khalafallah, A., and El-Rayes, K. (2008). Minimizing construction-related security risks during airport expansion projects. J. Constr. Eng. Manage. 0733-9364, 134 (1), 40-48. 10.1061/(ASCE)0733-9364(2008)134:1(40) (Pubitemid 350265377)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.1
, pp. 40-48
-
-
Khalafallah, A.1
El-Rayes, K.2
-
14
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li, H., and Love, P. (1997). Using improved genetic algorithms to facilitate time-cost optimization. J. Constr. Eng. Manage. 0733-9364, 123 (3), 233-237. 10.1061/(ASCE)0733-9364(1997)123:3(233) (Pubitemid 127590561)
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
15
-
-
0002505579
-
-
2nd Ed., Chapman and Hall, New York
-
Magad, E., and Amos, J. (1995). Total materials management: Achieving maximum profits through materials/logistics operations, 2nd Ed., Chapman and Hall, New York.
-
(1995)
Total Materials Management: Achieving Maximum Profits Through Materials/logistics Operations
-
-
Magad, E.1
Amos, J.2
-
16
-
-
33750355732
-
The role of inventory in superior supply chain performance
-
International Series in Operations Research and Management Science, Kluwer Academic, Boston
-
Neale, J., Tomlin, B., and Willems, S. (2006). The role of inventory in superior supply chain performance. The practice of supply chain management: Where theory and application converge. International Series in Operations Research and Management Science, Kluwer Academic, Boston.
-
(2006)
The Practice of Supply Chain Management: Where Theory and Application Converge
-
-
Neale, J.1
Tomlin, B.2
Willems, S.3
-
17
-
-
45749096045
-
An automated system for dynamic construction site layout planning
-
Ain Shams University, Cairo, Egypt
-
Osman, H., Georgy, M., and Ibrahim, M. E. (2003). An automated system for dynamic construction site layout planning. 10th Int. Colloquium on Structural and Geotechnical Engineering, Ain Shams University, Cairo, Egypt.
-
(2003)
10th Int. Colloquium on Structural and Geotechnical Engineering
-
-
Osman, H.1
Georgy, M.2
Ibrahim, M.E.3
-
18
-
-
0000118103
-
The application of JIT philosophy to construction: A case study in site layout
-
0144-6193 10.1080/01446190500041388
-
Pheng, L. S., and Hui, M. S. (1999). The application of JIT philosophy to construction: A case study in site layout. Constr. Manage. Econ., 17 (5), 657-668. 0144-6193 10.1080/01446190500041388
-
(1999)
Constr. Manage. Econ.
, vol.17
, Issue.5
, pp. 657-668
-
-
Pheng, L.S.1
Hui, M.S.2
-
19
-
-
33845809157
-
Simulation-based decision support system for economical supply chain management of rebar
-
DOI 10.1061/(ASCE)0733-9364(2007)133:1(29)
-
Polat, G., Arditi, D., and Mungen, U. (2007). Simulation-based decision support system for economical supply chain management of rebar. J. Constr. Eng. Manage., 133 (1), 29-39. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(29) (Pubitemid 44975048)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.1
, pp. 29-39
-
-
Polat, G.1
Arditi, D.2
Mungen, U.3
-
22
-
-
25844519455
-
JIT and the complementarity of buffers and lot size
-
0733-9364 10.1061/(ASCE)0733-9364(2005)131:7(808)
-
Shmanske, S. (2003). JIT and the complementarity of buffers and lot size. Am. Bus. Rev. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:7(808)
-
(2003)
Am. Bus. Rev.
-
-
Shmanske, S.1
-
23
-
-
23044463065
-
Fundamental principles of site material management
-
DOI 10.1061/(ASCE)0733-9364(2005)131:7(808)
-
Thomas, H. R., Riley, D. R., and Messner, J. I. (2005). Fundamental principles of site materials management. J. Constr. Eng. Manage., 131 (7), 808-815. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:7(808) (Pubitemid 41068302)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.7
, pp. 808-815
-
-
Thomas, H.R.1
Riley, D.R.2
Messner, J.I.3
-
24
-
-
0032673945
-
Loss of productivity due to delivery methods and weather
-
0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(39)
-
Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). Loss of productivity due to delivery methods and weather. J. Constr. Eng. Manage., 125 (1), 39-46. 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(39)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 39-46
-
-
Thomas, H.R.1
Riley, D.R.2
Sanvido, V.E.3
-
25
-
-
0000603336
-
Impact of material management on productivity-A case study
-
0733-9364 10.1061/(ASCE)0733-9364(1989)115:3(370)
-
Thomas, H. R., Sanvido, V. E., and Sanders, S. R. (1989). Impact of material management on productivity-A case study. J. Constr. Eng. Manage., 115 (3), 370-384. 0733-9364 10.1061/(ASCE)0733-9364(1989)115:3(370)
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.3
, pp. 370-384
-
-
Thomas, H.R.1
Sanvido, V.E.2
Sanders, S.R.3
-
26
-
-
33645150497
-
Developing a resource supply chain planning system for construction projects
-
0733-9364 10.1061/(ASCE)0733-9364(2006)132:4(393)
-
Tserng, H. P., Samuel, Y. L., and Sherman, L. (2006). Developing a resource supply chain planning system for construction projects. J. Constr. Eng. Manage., 132 (4), 393-407. 0733-9364 10.1061/(ASCE)0733-9364(2006)132:4(393)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.4
, pp. 393-407
-
-
Tserng, H.P.1
Samuel, Y.L.2
Sherman, L.3
-
27
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(400)
-
Zouein, P. P., and Tommelein, I. D. (1999). Dynamic layout planning using a hybrid incremental solution method. J. Constr. Eng. Manage., 125 (6), 400-408. 0733-9364 10.1061/(ASCE)0733-9364(1999)125:6(400) (Pubitemid 30509594)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.P.1
Tommelein, I.D.2
|