-
1
-
-
0033883312
-
Construction delay: A quantitative analysis
-
DOI 10.1016/S0263-7863(98)00060-X
-
Al-Momani, A. H. (2000). Construction delay: A quantitative analysis.. Int. J. Proj. Manage. 0263-7863, 18 (1), 51-59. 10.1016/S0263-7863(9800060-X) (Pubitemid 30509472)
-
(2000)
International Journal of Project Management
, vol.18
, Issue.1
, pp. 51-59
-
-
Al-Momani, A.H.1
-
2
-
-
76749103889
-
Analyzing the duration and prolongation of performance-based contracts through hazard-based duration and zero-inflated random parameters Poisson models
-
0361-1981, 10.3141/2136-02
-
Anastasopoulos, P. Ch., Labi S., and McCullouch, B. G. (2009). Analyzing the duration and prolongation of performance-based contracts through hazard-based duration and zero-inflated random parameters Poisson models.. Transp. Res. Rec. 0361-1981, 2136, 11-19. 10.3141/2136-02
-
(2009)
Transp. Res. Rec.
, vol.2136
, pp. 11-19
-
-
Anastasopoulos, P.Ch.1
Labi, S.2
McCullouch, B.G.3
-
3
-
-
57849139673
-
A note on modeling vehicle-accident frequencies with random-parameters count models
-
0001-4575, 10.1016/j.aa2008.10.005
-
Anastasopoulos, P. Ch., and Mannering, F. L. (2009). A note on modeling vehicle-accident frequencies with random-parameters count models.. Accid. Anal. Prev. 0001-4575, 41 (1), 153-159. 10.1016/j.aap.2008.10.005
-
(2009)
Accid. Anal. Prev.
, vol.41
, Issue.1
, pp. 153-159
-
-
Anastasopoulos, P.Ch.1
Mannering, F.L.2
-
4
-
-
79952448220
-
An empirical assessment of fixed and random parameter logit models using crash- and non-crash-specific injury data
-
0001-4575, 10.1016/j.aa2010.12.024
-
Anastasopoulos, P. Ch., and Mannering, F. L. (2011). An empirical assessment of fixed and random parameter logit models using crash- and non-crash-specific injury data.. Accid. Anal. Prev. 0001-4575, 43 (3), 1140-1147. 10.1016/j.aap.2010.12.024
-
(2011)
Accid. Anal. Prev.
, vol.43
, Issue.3
, pp. 1140-1147
-
-
Anastasopoulos, P.Ch.1
Mannering, F.L.2
-
5
-
-
0006865274
-
Reasons for delays in public projects in Turkey
-
0144-6193, 10.1080/01446198500000013
-
Arditi, D., Akan, G. T., and Gurdamer, S. (1985). Reasons for delays in public projects in Turkey.. J. Constr. Manage. Econ. 0144-6193, 3 (2), 171-181. 10.1080/01446198500000013
-
(1985)
J. Constr. Manage. Econ.
, vol.3
, Issue.2
, pp. 171-181
-
-
Arditi, D.1
Akan, G.T.2
Gurdamer, S.3
-
6
-
-
0042313906
-
Simulation estimation of mixed discrete choice models using randomized and scrambled Halton sequences
-
DOI 10.1016/S0191-2615(02)00090-5
-
Bhat, C. (2003). Simulation estimation of mixed discrete choice models using randomized and scrambled Halton sequences.. Transport. Res. Part B 0191-2615, 37 (9), 837-855. 10.1016/S0191-2615(02)00090-5 (Pubitemid 36901454)
-
(2003)
Transportation Research Part B: Methodological
, vol.37
, Issue.9
, pp. 837-855
-
-
Bhat, C.R.1
-
7
-
-
0031078243
-
A comparative study of causes of time overruns in Hong Kong construction projects
-
Chan, D., and Kumaraswamy, M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects.. Int. J. Proj. Manage. 0263-7863, 15 (1), 55-63. 10.1016/S0263-7863(96)00039-7 (Pubitemid 127417679)
-
(1997)
International Journal of Project Management
, vol.15
, Issue.1
, pp. 55-63
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
8
-
-
57749119938
-
-
NCHRP 20-24, Transportation Research Board, National Research Council, Washington, DC
-
Ellis, R., and Thomas, R. (2002). The root causes of delays in highway construction.. NCHRP 20-24, Transportation Research Board, National Research Council, Washington, DC
-
(2002)
The Root Causes of Delays in Highway Construction
-
-
Ellis, R.1
Thomas, R.2
-
9
-
-
0038721064
-
Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
-
DOI 10.1016/S0263-7863(02)00055-8
-
Frimpong, Y., Oluwoyeb, J., and Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.. Int. J. Proj. Manage. 0263-7863, 21 (5), 321-326. 10.1016/S0263-7863(02)00055-8 (Pubitemid 36689540)
-
(2003)
International Journal of Project Management
, vol.21
, Issue.5
, pp. 321-326
-
-
Frimpong, Y.1
Oluwoye, J.2
Crawford, L.3
-
10
-
-
57849122707
-
-
Econometric Software, Inc., Plainview, NY
-
Greene, W. (2007). Limdep, Version 9.0. Econometric Software, Inc., Plainview, NY.
-
(2007)
Limdep, Version 9.0.
-
-
Greene, W.1
-
11
-
-
0002020770
-
On the efficiency of certain quasi-random sequences of points in evaluating multi-dimensional integrals
-
0029-599X, 10.1007/BF01386213
-
Halton, J. (1960). On the efficiency of certain quasi-random sequences of points in evaluating multi-dimensional integrals.. Numer. Math. 0029-599X, 2 (1), 84-90. 10.1007/BF01386213
-
(1960)
Numer. Math.
, vol.2
, Issue.1
, pp. 84-90
-
-
Halton, J.1
-
12
-
-
0025494340
-
Predictors of cost-overrun rates
-
0733-9364, 10.1061/(ASCE)0733-9364(1990)116:3(548)
-
Jahren, C., and Ashe, A. (1990). Predictors of cost-overrun rates.. J. Constr. Eng. Manage. 0733-9364, 116 (3), 548-551. 10.1061/(ASCE)0733-9364(1990) 116:3(548)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-551
-
-
Jahren, C.1
Ashe, A.2
-
13
-
-
0039997969
-
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
-
Kaming, P., Olomolaiye, P., Holt, G., and Harris, F. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia.. Construction Management and Economics 0144-6193, 15 (1), 83-94. 10.1080/014461997373132 (Pubitemid 127679842)
-
(1997)
Construction Management and Economics
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.F.1
Olomolaiye, P.O.2
Holt, G.D.3
Harris, F.C.4
-
14
-
-
0023594272
-
Concurrent delays in construction projects
-
0733-9364, 10.1061/(ASCE)0733-9364(1987)113:4(591)
-
Kraiem, Z. M. (1987). Concurrent delays in construction projects.. J. Constr. Eng. Manage. 0733-9364, 113 (4), 591-601. 10.1061/(ASCE)0733-9364(1987) 113:4(591)
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.4
, pp. 591-601
-
-
Kraiem, Z.M.1
-
15
-
-
33646751898
-
Construction delays in Hong Kong civil engineering projects
-
0733-9364, 10.1061/(ASCE)0733-9364(2006)132:6(636)
-
Lo, T., Fung, I., and Tung, K. (2006). Construction delays in Hong Kong civil engineering projects.. J. Constr. Eng. Manage. 0733-9364, 132 (6), 636-649. 10.1061/(ASCE)0733-9364(2006)132:6(636)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.6
, pp. 636-649
-
-
Lo, T.1
Fung, I.2
Tung, K.3
-
16
-
-
0032072617
-
Factors of non-excusable delays that influence contractors' performance
-
Majid, M., and McCaffer, R. (1998). Factors of non-excusable delays that influence contractor's performance.. J. Manage. Eng. 0742-597X, 14 (3), 42-49. 10.1061/(ASCE)0742-597X(1998)14:3(42) (Pubitemid 128611214)
-
(1998)
Journal of Management in Engineering
, vol.14
, Issue.3
, pp. 42-49
-
-
Abd. Majid, M.Z.1
McCaffer, R.2
-
17
-
-
38149090972
-
Highway accident severities and the mixed logit model: An exploratory empirical analysis
-
0001-4575, 10.1016/j.aa2007.06.006
-
Milton, J. C., Shankar, V. N., and Mannering, F. L. (2008). Highway accident severities and the mixed logit model: An exploratory empirical analysis.. Accid. Anal. Prev. 0001-4575, 40 (1), 260-266. 10.1016/j.aap.2007.06. 006
-
(2008)
Accid. Anal. Prev.
, vol.40
, Issue.1
, pp. 260-266
-
-
Milton, J.C.1
Shankar, V.N.2
Mannering, F.L.3
-
19
-
-
85069304767
-
-
2nd Ed., Chapman & Hall/CRC Boca Raton, FL
-
Washington, S. P., Karlaftis, M. G., and Mannering, F. L. (2011). Statistical and econometric methods for transportation data analysis, 2nd Ed., Chapman & Hall/CRC Boca Raton, FL.
-
(2011)
Statistical and Econometric Methods for Transportation Data Analysis
-
-
Washington, S.P.1
Karlaftis, M.G.2
Mannering, F.L.3
|