Volumn 125, Issue 4, 1999, Pages 224-232

Impact of change orders on labor efficiency for electrical construction

Author keywords

[No Author keywords available]

Indexed keywords

EFFICIENCY; PERSONNEL; SUPERVISORY PERSONNEL; WORK-REST SCHEDULES;

EID: 0032659199     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:4(224)     Document Type: Article
Times cited : (109)

References (11)
  • 4
    • 11344268966 scopus 로고
    • Quantitative impacts of project change
    • Constr. Industry Inst., University of Texas at Austin, Austin, Tex.
    • Ibbs, C. W., and Allen, W. E. (1995). "Quantitative impacts of project change." Source Document 108, Constr. Industry Inst., University of Texas at Austin, Austin, Tex.
    • (1995) Source Document 108
    • Ibbs, C.W.1    Allen, W.E.2
  • 5
    • 0026173825 scopus 로고
    • Impact of change orders on construction productivity
    • Ottawa
    • Leonard, C., Moselhi, O., and Fazio, P. (1991). "Impact of change orders on construction productivity." Can. J. Civ. Engrg., Ottawa, 18, 484-492.
    • (1991) Can. J. Civ. Engrg. , vol.18 , pp. 484-492
    • Leonard, C.1    Moselhi, O.2    Fazio, P.3
  • 7
    • 0344550687 scopus 로고
    • R. S. Means Co., Inc., Construction Consultants and Publishers, Kingston, Mass.
    • Means illustrated construction dictionary. (1991). R. S. Means Co., Inc., Construction Consultants and Publishers, Kingston, Mass.
    • (1991) Means Illustrated Construction Dictionary
  • 8
    • 0026918024 scopus 로고
    • Quantitative study of contractor evaluation programs and their impact
    • Russell, J. S., and Jaselskis, E. J. (1992). "Quantitative study of contractor evaluation programs and their impact." J. Constr. Engrg. and Mgmt., ASCE, 118(3), 612-624.
    • (1992) J. Constr. Engrg. and Mgmt., ASCE , vol.118 , Issue.3 , pp. 612-624
    • Russell, J.S.1    Jaselskis, E.J.2
  • 10
    • 0022702177 scopus 로고
    • The measured mile: Proving construction inefficiency
    • Zink, D. A. (1986). "The measured mile: Proving construction inefficiency." Cost Engrg., 28(4), 19-21.
    • (1986) Cost Engrg. , vol.28 , Issue.4 , pp. 19-21
    • Zink, D.A.1
  • 11
    • 0025521947 scopus 로고
    • Impacts and construction inefficiency
    • Zink, D. A. (1990). "Impacts and construction inefficiency." Cost Engrg., 32(11), 21-23.
    • (1990) Cost Engrg. , vol.32 , Issue.11 , pp. 21-23
    • Zink, D.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.