메뉴 건너뛰기




Volumn 14, Issue 1, 2005, Pages 59-70

Algorithms for automated deduction of topological information

Author keywords

Automated deduction; Computer aided building design; Solid modeling; Topological information

Indexed keywords

AIR CONDITIONING; ALGORITHMS; COMPUTER AIDED DESIGN; HEATING; MATHEMATICAL MODELS; STRUCTURAL DESIGN; THREE DIMENSIONAL; TOPOLOGY; VENTILATION;

EID: 10444248884     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2004.07.015     Document Type: Article
Times cited : (47)

References (12)
  • 3
    • 10444269907 scopus 로고    scopus 로고
    • Three-dimensional computer models and the fully integrated and automated project process for the management of construction
    • F.H. Griffis, C. Starts, Three-dimensional computer models and the fully integrated and automated project process for the management of construction, Construction Industry Institute Report, RR152-11, (2001).
    • (2001) Construction Industry Institute Report , vol.RR152-11
    • Griffis, F.H.1    Starts, C.2
  • 5
    • 10444245591 scopus 로고    scopus 로고
    • Industry Foundation Classes IFC Release 2.X
    • International Alliance for Interoperability, http://www.iai.org. Industry Foundation Classes IFC Release 2.X, 2001.
    • (2001)
  • 10


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.