Volumn 31, Issue , 2013, Pages 31-40

A graph-based model for the identification of the impact of design changes

Author keywords

Change control; Decision making; Keywords; Project management; Project modeling

Indexed keywords

CHANGE CONTROL; CONSTRUCTION PROJECTS; DESIGN CHANGE; GRAPH-BASED; GRAPH-BASED MODELS; KEYWORDS; PROJECT TEAM;

EID: 84871743833     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.11.043     Document Type: Article
Times cited : (23)

References (45)
  • 2
    • 22844440688 scopus 로고    scopus 로고
    • Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process
    • S. Austin, A. Baldwin, B. Li, and P. Waskett Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process Construction Management and Economics 18 (2) 2000 173 182
    • (2000) Construction Management and Economics , vol.182 , pp. 173-182
    • Austin, S.1    Baldwin, A.2    Li, B.3    Waskett, P.4
  • 4
    • 31344474880 scopus 로고    scopus 로고
    • Complex networks: Structure and dynamics
    • DOI 10.1016/j.physrep.2005.10.009, PII S037015730500462X
    • S. Boccaletti, V. Latora, Y. Moreno, M. Chavez, and D.U. Hwang Complex networks: structure and dynamics Physics Reports 424 4-5 2006 175 308 (Pubitemid 43135890)
    • (2006) Physics Reports , vol.424 , Issue.4-5 , pp. 175-308
    • Boccaletti, S.1    Latora, V.2    Moreno, Y.3    Chavez, M.4    Hwang, D.-U.5
  • 6
    • 0035416239 scopus 로고    scopus 로고
    • Applying the design structure matrix to system decomposition and integration problems: A review and new directions
    • DOI 10.1109/17.946528, PII S0018939101067058
    • T.R. Browning Applying the design structure matrix to system decomposition and integration problems: a review and new directions IEEE Transactions on Engineering Management 48 (3) 2001 292 306 (Pubitemid 32933089)
    • (2001) IEEE Transactions on Engineering Management , vol.48 , Issue.3 , pp. 292-306
    • Browning, T.R.1
  • 8
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • D.W.M. Chan, and M.M. Kumaraswamy A comparative study of causes of time overruns in Hong Kong construction projects International Journal of Project Management 15 (1) 1997 55 63 (Pubitemid 127417679)
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 10
    • 34147120474 scopus 로고
    • A note on two problems in connexion with graphs
    • E.W. Dijkstra A note on two problems in connexion with graphs Numerische Mathematik 1 (1) 1959 269 271
    • (1959) Numerische Mathematik , vol.11 , pp. 269-271
    • Dijkstra, E.W.1
  • 12
    • 18144426836 scopus 로고    scopus 로고
    • Building integrated architecture/engineering/construction systems using smart objects: Methodology and implementation
    • DOI 10.1061/(ASCE)0887-3801(2005)19:2(172)
    • M. Halfawy, and T. Froese Building integrated architecture/engineering/ construction systems using smart objects: methodology and implementation Journal of Computing in Civil Engineering 19 (2) 2005 172 181 (Pubitemid 40609904)
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 172-181
    • Halfawy, M.1    Froese, T.2
  • 14
    • 57549117277 scopus 로고    scopus 로고
    • Implementing information systems with project teams using ethnographic-action research
    • T. Hartmann, M. Fischer, and J. Haymaker Implementing information systems with project teams using ethnographic-action research Advanced Engineering Informatics 23 (1) 2009 57 67
    • (2009) Advanced Engineering Informatics , vol.231 , pp. 57-67
    • Hartmann, T.1    Fischer, M.2    Haymaker, J.3
  • 15
    • 74349085999 scopus 로고    scopus 로고
    • Communicating, integrating and improving multidisciplinary design and analysis narratives
    • J.S. Gero, Springer Eindhoven, Netherlands
    • J. Haymaker Communicating, integrating and improving multidisciplinary design and analysis narratives J.S. Gero, Design Computing and Cognition '06 2006 Springer Eindhoven, Netherlands 635 654
    • (2006) Design Computing and Cognition '06 , pp. 635-654
    • Haymaker, J.1
  • 16
    • 9344268866 scopus 로고    scopus 로고
    • Perspectors: Composable, reusable reasoning modules to construct an engineering view from other engineering views
    • J. Haymaker, J. Kunz, B. Suter, and M. Fischer Perspectors: composable, reusable reasoning modules to construct an engineering view from other engineering views Advanced Engineering Informatics 18 (1) 2004 49 67
    • (2004) Advanced Engineering Informatics , vol.181 , pp. 49-67
    • Haymaker, J.1    Kunz, J.2    Suter, B.3    Fischer, M.4
  • 17
    • 31044439391 scopus 로고    scopus 로고
    • Graph transformation in a nutshell
    • DOI 10.1016/j.entcs.2005.12.018, PII S157106610600048X
    • R. Heckel Graph transformation in a nutshell Electronic Notes in Theoretical Computer Science 148 2006 187 198 (Pubitemid 43121243)
    • (2006) Electronic Notes in Theoretical Computer Science , vol.148 , Issue.1 SPEC. ISS. , pp. 187-198
    • Heckel, R.1
  • 18
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • T. Hegazy Optimization of resource allocation and leveling using genetic algorithms Journal of Construction Engineering and Management 125 (3) 1999 167 175
    • (1999) Journal of Construction Engineering and Management , vol.1253 , pp. 167-175
    • Hegazy, T.1
  • 19
    • 0035392368 scopus 로고    scopus 로고
    • Improving design coordination for building projects. I: Information model
    • DOI 10.1061/(ASCE)0733-9364(2001)127:4(322), Reportnr 22178
    • T. Hegazy, E. Zaneldin, and D. Grierson Improving design coordination for building projects. I: Information model Journal of Construction Engineering and Management 127 (4) 2001 322 329 (Pubitemid 32715363)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 322-329
    • Hegazy, T.1    Zaneldin, E.2    Grierson, D.3
  • 20
    • 5444225548 scopus 로고    scopus 로고
    • Statistical analysis of causes for change orders in metropolitan public works
    • DOI 10.1016/j.ijproman.2004.03.005, PII S0263786304000304
    • T. Hsieh, S. Lu, and C. Wu Statistical analysis of causes for change orders in metropolitan public works International Journal of Project Management 22 (8) 2004 679 686 (Pubitemid 39364216)
    • (2004) International Journal of Project Management , vol.22 , Issue.8 , pp. 679-686
    • Hsieh, T.-Y.1    Lu, S.-T.2    Wu, C.-H.3
  • 21
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • C.W. Ibbs Quantitative impacts of project change: size issues Journal of Construction Engineering and Management 123 (3) 1997 308 311 (Pubitemid 127590570)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, C.W.1
  • 22
    • 38149114645 scopus 로고    scopus 로고
    • Feasibility study of an automated tool for identifying the implications of changes in construction projects
    • S. Isaac, and R. Navon Feasibility study of an automated tool for identifying the implications of changes in construction projects Journal of Construction Engineering and Management 134 (2) 2008 139 145
    • (2008) Journal of Construction Engineering and Management , vol.1342 , pp. 139-145
    • Isaac, S.1    Navon, R.2
  • 23
    • 67349247794 scopus 로고    scopus 로고
    • Modeling construction projects as a basis for change control
    • S. Isaac, and R. Navon Modeling construction projects as a basis for change control Automation in Construction 18 (5) 2009 656 664
    • (2009) Automation in Construction , vol.185 , pp. 656-664
    • Isaac, S.1    Navon, R.2
  • 24
    • 4143067931 scopus 로고    scopus 로고
    • Illustrative benchmarking rework and rework costs in Swedish construction industry
    • DOI 10.1061/(ASCE)0742-597X(2002)18:2(76)
    • P.E. Josephson, B. Larsson, and H. Li Illustrative benchmarking rework and rework costs in Swedish construction industry Journal of Management in Engineering 18 (2) 2002 76 83 (Pubitemid 40329148)
    • (2002) Journal of Management in Engineering , vol.18 , Issue.2 , pp. 76-83
    • Josephson, P.-E.1    Larsson, B.2    Li, H.3
  • 25
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • P.F. Kaming, P.O. Olomolaiye, G.D. Holt, and F.C. Harris Factors influencing construction time and cost overruns on high-rise projects in Indonesia Construction Management and Economics 15 (1) 1997 83 94 (Pubitemid 127679842)
    • (1997) Construction Management and Economics , vol.15 , Issue.1 , pp. 83-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 26
    • 4243128193 scopus 로고    scopus 로고
    • On clusterings: Good, bad and spectral
    • R. Kannan, S. Vempala, and A. Vetta On clusterings: good, bad and spectral Journal of the ACM 51 (3) 2004 497 515
    • (2004) Journal of the ACM , vol.513 , pp. 497-515
    • Kannan, R.1    Vempala, S.2    Vetta, A.3
  • 27
  • 28
    • 84871757810 scopus 로고    scopus 로고
    • An IFC-based framework to move beyond individual building elements towards configuring higher level prefabrication
    • (accepted for publication), posted online on 11 Feb 2012
    • A. Khalili, D.K.H. Chua, An IFC-Based Framework to Move beyond Individual Building Elements Towards Configuring Higher Level Prefabrication, Journal of Computing in Civil Engineering, pp. (accepted for publication), posted online on 11 Feb 2012.
    • Journal of Computing in Civil Engineering
    • Khalili, A.1    Chua, D.K.H.2
  • 29
    • 67349144688 scopus 로고    scopus 로고
    • Development of automated change order impact detection and quantification system
    • M.J. Lee, B.Y. Ryoo, K.T. Sullivan, and A.S. Hanna Development of automated change order impact detection and quantification system Automation in Construction 18 (5) 2009 525 535
    • (2009) Automation in Construction , vol.185 , pp. 525-535
    • Lee, M.J.1    Ryoo, B.Y.2    Sullivan, K.T.3    Hanna, A.S.4
  • 30
    • 34249747198 scopus 로고    scopus 로고
    • Understanding and managing iterative error and change cycles in construction
    • DOI 10.1002/sdr.359
    • S. Lee, and F. Pena-Mora Understanding and managing iterative error and change cycles in construction System Dynamics Review 23 (1) 2007 35 60 (Pubitemid 46824971)
    • (2007) System Dynamics Review , vol.23 , Issue.1 , pp. 35-60
    • Lee, S.H.1    Pena-Mora, F.2
  • 31
    • 0036680986 scopus 로고    scopus 로고
    • Using systems dynamics to better understand change and rework in construction project management systems
    • DOI 10.1016/S0263-7863(01)00039-4, PII S0263786301000394
    • P.E.D. Love, G.D. Holt, L.Y. Shen, H. Li, and Z. Irani Using systems dynamics to better understand change and rework in construction project management systems International Journal of Project Management 20 2002 425 436 (Pubitemid 34490374)
    • (2002) International Journal of Project Management , vol.20 , Issue.6 , pp. 425-436
    • Love, P.E.D.1    Holt, G.D.2    Shen, L.Y.3    Li, H.4    Irani, Z.5
  • 32
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • P.E.D. Love, and H. Li Quantifying the causes and costs of rework in construction Construction Management and Economics 18 (4) 2000 479 490
    • (2000) Construction Management and Economics , vol.184 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 33
    • 0035400029 scopus 로고    scopus 로고
    • Productivity oriented analysis of design revisions
    • DOI 10.1080/01446190010017141
    • M.R. Manavazhi, and Z. Xunzhi Productivity oriented analysis of design revisions Construction Management and Economics 19 (4) 2001 379 391 (Pubitemid 32548456)
    • (2001) Construction Management and Economics , vol.19 , Issue.4 , pp. 379-391
    • Manavazhi, M.R.1    Xunshi, Z.2
  • 35
    • 33746375011 scopus 로고    scopus 로고
    • A fuzzy system for evaluating the risk of change in construction projects
    • DOI 10.1016/j.advengsoft.2006.01.006, PII S0965997806000196
    • I.A. Motawa, C.J. Anumba, A. El-Hamalawi, P. Chung, M. Yeoh, and M. Sun Development of a fuzzy system for change prediction in construction projects Advances in Engineering Software 37 (9) 2006 583 591 (Pubitemid 44109792)
    • (2006) Advances in Engineering Software , vol.37 , Issue.9 , pp. 583-591
    • Motawa, I.A.1    Anumba, C.J.2    El-Hamalawi, A.3
  • 36
    • 33846862012 scopus 로고    scopus 로고
    • An integrated system for change management in construction
    • DOI 10.1016/j.autcon.2006.07.005, PII S0926580506000598
    • I.A. Motawa, C.J. Anumba, A. Lee, and F. Pena-Mora An integrated system for change management in construction Automation in Construction 16 2007 368 377 (Pubitemid 46217777)
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 368-377
    • Motawa, I.A.1    Anumba, C.J.2    Lee, S.3    Pena-Mora, F.4
  • 37
    • 10444248884 scopus 로고    scopus 로고
    • Algorithms for automated deduction of topological information
    • T.H. Nguyen, A.A. Oloufab, and K. Nassar Algorithms for automated deduction of topological information Automation in Construction 14 (1) 2005 59 70
    • (2005) Automation in Construction , vol.141 , pp. 59-70
    • Nguyen, T.H.1    Oloufab, A.A.2    Nassar, K.3
  • 38
    • 0035510392 scopus 로고    scopus 로고
    • Dynamic planning for fast-tracking building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2001)127:6(445), Reportnr 22211
    • F. Pena-Mora, and M. Park Dynamic planning for fast-tracking building construction projects Journal of Construction Engineering and Management 127 (6) 2001 445 456 (Pubitemid 33137748)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.6 , pp. 445-456
    • Pena-Mora, F.1    Park, M.2
  • 39
    • 22944440231 scopus 로고    scopus 로고
    • Characterizing complex product architectures
    • DOI 10.1002/sys.10056
    • D.M. Sharman, and A.A. Yassine Characterizing complex product architectures Systems Engineering 7 (1) 2003 35 60 (Pubitemid 41289501)
    • (2004) Systems Engineering , vol.7 , Issue.1 , pp. 35-60
    • Sharman, D.M.1    Yassine, A.A.2
  • 41
    • 52349111896 scopus 로고    scopus 로고
    • Can there be a science of complex systems?
    • Perseus Books Nashua, New Hampshire, United States
    • H.A. Simon Can there be a science of complex systems? International Conference on Complex Systems 2000 Perseus Books Nashua, New Hampshire, United States 3 14
    • (2000) International Conference on Complex Systems , pp. 3-14
    • Simon, H.A.1
  • 42
    • 67349175338 scopus 로고    scopus 로고
    • Taxonomy for change causes and effects in construction projects
    • M. Sun, and X. Meng Taxonomy for change causes and effects in construction projects International Journal of Project Management 27 6 2009 560 572
    • (2009) International Journal of Project Management , vol.27 , Issue.6 , pp. 560-572
    • Sun, M.1    Meng, X.2
  • 44
    • 33847321759 scopus 로고    scopus 로고
    • Why Monte Carlo Simulations of Project Networks Can Mislead
    • T. Williams Why Monte-Carlo simulations of project networks can mislead Project Management Journal 35 (3) 2004 53 61 (Pubitemid 39250301)
    • (2004) Project Management Journal , vol.35 , Issue.3 , pp. 53-61
    • Williams, T.1
  • 45
    • 33749424371 scopus 로고    scopus 로고
    • Using Gaussian copula to simulate repetitive projects
    • Yang I.T., Using Gaussian copula to simulate repetitive projects, Construction Management and Economics, 2006, 249, 901-909.
    • (2006) Construction Management and Economics , vol.249 , pp. 901-909
    • Yang, I.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.