Frequency of change orders in highway construction using alternate count-data modeling methods
-
(a). JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000198
-
Anastasopoulos, P., Labi, S., Bhargava, A., Bordat, C., and, Mannering, F. (2010 a). Frequency of change orders in highway construction using alternate count-data modeling methods. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (8), 886-893. 10.1061/(ASCE)CO.1943-7862.0000198
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.8
, pp. 886-893
-
-
Anastasopoulos, P.1
Labi, S.2
Bhargava, A.3
Bordat, C.4
Mannering, F.5
-
2
-
-
84859563862
-
-
Empirical assessment of the likelihood and duration of highway project time delays. JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000437
-
Anastasopoulos, P., Labi, S., Bhargava, A., and, Mannering, F. (2012). Empirical assessment of the likelihood and duration of highway project time delays. J. Constr. Eng. Manage. JCEMD4 0733-9364, 138 (3), 390-398. 10.1061/(ASCE)CO.1943-7862.0000437
-
(2012)
J. Constr. Eng. Manage.
, vol.138
, Issue.3
, pp. 390-398
-
-
Anastasopoulos, P.1
Labi, S.2
Bhargava, A.3
Mannering, F.4
-
3
-
-
76749103889
-
Analyzing duration and prolongation of performance-based contracts using hazard-based duration and zero-inflated random parameters Poisson models
-
TRRED 0361-1981, 10.3141/2136-02
-
Anastasopoulos, P., Labi, S., and, McCullouch, B. (2009). Analyzing duration and prolongation of performance-based contracts using hazard-based duration and zero-inflated random parameters Poisson models. Transport Res Rec TRRED 0361-1981, 2136, 11-19. 10.3141/2136-02
-
(2009)
Transport Res Rec
, vol.2136
, pp. 11-19
-
-
Anastasopoulos, P.1
Labi, S.2
McCullouch, B.3
-
4
-
-
78449246212
-
Influence of highway project characteristics on contract type selection: Empirical assessment
-
(b). JITSE4 1076-0342, 10.1061/(ASCE)IS.1943-555X.0000035
-
Anastasopoulos, P., Labi, S., McCullouch, B., Karlaftis, M., and, Moavenzadeh, F. (2010 b). Influence of highway project characteristics on contract type selection: Empirical assessment. J. Infrastruct. Syst. JITSE4 1076-0342, 16 (4), 323-333. 10.1061/(ASCE)IS.1943-555X.0000035
-
(2010)
J. Infrastruct. Syst.
, vol.16
, Issue.4
, pp. 323-333
-
-
Anastasopoulos, P.1
Labi, S.2
McCullouch, B.3
Karlaftis, M.4
Moavenzadeh, F.5
-
5
-
-
78449257652
-
Cost savings analysis of performance-based contracts for highway maintenance operations
-
(c). JITSE4 1076-0342, 10.1061/(ASCE)IS.1943-555X.0000012
-
Anastasopoulos, P., McCullouch, B., Gkritza, K., Mannering, F., and, Sinha, K. C. (2010 c). Cost savings analysis of performance-based contracts for highway maintenance operations. J. Infrastruct. Syst. JITSE4 1076-0342, 16 (4), 251-263. 10.1061/(ASCE)IS.1943-555X.0000012
-
(2010)
J. Infrastruct. Syst.
, vol.16
, Issue.4
, pp. 251-263
-
-
Anastasopoulos, P.1
McCullouch, B.2
Gkritza, K.3
Mannering, F.4
Sinha, K.C.5
-
6
-
-
73149114843
-
Crucial silences: When accountability met PFI and finance capital
-
1045-2354, 10.1016/j.cpa.2008.09.009
-
Asenova, D., and, Beck, M. (2010). Crucial silences: When accountability met PFI and finance capital. Crit. Perspect. Account. 1045-2354, 21 (1), 1-13. 10.1016/j.cpa.2008.09.009
-
(2010)
Crit. Perspect. Account.
, vol.21
, Issue.1
, pp. 1-13
-
-
Asenova, D.1
Beck, M.2
-
7
-
-
13944265044
-
Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2003)129:4(405)
-
Attalla, M., and, Hegazy, T. (2003). Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 405-411. 10.1061/(ASCE)0733- 9364(2003)129:4(405)
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 405-411
-
-
Attalla, M.1
Hegazy, T.2
-
9
-
-
34249714735
-
A survey of the payment mechanisms for transportation DBFO projects in British Columbia
-
CMECF3 0144-6193, 10.1080/01446190601161465
-
Aziz, A. (2007). A survey of the payment mechanisms for transportation DBFO projects in British Columbia. Constr. Manage. Econ. CMECF3 0144-6193, 25 (5), 529-543. 10.1080/01446190601161465
-
(2007)
Constr. Manage. Econ.
, vol.25
, Issue.5
, pp. 529-543
-
-
Aziz, A.1
-
10
-
-
70549088264
-
Auctions versus negotiations in procurement: An empirical analysis
-
8756-6222, 10.1093/jleo/ewn002
-
Bajari, P., McMillan, R., and, Tadelis, S. (2009). Auctions versus negotiations in procurement: An empirical analysis. J. Law Econ. Organ. 8756-6222, 25 (2), 372-399. 10.1093/jleo/ewn002
-
(2009)
J. Law Econ. Organ.
, vol.25
, Issue.2
, pp. 372-399
-
-
Bajari, P.1
McMillan, R.2
Tadelis, S.3
-
11
-
-
0037593667
-
Some lessons from using PFI for school building projects
-
0300-3930, 10.1080/03003930308559372
-
Ball, R., Heafey, M., and, King, D. (2003). Some lessons from using PFI for school building projects. Local Gov. Stud. 0300-3930, 29 (2), 89-106. 10.1080/03003930308559372
-
(2003)
Local Gov. Stud.
, vol.29
, Issue.2
, pp. 89-106
-
-
Ball, R.1
Heafey, M.2
King, D.3
-
12
-
-
34250652400
-
The private finance initiative in the UK
-
1471-9037, 10.1080/14719030701340507
-
Ball, R., Heafey, M., and, King, D. (2007). The private finance initiative in the UK. Public Manage. Rev. 1471-9037, 9 (2), 289-310. 10.1080/14719030701340507
-
(2007)
Public Manage. Rev.
, vol.9
, Issue.2
, pp. 289-310
-
-
Ball, R.1
Heafey, M.2
King, D.3
-
13
-
-
77958138408
-
Three-stage least squares analysis of time and cost overruns in construction contracts
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000225
-
Bhargava, A., Anastasopoulos, P., Labi, S., Sinha, K. C., and, Mannering, F. (2010). Three-stage least squares analysis of time and cost overruns in construction contracts. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (11), 1207-1218. 10.1061/(ASCE)CO.1943-7862.0000225
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.11
, pp. 1207-1218
-
-
Bhargava, A.1
Anastasopoulos, P.2
Labi, S.3
Sinha, K.C.4
Mannering, F.5
-
15
-
-
33645413369
-
-
The economics of contracts and the renewal of economics. Brosseau, E. and Glachan, J. eds. Cambridge University Press, Cambridge.
-
Brousseau, E., and, Glachant, J. (2002). The economics of contracts and the renewal of economics. The Economics of Contracts: Theories and Applications, Brosseau, E., and Glachan, J., eds., Cambridge University Press, Cambridge, 3-30.
-
(2002)
The Economics of Contracts: Theories and Applications
, pp. 3-30
-
-
Brousseau, E.1
Glachant, J.2
-
16
-
-
77952581941
-
The dark and bright sides of renegotiation: An application to transport concession contracts
-
UPOLEQ 0957-1787, 10.1016/j.jup.2009.07.003
-
Brux, J. (2010). The dark and bright sides of renegotiation: An application to transport concession contracts. Util. Policy UPOLEQ 0957-1787, 18 (2), 77-85. 10.1016/j.jup.2009.07.003
-
(2010)
Util. Policy
, vol.18
, Issue.2
, pp. 77-85
-
-
Brux, J.1
-
17
-
-
84870903630
-
-
Canadian Council for Public-Private Partnerships (CCPPP). Canadian Council for Public-Private Partnerships, Toronto.
-
Canadian Council for Public-Private Partnerships (CCPPP). (2010). International PPP schools survey report: PPP schools - the view from within, Canadian Council for Public-Private Partnerships, Toronto.
-
(2010)
International PPP Schools Survey Report: PPP Schools - The View from Within
-
-
-
21
-
-
79952510763
-
Viability of municipal companies in the provision of urban infrastructure services
-
0300-3930, 10.1080/03003930.2010.548551
-
Cruz, N., and, Marques, R. (2011). Viability of municipal companies in the provision of urban infrastructure services. Local Gov. Stud. 0300-3930, 37 (1), 93-110. 10.1080/03003930.2010.548551
-
(2011)
Local Gov. Stud.
, vol.37
, Issue.1
, pp. 93-110
-
-
Cruz, N.1
Marques, R.2
-
22
-
-
84866023116
-
-
Mixed companies and local governance: No man can serve two masters. in press.
-
Cruz, N., and, Marques, R. (2012). Mixed companies and local governance: No man can serve two masters. Public administration, in press.
-
(2012)
Public Administration
-
-
Cruz, N.1
Marques, R.2
-
23
-
-
72549105595
-
Accountability and value for money in private finance initiative contracts
-
0267-4424, 10.1111/fam.2008.24.issue-4
-
Demirag, I., and, Khadaroo, I. (2008). Accountability and value for money in private finance initiative contracts. Finan. Account. Manage. 0267-4424, 24 (4), 455-478. 10.1111/fam.2008.24.issue-4
-
(2008)
Finan. Account. Manage.
, vol.24
, Issue.4
, pp. 455-478
-
-
Demirag, I.1
Khadaroo, I.2
-
24
-
-
72549097258
-
Costs, outputs and outcomes in school PFI contracts and the significance of project size
-
1467-9302
-
Demirag, I., and, Khadaroo, I. (2010). Costs, outputs and outcomes in school PFI contracts and the significance of project size. Public Money Manage. 1467-9302, 30 (1), 13-18.
-
(2010)
Public Money Manage.
, vol.30
, Issue.1
, pp. 13-18
-
-
Demirag, I.1
Khadaroo, I.2
-
25
-
-
0001849038
-
Why regulate utilities?
-
JLLEA7 0022-2186, 10.1086/jle.1968.11.issue-1
-
Demsetz, H. (1968). Why regulate utilities? J. Law Econ. JLLEA7 0022-2186, 11 (1), 55-65. 10.1086/jle.1968.11.issue-1
-
(1968)
J. Law Econ.
, vol.11
, Issue.1
, pp. 55-65
-
-
Demsetz, H.1
-
26
-
-
9144261866
-
-
Dept. of the Environment, Transport and the Regions (DETR). Dept. of the Environment, Transport and the Regions, London.
-
Dept. of the Environment, Transport and the Regions (DETR). (2000). KPI Rep. for The Minister for Construction, Dept. of the Environment, Transport and the Regions, London.
-
(2000)
KPI Rep. for the Minister for Construction
-
-
-
27
-
-
70449410981
-
Project versus process management in public-private partnership: Relation between management style and outcomes
-
1096-7494, 10.1080/10967490903094350
-
Edelenbos, J., and, Klijn, E. (2009). Project versus process management in public-private partnership: Relation between management style and outcomes. Int. Public Manag. J. 1096-7494, 12 (3), 310-331. 10.1080/10967490903094350
-
(2009)
Int. Public Manag. J.
, vol.12
, Issue.3
, pp. 310-331
-
-
Edelenbos, J.1
Klijn, E.2
-
29
-
-
27844580574
-
-
European Commission. (b). European Commission, Directorate-General Regional Policy, Brussels.
-
European Commission. (2004 b). Resource book on PPP case studies, European Commission, Directorate-General Regional Policy, Brussels.
-
(2004)
Resource Book on PPP Case Studies
-
-
-
31
-
-
26944464939
-
Are public private partnerships value for money? Evaluating alternative approaches and comparing academic and practitioner views
-
0155-9982, 10.1016/j.accfor.2005.01.001
-
Grimsey, D., and, Lewis, M. (2005). Are public private partnerships value for money? Evaluating alternative approaches and comparing academic and practitioner views. Account. Forum 0155-9982, 29 (4), 345-378. 10.1016/j.accfor.2005.01.001
-
(2005)
Account. Forum
, vol.29
, Issue.4
, pp. 345-378
-
-
Grimsey, D.1
Lewis, M.2
-
33
-
-
11644308477
-
Lane rental: Innovative way to reduce road construction time
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:5(411)
-
Herbsman, Z. J., and, Glagola, C. R. (1998). Lane rental: Innovative way to reduce road construction time. J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (5), 411-417. 10.1061/(ASCE)0733-9364(1998)124:5(411)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.5
, pp. 411-417
-
-
Herbsman, Z.J.1
Glagola, C.R.2
-
35
-
-
84943243138
-
The private finance initiative (PFI) in schools: The experiences of users
-
0267-4424, 10.1111/fam.2006.22.issue-4
-
Ismail, S., and, Pendlebury, M. (2006). The private finance initiative (PFI) in schools: The experiences of users. Finan. Account. Manage. 0267-4424, 22 (4), 381-404. 10.1111/fam.2006.22.issue-4
-
(2006)
Finan. Account. Manage.
, vol.22
, Issue.4
, pp. 381-404
-
-
Ismail, S.1
Pendlebury, M.2
-
36
-
-
0025494340
-
Predictors of cost-overrun rates
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1990)116:3(548)
-
Jahren, C., and, Ashe, A. (1990). Predictors of cost-overrun rates. J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (3), 548-551. 10.1061/(ASCE)0733- 9364(1990)116:3(548)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-551
-
-
Jahren, C.1
Ashe, A.2
-
37
-
-
78449248979
-
Risk allocation in public-private partnership infrastructure projects: A comparative study
-
JITSE4 1076-0342, 10.1061/(ASCE)IS.1943-555X.0000030
-
Ke, Y., Wang, S., and, Chan, A. (2010). Risk allocation in public-private partnership infrastructure projects: A comparative study. J. Infrastruct. Syst. JITSE4 1076-0342, 16 (4), 343-351. 10.1061/(ASCE)IS.1943-555X.0000030
-
(2010)
J. Infrastruct. Syst.
, vol.16
, Issue.4
, pp. 343-351
-
-
Ke, Y.1
Wang, S.2
Chan, A.3
-
38
-
-
55449136747
-
The actual evaluation of school PFI bids for value for money in the UK public sector
-
1045-2354, 10.1016/j.cpa.2007.05.001
-
Khadaroo, I. (2008). The actual evaluation of school PFI bids for value for money in the UK public sector. Crit. Perspect. Account. 1045-2354, 19 (8), 1321-1345. 10.1016/j.cpa.2007.05.001
-
(2008)
Crit. Perspect. Account.
, vol.19
, Issue.8
, pp. 1321-1345
-
-
Khadaroo, I.1
-
39
-
-
12744251343
-
Use of fuzzy logic for predicting design cost overruns on building projects
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2002)128:6(503)
-
Knight, K., and, Fayek, A. M. (2002). Use of fuzzy logic for predicting design cost overruns on building projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (6), 503-512. 10.1061/(ASCE)0733-9364(2002)128:6(503)
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.6
, pp. 503-512
-
-
Knight, K.1
Fayek, A.M.2
-
40
-
-
22144480927
-
Critical success factors for PPP/PFI projects in the UK construction industry
-
CMECF3 0144-6193, 10.1080/01446190500041537
-
Li, B., Akintoye, A., Edwards, P., and, Hardcastle, C. (2005). Critical success factors for PPP/PFI projects in the UK construction industry. Constr. Manage. Econom. CMECF3 0144-6193, 23 (5), 459-471. 10.1080/01446190500041537
-
(2005)
Constr. Manage. Econom.
, vol.23
, Issue.5
, pp. 459-471
-
-
Li, B.1
Akintoye, A.2
Edwards, P.3
Hardcastle, C.4
-
41
-
-
78751513125
-
Risk/reward compensation model for civil engineering infrastructure alliance projects
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000263
-
Love, P. E. D., Davis, P., Chevis, R., and, Edwards, D. (2011). Risk/reward compensation model for civil engineering infrastructure alliance projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 137 (2), 127-136. 10.1061/(ASCE)CO.1943-7862.0000263
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.2
, pp. 127-136
-
-
Love, P.E.D.1
Davis, P.2
Chevis, R.3
Edwards, D.4
-
42
-
-
78449254878
-
Revisiting the strengths and limitations of regulatory contracts in infrastructure industries
-
JITSE4 1076-0342, 10.1061/(ASCE)IS.1943-555X.0000029
-
Marques, R., and, Berg, S. (2010). Revisiting the strengths and limitations of regulatory contracts in infrastructure industries. J. Infrastruct. Syst. JITSE4 1076-0342, 16 (4), 343-351. 10.1061/(ASCE)IS.1943- 555X.0000029
-
(2010)
J. Infrastruct. Syst.
, vol.16
, Issue.4
, pp. 343-351
-
-
Marques, R.1
Berg, S.2
-
43
-
-
83755195604
-
Risks, contracts and private sector participation in infrastruture
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000347
-
Marques, R., and, Berg, S. (2011). Risks, contracts and private sector participation in infrastruture. J. Constr. Eng. Manage. JCEMD4 0733-9364, 137 (11), 925-932. 10.1061/(ASCE)CO.1943-7862.0000347
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.11
, pp. 925-932
-
-
Marques, R.1
Berg, S.2
-
44
-
-
72549108366
-
Changing reasons for public-private partnerships (PPPs)
-
1467-9302
-
McQuaid, R., and, Scherrer, W. (2010). Changing reasons for public-private partnerships (PPPs). Public Money Manage. 1467-9302, 30 (1), 27-34.
-
(2010)
Public Money Manage.
, vol.30
, Issue.1
, pp. 27-34
-
-
McQuaid, R.1
Scherrer, W.2
-
45
-
-
84870953190
-
-
Ministry for Human Resource Development (MHRD). Ministry for Human Resource Development, New Delhi.
-
Ministry for Human Resource Development (MHRD). (2010). Scheme for augmenting school education through public private partnership, Ministry for Human Resource Development, New Delhi.
-
(2010)
Scheme for Augmenting School Education Through Public Private Partnership
-
-
-
46
-
-
84870908759
-
-
Ministry of Education (ME). Ministry of Education, Wellington.
-
Ministry of Education (ME). (2011). NZ schools PPP project: Market sounding, Ministry of Education, Wellington.
-
(2011)
NZ Schools PPP Project: Market Sounding
-
-
-
47
-
-
48249156583
-
The case for public-private partnerships in infrastructure
-
0008-4840, 10.1111/j.1754-7121.2008.00006.x
-
Murphy, T. (2008). The case for public-private partnerships in infrastructure. Can. Public Adm. 0008-4840, 51 (1), 99-126. 10.1111/j.1754-7121. 2008.00006.x
-
(2008)
Can. Public Adm.
, vol.51
, Issue.1
, pp. 99-126
-
-
Murphy, T.1
-
49
-
-
84870954031
-
-
National Development Finance Agency (NDFA). National Development Finance Agency, Dublin, Ireland.
-
National Development Finance Agency (NDFA). (2007). Template project agreement, National Development Finance Agency, Dublin, Ireland.
-
(2007)
Template Project Agreement
-
-
-
53
-
-
84870910666
-
-
Partnerships Victoria. Dept. of Treasury and Finance, Melbourne, Australia.
-
Partnerships Victoria. (2003). Contract management guide, Dept. of Treasury and Finance, Melbourne, Australia.
-
(2003)
Contract Management Guide
-
-
-
54
-
-
84870878509
-
-
Partnerships Victoria. Department of Education and Early Childhood Development, Melbourne, Australia.
-
Partnerships Victoria. (2009). Partnerships Victoria in schools: Project summary, Department of Education and Early Childhood Development, Melbourne, Australia.
-
(2009)
Partnerships Victoria in Schools: Project Summary
-
-
-
55
-
-
84870889381
-
-
PViS. The Partnerships Victoria in Schools Project, ©
-
PViS. (2009). Project Agreement. The Partnerships Victoria in Schools Project, © http://www.partnerships.vic.gov.au (Dec. 2, 2011).
-
(2009)
Project Agreement
-
-
-
56
-
-
55049127767
-
The practice of contracting in public private partnerships: Transaction costs and relational contracting in the Irish schools sector
-
PUADDD 0033-3298, 10.1111/j.1467-9299.2008.00743.x
-
Reeves, E. (2008). The practice of contracting in public private partnerships: Transaction costs and relational contracting in the Irish schools sector. Public Admin. PUADDD 0033-3298, 86 (4), 969-986. 10.1111/j.1467-9299. 2008.00743.x
-
(2008)
Public Admin.
, vol.86
, Issue.4
, pp. 969-986
-
-
Reeves, E.1
-
57
-
-
35348815657
-
Piloting public private partnerships: Expensive lessons from Ireland's schools sector
-
1467-9302, 10.1111/pmam.2007.27.issue-5
-
Reeves, E., and, Ryan, J. (2007). Piloting public private partnerships: Expensive lessons from Ireland's schools sector. Public Money Manage. 1467-9302, 27 (5), 331-337. 10.1111/pmam.2007.27.issue-5
-
(2007)
Public Money Manage.
, vol.27
, Issue.5
, pp. 331-337
-
-
Reeves, E.1
Ryan, J.2
-
58
-
-
78650377741
-
Impact of the capital market collapse on public-private partnership infrastructure projects
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000245
-
Regan, M., Smith, J., and, Love, P. E. D. (2011). Impact of the capital market collapse on public-private partnership infrastructure projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 137 (1), 6-16. 10.1061/(ASCE)CO.1943- 7862.0000245
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.1
, pp. 6-16
-
-
Regan, M.1
Smith, J.2
Love, P.E.D.3
-
59
-
-
84870911829
-
-
Royal Incorporation of Architects in Scotland (RIAS). Royal Incorporation of Architects in Scotland, Edinburgh, Scotland.
-
Royal Incorporation of Architects in Scotland (RIAS). (2002). Quality indicators in the design of schools, Royal Incorporation of Architects in Scotland, Edinburgh, Scotland.
-
(2002)
Quality Indicators in the Design of Schools
-
-
-
60
-
-
0028754078
-
Construction claims and disputes: Causes and cost/time overruns
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1994)120:4(785)
-
Semple, C., Hartman, F. T., and, Jergeas, G. (1994). Construction claims and disputes: Causes and cost/time overruns. J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (4), 785-795. 10.1061/(ASCE)0733-9364(1994)120:4(785)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 785-795
-
-
Semple, C.1
Hartman, F.T.2
Jergeas, G.3
-
61
-
-
40749138185
-
The cost of using private finance to build, finance and operate hospitals
-
1467-9302, 10.1111/j.1467-9302.2008.00628.x
-
Shaoul, J., Stafford, A., and, Stapleton, P. (2008). The cost of using private finance to build, finance and operate hospitals. Public Money Manage. 1467-9302, 28 (2), 101-108. 10.1111/j.1467-9302.2008.00628.x
-
(2008)
Public Money Manage.
, vol.28
, Issue.2
, pp. 101-108
-
-
Shaoul, J.1
Stafford, A.2
Stapleton, P.3
-
62
-
-
33746190783
-
Modeling cost escalation in large infrastructure projects
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:8(853)
-
Touran, A., and, Lopez, R. (2006). Modeling cost escalation in large infrastructure projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (8), 853-860. 10.1061/(ASCE)0733-9364(2006)132:8(853)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.8
, pp. 853-860
-
-
Touran, A.1
Lopez, R.2
-
63
-
-
76749114735
-
Public-private partnerships: Eight rules for governments
-
(a). 1087-724X, 10.1177/1087724X08323843
-
Vining, A., and, Boardman, A. (2008 a). Public-private partnerships: Eight rules for governments. Public Works Manage. Policy 1087-724X, 13 (2), 149-161. 10.1177/1087724X08323843
-
(2008)
Public Works Manage. Policy
, vol.13
, Issue.2
, pp. 149-161
-
-
Vining, A.1
Boardman, A.2
-
64
-
-
48249149904
-
Public-private partnerships in Canada: Theory and evidence
-
(b). 0008-4840, 10.1111/j.1754-7121.2008.00003.x
-
Vining, A., and, Boardman, A. (2008 b). Public-private partnerships in Canada: Theory and evidence. Can. Public Admin. 0008-4840, 51 (1), 9-44. 10.1111/j.1754-7121.2008.00003.x
-
(2008)
Can. Public Admin.
, vol.51
, Issue.1
, pp. 9-44
-
-
Vining, A.1
Boardman, A.2
-
67
-
-
77949759599
-
Performance objectives selection model in public-private partnership projects based on the perspective of stakeholders
-
JMENEA 0742-597X, 10.1061/(ASCE)ME.1943-5479.0000011
-
Yuan, J., Skibniewski, M., Li, Q., and, Zheng, L. (2010). Performance objectives selection model in public-private partnership projects based on the perspective of stakeholders. J. Manage. Eng. JMENEA 0742-597X, 26 (2), 89-104. 10.1061/(ASCE)ME.1943-5479.0000011
-
(2010)
J. Manage. Eng.
, vol.26
, Issue.2
, pp. 89-104
-
-
Yuan, J.1
Skibniewski, M.2
Li, Q.3
Zheng, L.4
-
68
-
-
76549114840
-
Cutting costs and improving quality through performance-based road management and maintenance contracts - The Latin American and OECD experiences
-
Zietlow, G. (2005). Cutting costs and improving quality through performance-based road management and maintenance contracts - The Latin American and OECD experiences. Proc., Senior Road Executives Programme, Restructuring Road Management, Univ. of Birmingham, Birmingham, United Kingdom.
-
(2005)
Proc. Senior Road Executives Programme, Restructuring Road Management, Univ. of Birmingham, Birmingham, United Kingdom.
-
-
Zietlow, G.1
|