Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects

Author keywords

Cash flow forecasting; Highways; Performance evaluation; Regression analysis

Indexed keywords

CLUSTER ANALYSIS; CONTRACTORS; HIGHWAY PLANNING; PAVEMENTS; REGRESSION ANALYSIS;

EID: 43049090853     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190801918748     Document Type: Article
Times cited : (13)

References (36)
  • 1
    • 79952587611 scopus 로고    scopus 로고
    • ALDOT (Alabama Department of Transportation) Bureau of Construction, ALDOT, NC
    • ALDOT (Alabama Department of Transportation) (2006) Standard Specifications for Highway Construction, Bureau of Construction, ALDOT, NC
    • (2006) Standard Specifications for Highway Construction
  • 2
    • 0033690430 scopus 로고    scopus 로고
    • Probabilistic forecasting of project performance using SS-curves
    • Barraza, G., Back, W. and Mata, F. (2000) Probabilistic forecasting of project performance using SS-curves. ASCE Construction Engineering and Management, 126:2, pp. 142-148.
    • (2000) ASCE Construction Engineering and Management , vol.126 , Issue.2 , pp. 142-148
    • Barraza, G.1    Back, W.2    Mata, F.3
  • 3
    • 13944254406 scopus 로고    scopus 로고
    • Probabilistic forecasting of project performance using stochastic S-curves
    • Barraza, G., Back, W. and Mata, F. (2004) Probabilistic forecasting of project performance using stochastic S-curves. ASCE Construction Engineering and Management, 131:1, pp. 25-32.
    • (2004) ASCE Construction Engineering and Management , vol.131 , Issue.1 , pp. 25-32
    • Barraza, G.1    Back, W.2    Mata, F.3
  • 11
    • 78149239835 scopus 로고
    • How many subjects does it take to do a regression analysis?
    • Green, S. B. (1991) How many subjects does it take to do a regression analysis?. Multivariate Behavioral Research, 26, pp. 499-510.
    • (1991) Multivariate Behavioral Research , vol.26 , pp. 499-510
    • Green, S.B.1
  • 15
    • 0036642995 scopus 로고    scopus 로고
    • Model on cash flow forecasting and risk analysis for contracting firms
    • Hwee, N. and Tiong, R. (2002) Model on cash flow forecasting and risk analysis for contracting firms. International Journal of Project Management, 20, pp. 351-363.
    • (2002) International Journal of Project Management , vol.20 , pp. 351-363
    • Hwee, N.1    Tiong, R.2
  • 16
    • 0001785657 scopus 로고    scopus 로고
    • Toward more flexible and accurate cash flow forecasting
    • Kaka, A. (1996) Toward more flexible and accurate cash flow forecasting. Construction Management and Economics, 14, pp. 35-44.
    • (1996) Construction Management and Economics , vol.14 , pp. 35-44
    • Kaka, A.1
  • 17
    • 0344463113 scopus 로고
    • Modelling standard commitment curves for contractor's cash flow forecasting
    • Kaka, A. and Price, A. (1993) Modelling standard commitment curves for contractor's cash flow forecasting. Construction Management and Economics, 11:4, pp. 271-283.
    • (1993) Construction Management and Economics , vol.11 , Issue.4 , pp. 271-283
    • Kaka, A.1    Price, A.2
  • 18
    • 0006767477 scopus 로고
    • A construction project cash flow model: An idiographic approach
    • Kenley, R. and Wilson, O. D. (1986) A construction project cash flow model: An idiographic approach. Construction Management and Economics, 4, pp. 213-232.
    • (1986) Construction Management and Economics , vol.4 , pp. 213-232
    • Kenley, R.1    Wilson, O.D.2
  • 21
    • 0022043393 scopus 로고
    • Earned value technique for performance measurement
    • McConnell, D. R. (1985) Earned value technique for performance measurement. ASCE Journal of Management in Engineering, 1:2, pp. 79-94.
    • (1985) ASCE Journal of Management in Engineering , vol.1 , Issue.2 , pp. 79-94
    • McConnell, D.R.1
  • 22
  • 24
    • 0041545758 scopus 로고    scopus 로고
    • Cash flow forecasting and updating for building projects
    • Navon, R. (1996) Cash flow forecasting and updating for building projects. Project Management Journal, 27:2, pp. 14-23.
    • (1996) Project Management Journal , vol.27 , Issue.2 , pp. 14-23
    • Navon, R.1
  • 25
    • 0004221507 scopus 로고    scopus 로고
    • NCDOT (North Carolina Department of Transportation) NCDOT, NC
    • NCDOT (North Carolina Department of Transportation) (2006) Standard Specifications, NCDOT, NC
    • (2006) Standard Specifications
  • 26
    • 0020138987 scopus 로고
    • Application of cost-flow forecasting models
    • Peer, S. (1982) Application of cost-flow forecasting models. ASCE Journal of the Construction Division, 108, pp. 226-231.
    • (1982) ASCE Journal of the Construction Division , vol.108 , pp. 226-231
    • Peer, S.1
  • 30
    • 0021616977 scopus 로고
    • Method for forecasting construction contracts
    • Shapanka, A. and Allen, G. (1984) Method for forecasting construction contracts. Transportation Research Record, 955, pp. 26-35.
    • (1984) Transportation Research Record , vol.955 , pp. 26-35
    • Shapanka, A.1    Allen, G.2
  • 32
    • 84857366183 scopus 로고    scopus 로고
    • StatSoft StatSoft, Tulsa, OK
    • StatSoft (2007) STATISTICA Release 8, StatSoft, Tulsa, OK
    • (2007) STATISTICA Release 8
  • 33
    • 0022752876 scopus 로고
    • Cost control: Integrated cost/schedule performance
    • Stevens, W. M. (1986) Cost control: Integrated cost/schedule performance. ASCE Journal of Management in Engineering, 2:3, pp. 157-164.
    • (1986) ASCE Journal of Management in Engineering , vol.2 , Issue.3 , pp. 157-164
    • Stevens, W.M.1
  • 35
    • 43049146947 scopus 로고    scopus 로고
    • VDOT (Virginia Department of Transportation) VDOT, Virginia
    • VDOT (Virginia Department of Transportation) (2005) Construction Manual, VDOT, Virginia
    • (2005) Construction Manual


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.