-
2
-
-
0003482617
-
-
Prentice-Hall: Upper Saddle River, NJ;
-
Badiru A, Pulat S. 1995. Comprehensive Project Management: Integrating Optimization Models, Management Principles, and Computers. Prentice-Hall: Upper Saddle River, NJ; 107-115.
-
(1995)
Comprehensive Project Management: Integrating Optimization Models, Management Principles, and Computers
, pp. 107-115
-
-
Badiru, A.1
Pulat, S.2
-
3
-
-
34249664170
-
-
project acceleration. CIFE Working Paper #WP088, August, Stanford University, Palo Alto, CA
-
Chachere J, Kunz J, Levitt R. 2004. Observation, theory, and simulation of integrated concurrent engineering: risk analysis using formal models of radical project acceleration. CIFE Working Paper #WP088, August, 2004, Stanford University, Palo Alto, CA.
-
(2004)
Observation, theory, and simulation of integrated concurrent engineering: Risk analysis using formal models of radical
-
-
Chachere, J.1
Kunz, J.2
Levitt, R.3
-
4
-
-
83755202997
-
Naval ship production: A claim settled and a framework built
-
Cooper K. 1980. Naval ship production: a claim settled and a framework built. Interfaces 10(6): 20-36.
-
(1980)
Interfaces
, vol.10
, Issue.6
, pp. 20-36
-
-
Cooper, K.1
-
5
-
-
0004603683
-
A quantitative study of post contract award design changes in construction
-
Cox ID, Morris JP, Rogerson JH, Jared GE. 1999. A quantitative study of post contract award design changes in construction. Construction Management and Economics 17(4): 427-439.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.4
, pp. 427-439
-
-
Cox, I.D.1
Morris, J.P.2
Rogerson, J.H.3
Jared, G.E.4
-
7
-
-
0002132859
-
Dynamic modeling of product development processes
-
Ford D, Sterman J. 1998. Dynamic modeling of product development processes. System Dynamics Review 14(1): 31-68.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 31-68
-
-
Ford, D.1
Sterman, J.2
-
8
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy T. 1999. Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management 125(3): 167-175.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
9
-
-
0004706464
-
Fast-tracking's impact on project change
-
Ibbs W, Lee S, Li M. 1998. Fast-tracking's impact on project change. Project Management Journal 29(4): 35-42.
-
(1998)
Project Management Journal
, vol.29
, Issue.4
, pp. 35-42
-
-
Ibbs, W.1
Lee, S.2
Li, M.3
-
10
-
-
0032593163
-
The causes and costs of defects in construction: A study of seven building projects
-
Josephson P, Hammarlund Y. 1999. The causes and costs of defects in construction: a study of seven building projects. Automation in Construction 8(6): 681-687.
-
(1999)
Automation in Construction
, vol.8
, Issue.6
, pp. 681-687
-
-
Josephson, P.1
Hammarlund, Y.2
-
11
-
-
33846659892
-
System Dynamics Approach for Error and Change Management in Concurrent Design and Construction
-
IEEE, Piscataway, NJ
-
Lee S, Peña-Mora F. 2005. System Dynamics Approach for Error and Change Management in Concurrent Design and Construction. 2005 Winter Simulation Conference, IEEE, Piscataway, NJ.
-
(2005)
Winter Simulation Conference
, pp. 2005
-
-
Lee, S.1
Peña-Mora, F.2
-
12
-
-
27644469701
-
Reliability and stability buffering approach in concurrent design and construction projects
-
Blacksburg, VA, 22-24 July
-
Lee S, Peña-Mora F, Park M. 2003. Reliability and stability buffering approach in concurrent design and construction projects. In International Group of Lean Construction 11th Annual Conference, Blacksburg, VA, 22-24 July 2003.
-
(2003)
International Group of Lean Construction 11th Annual Conference
-
-
Lee, S.1
Peña-Mora, F.2
Park, M.3
-
13
-
-
25444435990
-
Quality and change management model for large scale concurrent design and construction projects
-
Lee S, Peña-Mora F, Park M. 2005. Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, ASCE, 131(8): 890-902.
-
(2005)
Journal of Construction Engineering and Management, ASCE
, vol.131
, Issue.8
, pp. 890-902
-
-
Lee, S.1
Peña-Mora, F.2
Park, M.3
-
14
-
-
0001446357
-
Strategic management of complex projects: A case study using system dynamics
-
Lyneis J, Cooper K, Els S. 2001. Strategic management of complex projects: a case study using system dynamics. System Dynamics Review 17(3): 237-260.
-
(2001)
System Dynamics Review
, vol.17
, Issue.3
, pp. 237-260
-
-
Lyneis, J.1
Cooper, K.2
Els, S.3
-
15
-
-
0031371933
-
State-based Probabilistic Scheduling Using Stroboscope's CPM Add-On
-
Minneapolis, MN, Oct. 4-8
-
Martinez JC, Ioannou PG. 1997. State-based Probabilistic Scheduling Using Stroboscope's CPM Add-On. Proceedings of Construction Congress V, Minneapolis, MN, Oct. 4-8, 1997, pp. 438-445.
-
(1997)
Proceedings of Construction Congress
, vol.5
, pp. 438-445
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
16
-
-
14544291592
-
Change orders impact on labor productivity
-
Moselhi O, Assem I, El-Rayes K. 2005. Change orders impact on labor productivity. Journal of Construction Engineering and Management, ASCE 131(3): 354-359.
-
(2005)
Journal of Construction Engineering and Management, ASCE
, vol.131
, Issue.3
, pp. 354-359
-
-
Moselhi, O.1
Assem, I.2
El-Rayes, K.3
-
17
-
-
33846862012
-
An integrated system for change management in construction
-
Elsevier: Oxford, UK
-
Motawa I, Anumba C, Lee S, Peña-Mora F. 2007. An integrated system for change management in construction. Automation in Construction, Elsevier: Oxford, UK. Vol. 16, pp. 368-377.
-
(2007)
Automation in Construction
, vol.16
, pp. 368-377
-
-
Motawa, I.1
Anumba, C.2
Lee, S.3
Peña-Mora, F.4
-
18
-
-
0142025004
-
Dynamic change management for construction: Introducing change cycle into model-based project management
-
Park M, Peña-Mora F. 2003. Dynamic change management for construction: introducing change cycle into model-based project management. System Dynamics Review 19(3):213-242.
-
(2003)
System Dynamics Review
, vol.19
, Issue.3
, pp. 213-242
-
-
Park, M.1
Peña-Mora, F.2
-
19
-
-
34249683003
-
-
Richardson G, Pugh AL III. 1981. Introduction to System Dynamics Modeling with Dynamo. MIT Press: Cambridge, MA (available from Pegasus Communications: Waltham, MA).
-
Richardson G, Pugh AL III. 1981. Introduction to System Dynamics Modeling with Dynamo. MIT Press: Cambridge, MA (available from Pegasus Communications: Waltham, MA).
-
-
-
-
20
-
-
0000228602
-
System dynamics in project management: A comparative analysis with traditional methods
-
Rodrigues A, Bowers J. 1996. System dynamics in project management: a comparative analysis with traditional methods. System Dynamics Review 12(2): 121-139.
-
(1996)
System Dynamics Review
, vol.12
, Issue.2
, pp. 121-139
-
-
Rodrigues, A.1
Bowers, J.2
-
21
-
-
0031672864
-
System dynamics in project management: Assessing the impacts of client behavior on project performance
-
Rodrigues A, Williams T. 1998. System dynamics in project management: assessing the impacts of client behavior on project performance. Journal of the Operational Research Society 49(1): 2-15.
-
(1998)
Journal of the Operational Research Society
, vol.49
, Issue.1
, pp. 2-15
-
-
Rodrigues, A.1
Williams, T.2
|